Text
~
s
<
.
y
.
ga "%'o,
~
UNITED STATES
c
8
~ 7.
NUCLEAR REGULATORY COMMISSION
$
E
REGION ll
b[
101 MARIETTA ST N.W sulTE 3100
g
ATLANTA. GEORGIA 30303
o
- *
JAN 2 91991
In Reply Refer To:
RII:MBS
50-302/80-38
Florida Power Corporation
AITN:
J. A. Hancock, Assistant
Vice President
Nuclear Operations
P. O. Box 14042, Mail Stop C-4
St. Petersburg, FL 33733
Gentlemen:
This refers to the inspection conducted by T. Stetka of this office on October 4 -
November 3,
1980, of activities authorized by NRC Operating License No. DPR-72
for the Crystal River facility, and to the discussion of our findings held with
D. Poole and other members of his staff at the conclusion of the inspectic-
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas , the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed report.
During the inspection it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section .
2.201 of the NRC's ' Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you, and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
81081609051'
.
-
.
.
.
..
.,
.__
, .* _
. . _ . __
_ . - _ _ _ _
_ _ _ . - - _ _ .
__
_ - -
-_. - _ _. _ .
.
.,
.
-
-
.
.
.
i
,
!
'
i
i
l
Florida P3wer Corporation
-2-
g9 g
j
!
<
1
- separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
I
j
Sincerely,
i,
E C.
R. C.
1s, Acting Chief
Reactor Operations and Nuclear
i
Support Branch
!
I
Enclosures:
,
1.
Appendix A, Notice of Violation
l
(Not Exempt)
2.
Inspection Report No. 50-302/80-38
j
(Not- Exempt)
cc w/ encl:
D. C. Poole, Nuclear Plant Manager
[
!
!