05000317/LER-1981-004-03, /03L-0:on 810119,containment Cooler 8-inch SRW Discharge valve,1-CV-1593,failed to Open.Caused by Solenoid valve,1-SV-1593,not Allowing 1-CV-1593 to Open.Solenoid Valve Replaced W/Spare & Parts Kit Installed

From kanterella
(Redirected from ML20003C075)
Jump to navigation Jump to search
/03L-0:on 810119,containment Cooler 8-inch SRW Discharge valve,1-CV-1593,failed to Open.Caused by Solenoid valve,1-SV-1593,not Allowing 1-CV-1593 to Open.Solenoid Valve Replaced W/Spare & Parts Kit Installed
ML20003C075
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 02/17/1981
From: Lagiewski J, Rizzo P
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20003C065 List:
References
LER-81-004-03L, LER-81-4-3L, NUDOCS 8102260571
Download: ML20003C075 (2)


LER-1981-004, /03L-0:on 810119,containment Cooler 8-inch SRW Discharge valve,1-CV-1593,failed to Open.Caused by Solenoid valve,1-SV-1593,not Allowing 1-CV-1593 to Open.Solenoid Valve Replaced W/Spare & Parts Kit Installed
Event date:
Report date:
3171981004R03 - NRC Website

text

U S. NUCLEAR REGULATORY COMIVISSION NRC FORM 366 (7 77; LICENSEE EVENT REPORT CONTROL BLOCC l l

l l

l l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) lo Iil lM l D l C lC lN l1 l@l Ol 01 -l 010l 0l 0l 0l -l 0l 0l@l 4] 1l ll 1l 1l@l l

l@

7 8 9 LICENSEE CODE to IS LICENSE NLMSER 25

6 LaCENSE TYPE JG

$7 6AT$d CON'T IoIiI

,"",R$lLJ@l0l5l0l01013l117l@l01111191811j@l0l211l718l1l@

7 8

60 61 DOCKET NVv8 ER 68 09 EV ENT OATg 74 7%

REPORT O ATE 80 EVENT oESCRIPTION AND PROBABLE CONSEQUENCES h 10 : 21 l At 0430, during the perfonnance of surveillance testino, #14 containment 1

io iai i cooler 8" SRW Discharce Valve (1-CV-1593) failed to ocen (T.S. 3.6.2.2).

I l o 14 i l The control solenoid valve was replaced, tested and the cooler returned I

io is1 I to service at 2055. De Nonnal (4") Discharce CV and Backuo Manual (8")

I lo is I I Discharoe Valve remained operable durino the event. Al so. three redun-f 1 o 17 l l dant containment coolers _were oper ational.

This is not a recetitive I

I i o is i 1 event.

80 OE CO E

%8CC E COMPONENT CODE Sb6 COO'E S

OE l S I B l@ lE l@ l Bl@ l V I Al L l V l 01 P l@ [F_J@ lZ l@

l0l9l 7

8 9

10 11 12 IJ to 19 23 SEQUENTIAL OCCURRENCE REPORT REVISION REPORT NO.

CODE TYPE N O.

LER RO 2

l VENT VEAR l-l l 0l 0l 4l l/l l013l l Ll l-l 10 l

@ag SlIl 21 22 23 24 26 27 28 29 30 31 32 TK N AC 0 C P NT ME HOURS S ei POR b B.

SLPPLIE MANUFAC RER lA l@l Zl@

l Zl@

l Zl@

l01010l0l LY_J@

lYl@

lAl@

lAl419l9l@

33 34 35 6

JJ 40 41 42 43 44 47 CAUSE oESCRIPT1oN AND CORRECTIVE ACTIONS h 1iio1I Solenoid valve 1-SV-1593 (ASCO 206-381-5RUV) would not vent allowino I

mI l-CV-1593 to ocen. The SV was reolaced with a soare, and the failed I

,,,,,I unit operated properly after a carts kit was installed. No failure f

ii;3i l cause is apparent. The failed SV is a new environmentally cualified unit I

mI recently installed in accordance with Facility Chance Recuest 80-1017.

I 80 7

8 9 STA

% POWER CTHER STATUS OtS O RY DISCOVERY OESCRIPTION Ii i s l l E l@ l 0l 910l@l NA l

lBl@l Surveillance Test I

ACTivtTY CO TENT RELEASE AMOUNT OF ACTIVITY LOCATION CP RELEASE l i i s ] l Z l @O OF RELEASE l Zlgl NA l

l NA l

PERSONNEL EXPOS ES l 3 l 7 l l 0"fd"l"0 l@lYl@l '* 9A l

INJVRIES PERSONNE OESCRipnCN@

NuveER 11 l a l l 0 l 0 l 0 l@l NA l

80 7

8 9 11 12 LOSS OF OR DAMAG TO F ACILITY I1 l 9 l l Z l@l NA

.l 80 7

8 9 10 PUBLICITY NRC USE ONLY I 2 l o f l N l@ DESCRIPTION 810226o D l 4s ISSUED l

NA l

IIIIIIi!IIIIl1 68 69 80 ;

7 8 9 10 J.S. La9 ewski/P.G. Rizzo

,gey,,(301) 269-4747/4786 i

1 yAuen,,o,RAn,,

LER NO.

81-04/3L DOCKET NO.

50-317 i

LICENSE NO. UPR-53 EVENT DATE 01-19-81 REPORT DATE 02-17-81 ATTACHMENT CAUSE DESCPIPTION AND CORRECTIVE ACTIONS (CONT'D) 1-SV-1593 would not operate. No wear nor signs of binding were found on internal parts. After installation of an appropriate spare parts kit, the valve operatid satisfactorily.

The solenoid valve was installed as a facility change made necessary after engineering review was conducted in accordance with I&E Bulletin 79-UlB.

Installation took place during the recent refueling outage.

No other tailures of this model are known to date. Therefore, no pre-ventive action is deemed necessdry at this time.