.k. #V8 04
9'o,
UNITED STATES
-
NUCLEAR REGULATORY COMMISSION
~^
8"
n
REGION il
c
k
101 MARIETTA ST., N.W., SulTE 3100
g*****,/
ATLANTA, G EORGIA 30303
FEB 101981
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
Subject: Report Nos. 50-269/80-39, 50-270/80-34, and 50-287/80-30
This refers to the routine safety inspection conducted by N. Economos of this
office on December 15-18, 1980 and January 5-8,
1981, of activities authorized
by NRC Operating License Nos. DPR-38, DPR-49 and DPR-55 for the Oconee facility.
Our preliminary findings were discussed with J. E.
Smith at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. This item and references to pertinent require-
l
ments are listed in the Notice of Violation enclosed herewith as Appendix A.
Elements to be included in your response are delineated in Appendix A.
,
I
We have - examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed report.
l
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
'
report will be placed in the NRC Public Document Room. If this report contains
l
any information that you believe to be proprietary, it is necessary that you
sake a written application within 20 days to this office to withhold such infor-
i
mation from public disclosure. Any such application must include the basis for
claiming ' that the information is proprietary and the proprietary information
l
should be contained in a separate part of the document. If we do not hear from
l
you in this regard within the specified period, the report will be placed in the
Public Document Room.
l
l
810su on]-
. . _ .
-
- .
- _
.
- _
_ - - _ - .
__ . ._
'.
.
FEB 101981
.
Duke Power Company
-2-
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
m
C. E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-269/80-39
j
50-270/80-34 and 50-287/80-30
'
cc w/ encl:
J. E. Smith, Station Manager
8
!
i
!