ML19347E775
| ML19347E775 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 03/03/1981 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML19347E771 | List: |
| References | |
| NUDOCS 8105130369 | |
| Download: ML19347E775 (2) | |
See also: IR 05000277/1980033
Text
. - . - - . - - _ _ _ _ _ _ _ _ _ - _
_
.
.
.
.
4.f Ng
M
UNITED STATES
,_
( s) fk
I'4
NUCLEAR REGULATORY COMMisslON
"'
h3+(
0
acclON I
$PK
.' j
ut PARK AVENUE
o, hii, [jg
.uNo oF PRUS$1 A. PENNSYLV Am A 19406
g..v
...
Docket Nos. 50-277
50-278
Philadelphia Electric Company
ATTN: Mr. S. L. Dal troff
Vice President
Electric Production
.
2301 Market Street
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject:
Inspection Nos. 80-33, 80-26
This refers to the routine inspection conducted by A. R. Blough and C. J.
Ccwgill at Peach Bc: tom Atomic Pcwer Station, Units 2 and 3, Celta,
Pennsylvania of this office on November 8 - 30, 1980 of activities authorized by
NRC License Nos. OPR-44 and OPR-56 and to the discussions of our findings held
by Mr. Cowgill with Mr. W. T. Ullrich of ycur staff at the conclu., ion of the
inspection.
.
Areas examined during this inspection are described in the Office of Inspection
-
and Enforcement Inspection Aeport which is enclosed with this letter.
Within
these areas, the inspect. .n consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and observations by the inspector.
Our inspector also verified the steps you have taken to correct the item of
nonccmpliance brought to your attention in the enclosure to our letter dated
June 30, 1978. We have no further questions regarding your action at this time.
Based on the results of this inspection, it appears that certain of your activi-
ties were not conducted in fuil compliance with NRC requirements as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
These items of
noncompliance haie been categorized into the levels described in the Federal
Register Notice 45 FR 66754) dated October 7,1980.
In addition to the need
for corrective action regarding these specific items of noncompliance, we are
concerned about the implementation of your management control systems that
permitted them to occue.
Consequently, in your reply, you should describe in
particular, those actions taken or planned to improve the effectiveness of your
management control systems.
Item A of Appendix B in the Notice of Violaticn enclosed with this letter was
identified during previous inspections of your licensed activities on March 1 -
March 31 and September 1 - Septe-ber 30, 1980 and were documented in the enclosure
to our letters dated September 24 and Oc cber 30, 1980. Your letter to this
8105130 3(li
)
Philadelphia Electric Company
2
MAR 0 31981
office dated November 19, 1980 stated the occurrence was the result of personnel
error and that you re-instructed the individuals concerned regarding escort
requi rements .
From our November 7 to November 30 inspection it appears ti:at the
stated corrective actions were not effective since this item has recurred.
Recurrent items of noncompliance are given additional weight in the considera-
tion and selection of appropriate enforcement action.
Therefore, in your
response to this letter, you should give particular attention to those actions
taken or planned to ensure that identified items of noncompliance will be
completely corrected and will not recur.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, documentation of findings of your control
and accounting procedures for safeguarding special nuclear materials and ycur
facility security measures for physical protection are deemed to be commercial
or financial information within the meaning of 10 CFR 9.5(a)(4) and shall be
subject to disclcsure only in accordance with the provisions of 10 CFR 9.12;
therefore, the pertinent section of the enclosed inspection report and Appendix
B, will not be placed in the Public Document Room and will receive limited
distribution.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Since rely,
.
.
nA
Eldon J. Brunner, C .ie
Reactor Operations and Nuclear
Suppor: Branch
Enclosures :
1.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Violation
3.
Combined Office of Inspection and Enforcement Inspection
Report Number 50-277/80-33 and 50-278/80-25
cc:
W. T. Ullrich, Station Superintendent (Without Appendix B and Page 10 of Report)*
Troy B. Conner, Jr. , Esquire (Without Appendix B and Report)*
Eugene J. Bradley, Esquire (Without Appendix B and Report)*
Raymcnd L. Hovis, Esquire ('aithout Appendix B and Report)*
,
Michael J. Scibinico, II, Assistant Attorney General (Without Appendix B and Report)*
- Contains 2.790 Information
-. - -
. .