05000317/LER-1980-068-03, /03L-0:on 801210,control Room Air Conditioning Unit 12 Heaters Found Defective,Rendering Unit Inoperable. Caused by Failure of Heating Elements.New Heating Elements Installed & Unit Returned to Svc

From kanterella
(Redirected from ML19351F645)
Jump to navigation Jump to search
/03L-0:on 801210,control Room Air Conditioning Unit 12 Heaters Found Defective,Rendering Unit Inoperable. Caused by Failure of Heating Elements.New Heating Elements Installed & Unit Returned to Svc
ML19351F645
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 01/09/1981
From: Lagiewski J, Pence W
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19351F641 List:
References
LER-80-068-03L, LER-80-68-3L, NUDOCS 8101130623
Download: ML19351F645 (1)


LER-1980-068, /03L-0:on 801210,control Room Air Conditioning Unit 12 Heaters Found Defective,Rendering Unit Inoperable. Caused by Failure of Heating Elements.New Heating Elements Installed & Unit Returned to Svc
Event date:
Report date:
3171980068R03 - NRC Website

text

U. S. NUCLEAR REGULATCOY COMMISSION NRC FORM 364 (7 77!

UCENSEE EVENT REPORT O.

control block: l l

l l _l l Ih (PLEASE PRINT CR TYPE ALL REQUIREO INFORMATl!N) 1 6

lo It l lM i D l C IC lN l 1 l@l 0,1 l-1010 l0 l010 l-10 l 0 l@l4 l1 l1 Il 11 l@l I

l@

7 8 9 UCENSEE CODE 14 th UCENSE NUMSER 25 26 uCENSE "YPE JQ 5 7 C.=T $8 con'T IoIiI 3uR$ LLj@l015 10l010l3l117 @l1 l9 I1 lnI.oInl@l0l110l9I8l1l@

?

A 60 61 OOCKET NUMSER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT oESCRIPT1oN ANo pro 8ABLE CONSEQUENCES h Io l2l l At 1635, durino normal ooeration, it was discovered that #12 Control I

Room Air Conditioning Unit heaters were defective rendering the unit l

g o i3, l io ni i inoperable (T.S. 3.7.6.1.b).

  1. 12 Control Room Air Conditioning Unit 1

was returned to service at 2100 on 12-12-80. #11 Control Room Air i

io isi l Conditioning Unit remained ooerable throughout this event. Unit 2 was I

io is i i roi7i [

at 73% of oower. This is not a repetitive occurrence.

I 1

i o is i I sud*Oh sMME

'ce*A"

'i'OW s5##E CouPoNENT CooE i s IG l@ O@ IF l@ l X I X l X I X I X I X I@ LI,J@ [Z_j @

iolai 7

8 9

to 11 12 13 18 19 20 LE R/RO EVENT YEAR RE TNO.

COE N.

@ y,Eg i8101

[--j l 016181 y

1013l

[_L_j

[---J LQJ a

21 22 23 24 28 27 28 29 30 31 32 N

Of P

T M

HOURS

e ITT POR S.

J 1.1 MAN RER IA l@y@

lZ l@

L,Z_j@

l010101Ol I NI@

[J,j@

[Lj@

IB l3l5l d@

33 34 35 38 37 40 41 42 43 44 47 CAUSE oESCRIPT1oN AND CORRECTIVE ACTIONS h Ii io l I A check was made of #12 Control Room Air Conditionino Unit and the heat-I ii ii i l ing elements were found to have failed. New heatino elements were in-I li # 21 I stalled and the unit returned to service.

I l

u j a.) I l

11 141 l 80 sTA

% POWER OTHER STATUS I O ER DISCOVERY DESCRIPTION lt Is 1 [D,.j @ l 0 l 0 l 0 l @ l NA I

W @l Oneratne ChurvaHnn l

A!nviTY Co'# TENT LOCATION OP RELEASE 8;ELEASED CP RELEASE AMOUNTOP ACTivtTY l

NA l

l l

Lus) LZ._J @ LIJ@OEs SERsoNNEL ExPCs oEsCRirnoN @

NUueER TvPE I

j li 171 l01010 l@y@l NA

' PERsoNNEt iN;U!'iEs DESURIPTION@

NUM8ER l

[,,dpJ 0 10 10__l@l NA 1

80 7

8 9 11 12 TV E DE R PT ON l

fI'ITl y @l NA 80 7

8 9 10 is5UE

DESCRIPTION

l lIIIIi1IIIIIli I n V1h Na a 0-88 69 80 J S I aciewski/W.3. Pence psong:(301) 269-4747/4R14

{

$1 N aus nP pnp.ARen