05000311/LER-1981-018-03, /03L-0:on 810515,technicians Calibr Valves 2PS1 & 2PS3 Activated Pressurizer Overpressure Protection Sys, Channel 2,during RCS Pressure Increase.Caused by Personnel Error Due to Improper Implementation of Work Orders

From kanterella
(Redirected from ML19350E858)
Jump to navigation Jump to search
/03L-0:on 810515,technicians Calibr Valves 2PS1 & 2PS3 Activated Pressurizer Overpressure Protection Sys, Channel 2,during RCS Pressure Increase.Caused by Personnel Error Due to Improper Implementation of Work Orders
ML19350E858
Person / Time
Site: Salem PSEG icon.png
Issue date: 06/12/1981
From: Espey J
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19350E850 List:
References
LER-81-018-03L, LER-81-18-3L, NUDOCS 8106230591
Download: ML19350E858 (1)


LER-1981-018, /03L-0:on 810515,technicians Calibr Valves 2PS1 & 2PS3 Activated Pressurizer Overpressure Protection Sys, Channel 2,during RCS Pressure Increase.Caused by Personnel Error Due to Improper Implementation of Work Orders
Event date:
Report date:
3111981018R03 - NRC Website

text

U. S. NUCLE A3 C E lUL ATORY COMMIS$10N RISC FOAM 354 LICENSEE EVENT REPORT

.h

')

CONTROL BLOCK:

l l

l l

l l

IPLEASE PRtNT OR TYPE ALL C E2UlIED INFO ~ MATl!N) lN l J l S lC lS l 2 l@in. l ol -l 0 l 0l 0] 0] 0 l - ! 0 l O l@364l1l1l1l1l@l l

lg 9

LIC:Nstt CO;t 34

.6CENstNuwetR 2h LICENst Tvrt Jo 67 CAT 68 i

8 CON 7

.I E

l 0l Sl Ol 0l Ol 3l 1l 1hl 0151 i l Sl 8 l 1pl760 l 6l1 l 2l 8 l 1l@

St DOCKETNUWetR 88 88 EVERT DA t 74 REPORT DATE 80 EVENT DESCRIPTION AND PROS ABLI CONSEQUENCES O'o g l The Pressurizer Overpressure Protection System (POPS), Channel 2 was activiated by y

l technicians calibrating valves 2PS1 and 2PS3 when the Reactor Coolant System (RCS) o l pressure increased from 330 psig to 360 psig. At the time of this occurrence the RCSg o 4 g g, temperature was 175*f and the bubble had been established in the Pressurizer.

g 15, 1981.

g l Action Statement 3.4. 9.3c was entered at 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br /> on May n s l

O 7 l I

0 e l s0 sN$t

'Nt

'#$t she'Ciot CouPONENT COct susCOor C0 O 9 lC l3 lh h

h lIlNlSlTlRlUlh y h Q h 7

8 9

to si 12 13 18 is 20 st OVE NTI AL OCCUR R E NCE REPORT R E Vis'ON gga no EvtNT yr ae RtPORT NO.

CODE TYPE NO h,Rg l218l1l b

l0l1l8l y

l0 l 3l L

b W

22 23 24 26 27 N

M 0

31 32 ACWON WN HOURS se6 F

B.

SUPPLi MA UFA TURER ON PL NT AKEN L10@L2J@

Lzj@

L2JO I o l o l o l o l l.2J@

LLl@

L'_J@

Ivl 1312ig 34 35 36 31 40 41 42 43 A4 47 33 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h

" tsonnel error due to the technicians supervisor not notifying the Shift Supervisor l

- i I l prior to the commencement of the work. The supervisor was instrincted in the proper l

i Action Statement 3.4. 9.3c was terminated at l

g l method of implementing work orders.

, 3 l 1431' hours on May 15, 1981.

l I

t A I

SO 7

8 9 OTwtRSTATus h oisCNSN h

'si'A$5 sPO*tR oiscovtRv otsCRiPT ON Q [Gj@ l0lOl0l@l N/A l

W@l Operator Observation l

8#

A TivtTV CO TENT CELE AstD 08 RELE Ast AuouNT OF ACTivtTY LoCAT40N OP RELEAst l

NA l

l NA [z_j @ [zj @ l 1 6 7

e e 10 si A4 46 s0 PERSONNEL txPosurits NUWet R TYPE

DESCRIPTION

I 1 d 01 Ol@LIJ@l Na

  • 1

,t RiO~~il'imu'It s i '

otsCRiptiONh l

NuvatR I

1 d 01 d@l

! i a NA

.0 i,

n Lots O' OR OAWAGE TO FActLITY TYPE Ot sCRIPTION l

hl f1 9

yA 0

T

,0 NRC USE ONLY ilsyt DisCRiPTION L11] JL[81 I

U iiIiiilIIIIi um a a as 8'.i6623 0 5cn

~

NAME OF PREPARER PHONE-