/03L-0:on 801023,diesel Generator Cooling Water Pump Motor 1/2 Found two-thirds Submerged in Water.Caused by Inadequate Vault Sump Pump Sys.Vault Drained & Cooling Water Pump Motor Replaced
ML19345B487
Person / Time
Site: Quad Cities 
Issue date: 11/18/1980
From: Hannum D
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19345B479 List:
References
LER-80-028-03L-03, LER-80-28-3L-3, NUDOCS 8012010382
Download: ML19345B487 (2)


LER-1980-028, /03L-0:on 801023,diesel Generator Cooling Water Pump Motor 1/2 Found two-thirds Submerged in Water.Caused by Inadequate Vault Sump Pump Sys.Vault Drained & Cooling Water Pump Motor Replaced
Event date:
Report date:
2541980028R03 - NRC Website

text

...

Creu PUMfWI Jtets u. e. swww6 san n auwe.m e un e sweveevesoa wee (7 77)

- LICENSEE EVENT REPORT '

O c ~'a ' oc'" '

' 'O

' ' " ^ = ' ' " ' ~ ' a " " "'a"'"'#'~' " " ' ' ' "'

ffTil I il tl ol Al' Dl 1 l@l 0 l 0 l O l'- l 0 l 0 l 0 l - l 0 l 0 l 0 l@l 4 l l l1l1l1l@l l

l@

7 8 9 LICENSEE CODE 14 15 LICENSE NUMSER 25 26 LICENSE TYPE JG Si LAT 58 CCTT y'o{ l Ll@l 0l 510l 01012 l 5 l 4 l@l 11012 l 3 l 810 l@l 1l1 l1 l818 l0 l@

lOlil 2

8 60

. 61 OOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h l~5T2 ] l The Un i t I equipment attendant inspected IC RHR Service Water vault and found the '/2 l gl Diesel Generator Cooling Water Pump motor to be about two-thirds submerged in watE -

l gog4gl The effects of this occurrence on the overall safety of the reactor were not adverse. l The Unit 2 Diesel Generator was demonstrated operable, and the Station had four off-l gl gl site lines available at all times.

Unit I was also shutdown for a refueling outage.

l lo l 71 I l

I 10181 l 80 7

8 9 E

CODE SUSC E COMPONENT CODE SU8C O'E SU E

g l El El@ Wh l Al h l Ml 0l Tl Ol Rl Xl h W h [J_l h 7

ts 9

10 il 12 -

13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION EVENT YE AR REPORT NO.

CODE TYPE NO.

@ yu'ER ROl218 l0 l. l-l l0 l218 l l/l l0l3l [L,,_]

(-,-]

[0,,j LaPg s

22 23 24 26 27 28 29 30 31 32 T

N AC 0 ON PL NT ME HOURS SB 1 FOR S.

SUP L E MANUF CTURER l C l@W@

lZl@

W@

l0 1 0l 0l 0l l Yl@

lNl@

lNl@

lLl2l0l5l@

33 34 3S 36 37 40 48 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l, l 0 l l The cause of this occurrence is that the existing vault sumo pump system is in-1 1 adequate. The RHR Service Water vault is completely sealed with no floor drains and I

i i i,121 i excessive packing leakage on the RHR Service Water pump Dacking flooded the floor.

I g l The vault was drained and the 1/2 Diesel Generator Cooling Water Pump motor was l

g i replaced.

l 7

8 9 80 SA

% POWER OTH ER STATUS 015 O RY DISCOVERY DESCRIPTION NA l

l A l@l Operator Rounds l

y lH l@ l 0 l 0'l 0 l@l A TiVITV CO TENT' RELEASE AMOONT OF ACTtvtTY LOCATION OF RELEASE y lZ l @O OF RELEASE lZl@l NA l

l NA l

7 8 9 10 11 44 45 80 PERSONNEL EXPCSURES NUMBER TYPE

DESCRIPTION

FiTTI lo l0 l0 l@Lz.J@l N

l

,ERSONNE L iN3UR'iES OESCRiPriONh NuMsER NA -

l [TTi'l l010 l0 l@l 7

8 9 11 12 80 LOSS OF OR OAMAGE TO FACILITY Q TYPE CESCRIPTION N,./

y lZ l@l NA l

80 7

8.9 10 NRC USE ONLY PUatiCITY

SSU E O OESCRerT80N L2.1 o_1 LN_jhl NA l

lllllllllIlll2 80 M0103M-

'1 ave Hannum 309-6%-2241. ext. 177 s,

NANIE OF PREPARER PHONE:

l.

LER NUMBER:

LER/R0 80-28/03L-0 11.

LICENSEE NAME: Commonwealth Edison Company Quad-Cities Nuclear Power Station Ill.

FACILITY NAME: Unit One IV.

DOCKET NUMBER: 050-254 V.

EVENT DESCRIPTION

On October 23,1980, at 9:45 p.m. the Unit One equipment attendant found the IC RHR Service Water vault to have excessive water on the floor. The 1/2 Diesel Cooling Water Pump was found to be about two-thirds submerged.

The 1/2 Diesel Cooling Water Pump was removed from service. Technical Specification 3 9.E.1. specifies necessary actions to be taken in the event the Diesel Generator becomes inoperable. On October 24, at 2135, surveillances for inoperable Diesel Generator were completed.

VI.

PROBABLE CONSEQUENCES OF THE OCCURRENCE:

The effects of this occurrence on the overall safety of the reactor were not adverse. The Unit Two Diesel Generator was demonstrated operable and the Station had four off site lines available at all times. Unit One was also shutdown for a refueling outage.

Vll. CAUSE:

The existing sump in tne IC RHR Service Water vault is inadequate. There are no floor drains available in the vault. The room is totally sealed for flood protection per the Tech Specs.

Excessive packing leakage from the RHR Service Water Pumps flooded the floor and in turn partially sub-merged the 1/2 Diesel Generator Cooling Water Pump.

Vill. CORRECTIVE ACTION:

The 1/2 C:esel Generator Cooling Water Pump that was partially submerged was a temporary pump motor. Inis motor was replaced by the permanent Diesel Generator Cooling Water Pump motor. The IC RHR Service Water vault was drained. Currently, the Station is pursuing sump pump modifications l

for all RHR Service Water vaults.