MONTHYEARML20211K6241999-08-31031 August 1999 Proposed Tech Specs,Changing ISFSI License Conditions 6,7 & 8 & TS 3/4.1 by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20206R0621999-05-13013 May 1999 Proposed Tech Specs,Removing Plant Organization Structure Requirement ML20205S3331999-04-20020 April 1999 Proposed Tech Specs Changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0351999-04-12012 April 1999 Proposed Tech Specs,Relocating Shutdown Margin Requirements from TS to COLR ML20204H3601999-03-19019 March 1999 Proposed Tech Specs Removing Dates of Two NRC SERs & Correcting Dates of One SER Listed in Section 2.C.4, Fire Protection ML20207F2901999-03-0101 March 1999 Proposed Revised Tech Specs Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A2181999-02-0505 February 1999 Proposed Tech Specs,Changing TS 4.12, SG Tube Surveillance to Incorporate Changes to ABB C-E Sleeve Design Assumptions & Installation Techniques ML20196B9721998-11-25025 November 1998 Proposed Tech Specs,Allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155G6321998-11-0303 November 1998 Proposed Tech Specs B.3.1-7 & B.3.1-7a,rev 133A Re Reactor Coolant Sys ML20154S2101998-10-23023 October 1998 Proposed Tech Specs Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20151U3651998-09-0404 September 1998 Proposed Tech Specs TS.3.1-5,TS.4.18-1 & B.4.18-1,clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5061998-08-12012 August 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20236T6041998-07-20020 July 1998 Proposed Tech Specs Incorporating Elevated F* SG Tube Repair Criteria ML20249A7641998-06-11011 June 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20216G0371998-04-13013 April 1998 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20216D0591998-03-0606 March 1998 Proposed Tech Specs Updating Heatup & Cooldown Rate Curves, Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217P0061998-03-0404 March 1998 Proposed Tech Specs Re Status of Relocated Requirements ML20217N9771998-03-0202 March 1998 Proposed Tech Specs 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20217P1431998-03-0202 March 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20202E5691998-02-10010 February 1998 Proposed Tech Specs 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8301998-01-15015 January 1998 Proposed Tech Specs Pages Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1,cycle 19 ML20198P0791998-01-0808 January 1998 Proposed Tech Specs Pages Re Suppl 5 to 951214 LAR on Conformance of Administrative Controls Section 6 to Guidance of STS ML20198B1471997-12-29029 December 1997 Proposed TS marked-up & Revised Pages,Incorporating Changes Associated w/951214 LAR ML20212F0471997-10-28028 October 1997 Proposed Tech Specs Pages Revising TS Section 4.12,allowing Use of voltage-based SG Tube Repair Criteria ML20217F4761997-10-0303 October 1997 Suppl Proposed Tss,Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7581997-10-0101 October 1997 Proposed Tech Specs Re Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5861997-09-26026 September 1997 Proposed Tech Specs Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves Due to Inability to Complete IST Requirements ML20216E4561997-09-0404 September 1997 Proposed Tech Specs,Supporting Conformance to TS Overtime Controls to NRC Guidance Issued 950409 ML20216D1141997-09-0202 September 1997 Proposed Tech Specs,Incorporating Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20217M6191997-08-15015 August 1997 Proposed Tech Specs Incorporating C-E SG Welded Sleeve TR, CEN-629-P,Rev 1 ML20149J0251997-06-30030 June 1997 Tech Spec Change Pages B.3.8-2 & B.3.8-5 to Amend Re Spent Fuel Pool Personnel Access Doors ML20141F5011997-05-15015 May 1997 Proposed Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0871997-05-0707 May 1997 Proposed Tech Specs Re Spent Fuel Pool Special Ventilation Sys ML20137T2081997-04-10010 April 1997 Proposed Tech Specs,Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20135F7481997-03-0707 March 1997 Proposed Tech Specs Re Cooling Water Sys Emergency Intake Design Basis ML20135A9401997-02-21021 February 1997 Proposed Tech Specs,Allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134L8901997-02-12012 February 1997 Proposed Tech Specs 3.3-3 Re Safety Injection Pump Low Temp Operations ML20134J6281997-02-0606 February 1997 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20134E9421997-01-29029 January 1997 Proposed Tech Specs Revising Prairie Island Design Bases Re Cooling Water Emergency Intake ML20135A8251996-11-27027 