ND-19-1549, ITAAC Closure Notification on Completion of ITAAC 3.3.00.04b (Index Number 782)

From kanterella
(Redirected from ML19364A031)
Jump to navigation Jump to search
ITAAC Closure Notification on Completion of ITAAC 3.3.00.04b (Index Number 782)
ML19364A031
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 12/27/2019
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ITAAC 3.3.00.04b, ND-19-1549
Download: ML19364A031 (6)


Text

Michael J. Yox 7825 River Road

^Southern Nuclear Regulatory Affairs Director Vogtle 3 & 4 Waynesboro, GA 30830 706-848-6459 tel DEC 2 7 2019 Docket No.: 52-026 ND-19-1549 10CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 4 ITAAC Closure Notification on Completion of ITAAC 3.3.00.04b (Index Number 7821 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant(VEGP) Unit 4 Inspections, Tests, Analyses, and Acceptance Criteria ITAAC item 3.3.00.04b [Index Number 782]for verifying walls of the waste accumulation room in the radwaste building except for designed openings or penetrations provide shielding during normal operation. The closure process for this ITAAC is based on the guidance described in NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 4 Completion of ITAAC 3.3.00.04b [Index Number 782]

MJY/JRV/sfr

U.S. Nuclear Regulatory Commission ND-19-1549 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKinney (w/o enclosures)

Mr. M. D. Meier(w/o enclosures)

Mr. D. H. Jones(w/o enclosures)

Mr. G. Chick Mr. M. Page Mr. P. Martino Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Requlatorv Commission M . W. Jones (w/o enclosures)

M F. D. Brown M . C. P. Patel M G. J. Khouri Ms. S. E. Temple M N. D. Karlovich M A. Lerch M . C. J. Even M B. J. Kemker Ms. N. C. Coovert M C. Welch M J. Gaslevic M . V. Hall M . G. Armstrong Ms. T. Lamb M . M. Webb M . T. Fredette M . C. Weber M S. Smith M C. Santos Oalethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen

U.S. Nuclear Regulatory Commission ND-19-1549 Page 3 of 3 Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinahouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. CorlettI Ms. L. G. Iller Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-19-1549 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-19-1549 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 4 Completion of ITAAC 3.3.00.04b [Index Number 782]

U.S. Nuclear Regulatory Commission ND-19-1549 Enclosure Page 2 of 3 ITAAC Statement Design Commitment 4.b) Walls of the waste accumulation room In the radwaste building except for designed openings or penetrations provide shielding during normal operation.

Inspections. Tests. Analyses Inspection of the as-bullt radwaste building wall thicknesses will be performed.

Acceptance Criteria A report exists and concludes that the shield walls of the waste accumulation room In the radwaste building except for designed openings or penetrations are consistent with the concrete wall thicknesses of 1'-4", and a concrete wall thickness of 1'-8" near the radwaste bunkers, or the report documents an evaluation of thickness deviations Identified during construction and demonstrates there Is no Impact to compliance with the radiation protection licensing basis.

ITAAC Determination Basis An Inspection was performed to verify that the walls of the waste accumulation room In the radwaste building except for designed openings or penetrations provide shielding during normal operation. The subject ITAAC requires that an Inspection be performed and documented In a report that exists and concludes that the shield walls of the waste accumulation room In the radwaste building except for designed openings or penetrations are consistent with the concrete wall thicknesses of T-4", and a concrete wall thickness of 1'-8" near the radwaste bunkers, or the report documents an evaluation of thickness deviations Identified during construction and demonstrates there Is no Impact to compliance with the radiation protection licensing basis.

Inspections were performed of the as-bullt sections (following concrete placement) In accordance with the measurement guideline APP-GW-IT-001 (Reference 1), which Identified the location and frequency of Inspection points for determining the wall thickness to ensure the resulting measurements are representative of the entire section being Inspected. The measurements are based on the size and construction type of each section. Measurements were taken using survey equipment In accordance with the site survey procedure(Reference 2).

The Vogtle Unit 4 radwaste building walls were measured and documented In Reference 3.

Discrepancies In wall thicknesses that Impact the ITAAC Acceptance Criteria were further addressed In the results and conclusions delineated In Nonconformance and Disposition Reports (N&Ds)as noted In Reference 3.

The Unit 4"Radwaste Building Accumulation Room Concrete Wall Thickness Verification Report" (Reference 3) concludes that the shield walls of the waste accumulation room In the radwaste building except for designed openings or penetrations are In compliance with the radiation protection licensing basis.

References 1 through 3 are available for NRC Inspection as part of the Unit 4 ITAAC 3.3.00.04b Completion Package (Reference 4).

U.S. Nuclear Regulatory Commission ND-19-1549 Enclosure Page 3 of 3 ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company(SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found that there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 3.3.00.04b (Reference 4)and is available for NRC review.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 3.3.00.04b was performed for VEGP Unit 4 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References(available for NRC inspection^

1. APP-GW-IT-001, Rev 0,"Guidelines for Concrete Wall and Slab Thickness Measurements"
2. 26139-000-4MP-T81C-N3201, Rev 5,"Construction Survey"
3. SV4-5030-ITR-800782, Rev 0,"Radwaste Building Accumulation Room Concrete Wall Thickness Verification Report"
4. 3.3.00.04b-U4-CP-Rev 0, ITAAC Completion Package