November 1996 Proposed Tech Specs Incorporating New SG Tube Sleeve Designs & Installation & Exam Techniques ML20135A5091996-11-25025 November 1996 Proposed Tech Specs Implementing Mods Proposed by Suppl to License Amend Request & Revising TS Pp in Final Form to Reflect Changes Proposed by Suppl ML20134H3771996-11-0606 November 1996 Proposed Tech Specs of Appendix a Re Cooling Water Sys ML20134E4551996-10-25025 October 1996 Proposed Tech Specs Changing TS 4.4.A, Containment Leakage Tests, Bases to TS Section B.4.4, Containment Sys Tests & Adding TS.6.5.J, Containment Leakage Rate Testing Program ML20129E2591996-09-24024 September 1996 Proposed Tech Specs,Changing TS 4.12 to Incorporate Revised Acceptance Criteria for SG Tubes W/Degradation in Tubesheet Region ML20117P4311996-09-11011 September 1996 Proposed Tech Specs,Revising Plant TS Governing Cw Sys ML20117B2381996-08-15015 August 1996 Proposed Tech Specs 3.3.B.2 Re Containment Cooling Sys & Bases to Conform to Supporting Analyses ML20115G8121996-07-15015 July 1996 Proposed Tech Specs Re Moveable Incore Detector Thimble Reduction ML20095J7951995-12-14014 December 1995 Proposed Tech Specs for Conformance of Administrative Controls Section 6 to Guidance of STS ML20094S2791995-11-28028 November 1995 Proposed Tech Specs Re Radiological Effluent TS Conformance ML20087F3571995-08-0909 August 1995 Proposed Tech Specs Table TS 3.15-1,Pages 1 & 2 & Bases Page B.3.15-1 Marked Up to Implement License Amend Request 1999-08-31
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211K6241999-08-31031 August 1999 Proposed Tech Specs,Changing ISFSI License Conditions 6,7 & 8 & TS 3/4.1 by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20206R0621999-05-13013 May 1999 Proposed Tech Specs,Removing Plant Organization Structure Requirement ML20205S3331999-04-20020 April 1999 Proposed Tech Specs Changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0351999-04-12012 April 1999 Proposed Tech Specs,Relocating Shutdown Margin Requirements from TS to COLR ML20204H3601999-03-19019 March 1999 Proposed Tech Specs Removing Dates of Two NRC SERs & Correcting Dates of One SER Listed in Section 2.C.4, Fire Protection ML20207F2901999-03-0101 March 1999 Proposed Revised Tech Specs Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A2181999-02-0505 February 1999 Proposed Tech Specs,Changing TS 4.12, SG Tube Surveillance to Incorporate Changes to ABB C-E Sleeve Design Assumptions & Installation Techniques ML20196B9721998-11-25025 November 1998 Proposed Tech Specs,Allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155G6321998-11-0303 November 1998 Proposed Tech Specs B.3.1-7 & B.3.1-7a,rev 133A Re Reactor Coolant Sys ML20154S2101998-10-23023 October 1998 Proposed Tech Specs Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20195F1391998-10-0808 October 1998 Non-proprietary Version of Rev 1 to NSPNAD-97002, Steam Line Break Methodology ML20151U3651998-09-0404 September 1998 Proposed Tech Specs TS.3.1-5,TS.4.18-1 & B.4.18-1,clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5061998-08-12012 August 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20151Z9181998-08-0303 August 1998 Rev 0 to 5AWI 6.1.2, Design Outputs,Review & Verification ML20151Z9011998-08-0303 August 1998 Rev 2 to 5AWI 6.1.0, Design Change General ML20236T6041998-07-20020 July 1998 Proposed Tech Specs Incorporating Elevated F* SG Tube Repair Criteria ML20249A7641998-06-11011 June 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20216G0371998-04-13013 April 1998 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20248M1421998-04-0606 April 1998 Draft NRC Insp Manual Temporary Instruction 2515/XXX Fire Protection Functional Insp (Fpfi) ML20216D0591998-03-0606 March 1998 Proposed Tech Specs Updating Heatup & Cooldown Rate Curves, Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217P0061998-03-0404 March 1998 Proposed Tech Specs Re Status of Relocated Requirements ML20217N9771998-03-0202 March 1998 Proposed Tech Specs 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20217P1431998-03-0202 March 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20202E5691998-02-10010 February 1998 Proposed Tech Specs 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8301998-01-15015 January 1998 Proposed Tech Specs Pages Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1,cycle 19 ML20198P0791998-01-0808 January 1998 Proposed Tech Specs Pages Re Suppl 5 to 951214 LAR on Conformance of Administrative Controls Section 6 to Guidance of STS ML20151Z9561998-01-0505 January 1998 Rev 0 to 5AWI 6.1.7, Design Change Work Orders ML20198B1471997-12-29029 December 1997 Proposed TS marked-up & Revised Pages,Incorporating Changes Associated w/951214 LAR ML20212F0471997-10-28028 October 1997 Proposed Tech Specs Pages Revising TS Section 4.12,allowing Use of voltage-based SG Tube Repair Criteria ML20151Z9441997-10-20020 October 1997 Rev 0 to 5AWI 6.1.6, Design Review & Approval ML20217F4761997-10-0303 October 1997 Suppl Proposed Tss,Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7581997-10-0101 October 1997 Proposed Tech Specs Re Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5861997-09-26026 September 1997 Proposed Tech Specs Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves Due to Inability to Complete IST Requirements ML20216E4561997-09-0404 September 1997 Proposed Tech Specs,Supporting Conformance to TS Overtime Controls to NRC Guidance Issued 950409 ML20216D1141997-09-0202 September 1997 Proposed Tech Specs,Incorporating Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20217M6191997-08-15015 August 1997 Proposed Tech Specs Incorporating C-E SG Welded Sleeve TR, CEN-629-P,Rev 1 ML20149J0251997-06-30030 June 1997 Tech Spec Change Pages B.3.8-2 & B.3.8-5 to Amend Re Spent Fuel Pool Personnel Access Doors ML20141F5011997-05-15015 May 1997 Proposed Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0871997-05-0707 May 1997 Proposed Tech Specs Re Spent Fuel Pool Special Ventilation Sys ML20137T2081997-04-10010 April 1997 Proposed Tech Specs,Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20137W3621997-03-17017 March 1997 Rev 2 to Test Procedure TR-228, Three Hour Fire Test of One and Three Hour Versawrap Raceway Fire Barrier Sys for Conduits & Cable Trays ML20135F7481997-03-0707 March 1997 Proposed Tech Specs Re Cooling Water Sys Emergency Intake Design Basis ML20135A9401997-02-21021 February 1997 Proposed Tech Specs,Allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134L8901997-02-12012 February 1997 Proposed Tech Specs 3.3-3 Re Safety Injection Pump Low Temp Operations ML20134J6281997-02-0606 February 1997 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20134E9421997-01-29029 January 1997 Proposed Tech Specs Revising Prairie Island Design Bases Re Cooling Water Emergency Intake ML20136H0101997-01-29029 January 1997 Rev 12 to Abnormal Procedure AB-3, Earthquakes ML20135A8251996-11-27027 November 1996 Proposed Tech Specs Incorporating New SG Tube Sleeve Designs & Installation & Exam Techniques ML20135A5091996-11-25025 November 1996 Proposed Tech Specs Implementing Mods Proposed by Suppl to License Amend Request & Revising TS Pp in Final Form to Reflect Changes Proposed by Suppl ML20138G8751996-11-0808 November 1996 Rev 2 to TN-40 Cask Unloading Procedure 1999-08-31
[Table view] |
Text
. - _ - _ . _ _ _ . . -. - . - - - .-
,. t
~
O EXHIBIT B License Amendment Request dated November 24, 1980 Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Exh ibit B consists of revised pages for the Prairie Island Nuclear Generating Plant Technical Specifica-l tions, Appendix A, as listed below showing the proposed j ch anges :
TS.3.1-1 TS.3.1-1A TS.3.1-3 TS.3.8-1 TS.3.8-4 Table TS.4.1-2A 1
4 4
801138006 8
TS.3.1-1 REV 3.0 LIMITING CONDITIONS FOR OPERATION 3.1 REACTOR C001. ANT SYSTEM Applicability Applies to the operating status of the reactor coolant system Objective To specify those limiting conditions for operation of the reactor coolant system which must be met to assure safe reactor operation.
Specification A. Operational Components
- 1. Coolant pumps
- a. Both reactor coolant pumps shall be operable whenever average reaccor coolant system temperature is above 350 F.
- b. Both reactor coolant pumps shall be in operation whenever a reactor is critical, except during low power physics tes ts .
- c. At least one reactor coolant pump or one residual heat removal pump shall be in operation at al l t ime s . All pumps may be shutdown provided the reactor is subcritical, no operations are permitted *.at would cause dilution of the reactor coolant boron concentration, and core outlet
'emperature is maintained at least 10 F below saturation temperature,
- d. If a reactor coolant pump becomes inogerable with average reactor coolant temperature above 350 F, restore the pump (s) to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or reduce the average reactor coolant temperature below 350 F.
l
. I TS.3.1-1A REV
- 2. Steam Generators
- a. Both steam generators shall be operable whenever average reactor coolant system temperature is above 350 F.
- b. If a steam generator becomes incperable with average reactor coolant temperature above 350 F, restore the steam generator to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or reduce the average reactor coolant temperature below 350 F. In the event of excessive primary to secondary leakage take the actions required by Specification 3.1.C.6.
- 3. Requirements for Decay Heat Removal Below 350 F
- a. Whenever the average reactor coolant temperature is below 350 F, except during refueling shutdown with the vessel head unbolted, at least two methods for removing decay heat shall be operable. Acceptable methods for removing decay heat are an operable steam generator or a residual heat removal loop including pump and associated heat exchanger,
- b. If two methods of removing decay heat are not operable, the affected reactor shall be placed in a cold shutdown condition and corrective action initiated immediately to res tore the inoperable equipment.
- c. Prior to draining the reactor coolant level below the reactor vessel flange during maintenance, both residual heat removal loops, each consisting of a pump and associated heat exchanger, shall be operable. If a residual heat removal loop becomes inoperable, immediate action shall be taken to restore reactor . coolant system level above the vessel flange.
TS.3.1-3 REV The pressurizer is needed to maintain acceptable system pressure during normal plant operation, including surges that may result following anticipated transients. Each of the pressurizer safety valves is designed to relieve 325 000 lbs per hour of saturated steam at the valve set po int . Below 6
350 F and 450 psig in the reactor coolant system, the residual heat removal system can remove decay heat and thereby coctrol system temperature and pressure. If no residual heat were removed by any of the means available, the amount of steam which could be generated at safety valve relief pressure would be less than half the valves' capacity. One valve therefore provides adequate defense against ever pressurization of the reactor coolant system for reactor coolant temperatures less than 350 F. The combined capacity of both safety valves {s greater than the maximum surge resulting from complete loss of load.
" Steam Generator Tube Surveillance", Technical Specification 4.12, identifies steam generator tube imperfections having a depth >50% of the 0.050-inch tube wall thickness as being unacceptable for power operation. The results of steam generator burst and tube collapse tests submitted to the staff have demonstrated that tubes having a wall thickness greater than 0.025-inch have adequate margins of safety against failure dug to loads imposed by normal plant operation and design basis accidents.'
The Specifications require that at least two methods of removing decay heat are available for each reactor. Above 350 F, both steam generators must be operable to serve this function. Below 350 F, either a steam generator or a residual heat removal loop are capable of removing decay heat and any combination of two loops are specified. If redundant means are not available, the reactor is placed in the cold shutdown condition.
References I FSAR, Section 14.1.9 Testimony by J Knight in the Prairie Island Public Hearicg on Janua'ry 28, 1975.
TS.3.8-1 REV 3.8 REFUELING AND FUEL HANDLING Applicability Applies to operating limitations during fuel-handling and refueling opera-tions.
Objective To ensure chac no incident could occur during fuel handling and refueling operations that would affect public health and safety.
Specification A. During refueling operations the following conditions shall be sat is f ied :
- 1. The equipment hatch and at least one door in each personnel air lock shall be closed. In addition, at least one isolation valve 1 shall be operable or locked closed in each line which penetrates l the containment and provides a direct path from containment atmosphere to the outside.
- 2. Radiation levels in fuel handling areas, the containment and the spent fuel storage pool areas shall be monitored con. inuously.
- 3. The core suberitical neutron flux shall be continuously monitored by at least two neutron monitors, each with continuous visual indication in the control room and one with audible indication in the containment, which are in service whenever core geometry is l being changed. When core geometry is not being changed, at le as t one neutron flux monitor shall be in service.
- 4. During reactor vessel head removal and while loading and unloading fuel from the reactor, the minimum boron concentration of 2000 ppm shall be maintained in the reactor coolant system. The required boron concentration shall be verified by chemical analysis daily.
- 5. During movement of fuel assemblies or control rods out of the reactor vessel, at least 23 feet of water shall be maintained above the reactor vessel flange. The required water level shall be verified prior to moving fuel assemblies or control rods and at least once every day while the cavity is flooded.
- 6. At least one residual heat removal pump shall be operable and running.
The pump may be snutdown for up to one hour to f acilitate movement of fuel or core components.
- 7. If the water level above the top of the reactor vessel flange is less than 20 feet, except when the cavity is being drained for head replacement or control rod latching and unlatching operations, both residual head removal loops shall be operable.
- 8. If Specification 3.8.A.6 or 3.8.A.7 cannot be satisfied, all '
fuel handling operations in containment shall be suspended, the containment integrity requirements of Specification 3.8.A.1 shall ,
be satisfied, and no reduction in reactor coolant boron concentra- i tion shall be made. l l
TS.3.8-6 REV
}
the cask into a carrier, there is a potential drop of 66 feet ( . The cask will not be loaded onto the carrier for shipment prior to a 3-month storage pe riod. At this time, the radioactivity has decayed so that a release of fission products from all fuel assemblies in the cask would result in of f-site doses less than 10 CFR Part 100. It is assumed, for this dose analysis that 12 assemblies rupture af ter storage for 90 days.
Other assumptions are the same as those used in the dropped fuel assembly accident in the SER, Section 15. The resultant doses at the site boundary are 94 Rems to the thyroid and 1 Rem whole body.
The Spent Fuel Pool Special Ventilation System is a safeguards system which maintains a negative pressure in the spent fuel enclosure upon detection of high area radiation. The Spent Fuel Pool Normal Ventilation system is automatically isolated and exhaust air is drawn thro filter modules containing a roughing filter, particulate filter, and , ugha charcoal filter before discharge to th: envi ronment via one of the Shield Building exh aus t stacks. Two completely redundant trains are provided. The exhaust fan and filter of each train are shared with the corresponding train the Containment In-service Purge System. High ef ficiency particulate absolute (HEPA) filters are installed before the charcoal adsorbers to prevent clogging of the iodine absorbers in each SFPSVS filter train. The charcoal adsorbers are installed to reduce the potential release of radioiodine to the environment. The in place test results should indicate a HEPA filter leakage of less than 1% through DOP testing and a charcoal adsorber leakage of less than 1% through halogenated hydrocarbon testing. The laboratory carbon sample test results should indicate a radioactive methyl iodide removal ef ficiency of at least 90% under test conditions which are more severe than accident conditions. The satisfactory completion of these periodic tests combined with the qualification testing conducted on new filters and adsorber provide a hign level of assurance that the emergency air treatment systems will perform a s predicted in the accident analyses.
During movement of irradiated fuel assemblies or coctrol rods, a water level of 23 feet is maintained to provide sufficient shielding.
The specifications require that at least one residual heat removal loop be in operation. This assures that sufficient cooling capacity is available to remove decay heat and maintain the water in the reactor below 140 F and that sufficient coolant circulation is maintained through the core to minimize the effect of a boron dilution incident and prevent boron stratifica-tion. The requirement to have two residual heat removal loops operable when there is less than 20 feet of water above the vessel flange ensures that a single failure of the operating loop will not result in a complete loss of residual heat removal capacility. With the reactor vessel head removed and 20 feet of water above the vessel flange, a large heat sink is available for core cooling. In the event of a failure of the operating RHR loop, adequate time is provided to initiate repairs or emergency procedures to cool the core.
References (1) FSAR Section 9.5.2 (2) FS AR Table 3.2.1-1 (3) FSAR Section 14.2.1 (4) FSAR Section 9.6 (5) FSAR Page 9.5-20a
e ,
TS.4.1-2A REV MINIMUM FREQUENCIES FOR EQUIPMENT TESTS FSAR Section Test Frequency Re ference
- 1. Control Rod Assemblies Rod drop times All rods during each 7 of full length refueling shutdown rods or following each removal of the reac-tor vessel head; affected rods following maintainance on or modification to the control rod drive system which could affect performance of those specific rods la. Reactor Trip Breakers Open trip Monthly -
- 2. Control Rod Assemblies Partial move- Every 2 weeks 7 ment of all rods
- 3. Pressurizer Safety Set point Each refuel!.ng 4 Valves shutdown
- 4. Main Steam Safety Set point Each refueling 10 Valves shutdown
- 5. Reactor Cavity Water level Prior to moving fuel -
assemblies or control rods and at least once every day while the cavity is flooded.
- 6. (Deleted)
- 7. (Deleted)
- 8. (Deleted)
- 9. Primary System Leakage Evaluate Daily 4
- 10. (Deleted)
- 11. Turbine s top valves , Functional Monthly 10 hovernor valves, and intercept valves. (Part of turbine overspeed protection.)
- 12. (Deleted)
NOTES:
_ _