|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20206R0531999-05-13013 May 1999 Application for Amends to Licenses DPR-42 & DPR-60,removing Plant Organization Structure Requirement ML20205S3291999-04-20020 April 1999 Application for Amends to Licenses DPR-42 & DPR-60,changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0261999-04-12012 April 1999 Application for Amends to Licenses DPR-42 & DPR-60, Relocating Shutdown Margin Requirements from TS to COLR ML20204H3491999-03-19019 March 1999 Application for Amends to Licenses DPR-42 & DPR-60,removing Dates of Two NRC SERs & Correcting Date of One SER Listed in Section 2.C.4, Fire Protection ML20207F2771999-03-0101 March 1999 Revised Application for Amends to Licenses DPR-42 & DPR-60, Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A1051999-02-0505 February 1999 Application for Amends to Licenses DPR-42 & DPR-60, Incorporating Changes to ABB-CE Sleeve Design Assumptions & Installation Techniques ML20196B9571998-11-25025 November 1998 Application for Amends to Licenses DPR-42 & DPR-60,allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155D9581998-10-30030 October 1998 Application for Amends to Licenses DPR-42 & DPR-60,to Revise License Condition 7 to Include Extended Implementation Date of 990901 ML20154S2061998-10-23023 October 1998 Application for Amends to Licenses DPR-42 & DPR-60, Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20154F7731998-10-0101 October 1998 Suppl 16 to License Amend Request to Licenses DPR-42 & DPR-60,replacing Paragraph for USAR Page 10.4-7 & Page 10.4-7 Annotated Showing Which Paragraph Replaced ML20151Z8891998-09-15015 September 1998 Suppl 15 to 970129 Application for Amend to Licenses DPR-42 & DPR-60,revising Cooling Water Sys Emergency Intake Design Bases ML20151U3471998-09-0404 September 1998 Application for Amends to Licenses DPR-42 & DPR-60, Clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5001998-08-12012 August 1998 Suppl 8 to 951214 LAR for Licenses DPR-42 & DPR-60,providing Addl Info to Support Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20236T9801998-07-24024 July 1998 Supplemental Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl Info in Support of 980129 Amend Request Re Cooling Water Sys Emergency Intake Design Bases ML20249A7601998-06-11011 June 1998 Suppl 7 to 951214 LAR for Amends to Licenses DPR-42 & DPR-60,showing Tech Specs Pages Annotated to Incorporate Changes Proposed in Suppl ML20248M1911998-05-29029 May 1998 Supplemental Application for Amend to License DPR-42, Providing Updated Flux Mapping Results for Cycle 19 ML20216G0331998-04-13013 April 1998 Application for Amends to Licenses DPR-42 & DPR-60, Supplementing LAR ML20216D0221998-03-0606 March 1998 Application for Amends to Licenses DPR-42 & DPR-60,updating Heatup & Cooldown Rate Curves,Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217N9941998-03-0404 March 1998 Supplemental LAR to Licenses DPR-42 & DPR-60,providing Status of Relocated Tech Specs Requirements ML20217N9671998-03-0202 March 1998 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20217P9811998-03-0202 March 1998 Suppl to LAR to Licenses DPR-42 & DPR-60,supporting License Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20203J9531998-02-27027 February 1998 Application for Amends to Licenses DPR-42 & DPR-60,modifying AMSAC W/Addition of Diverse Scram Feature as Described in Exhibit A.Nrc Approval Is Requested by 980907 ML20202E5571998-02-10010 February 1998 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8241998-01-15015 January 1998 Application for Amends to Licenses DPR-42 & DPR-60, Respectively.Amends Proposes one-time Only Changes Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1 Cycle 19 ML20198P0741998-01-0808 January 1998 Suppl 5 to 951214 LAR to Licenses DPR-42 & DPR-60 Re Proposed Changes to TS Section 6 ML20198B1401997-12-29029 December 1997 Application for Amends to Licenses DPR-42 & DPR-60, Respectively.Amends Provide Changes to TS Pages Associated w/951214 LAR ML20212F9711997-10-28028 October 1997 Supplemental Application for Amend to Licenses DPR-42 & DPR-60 Re Cooling Water Sys Emergency Intake Design Bases ML20217F4711997-10-0303 October 1997 Suppl Application for Amend to Licenses DPR-42 & DPR-60, Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7431997-10-0101 October 1997 Suppl Application for Amends to Licenses DPR-42 & DPR-60, Allowing Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5801997-09-26026 September 1997 Application for Amends to Licenses DPR-42 & DPR-60.Amend Proposes Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves ML20216E4461997-09-0404 September 1997 Application for Amends to Licenses DPR-42 & DPR-90,providing Supplemental Info Which Supports Conformance of TS Overtime to NRC Guidance Issued 950409 ML20217M5961997-08-15015 August 1997 Suppl to LAR Dtd 961127,incorporating C-E SG Welded Tube Sleeve Topical Rept CEN-629-P,Rev 1.Proprietary & non-proprietary TRs CEN-629-P,encl.Proprietary Rept Withheld Per 10CFR2.790.Affidavit,encl ML20148Q9491997-06-30030 June 1997 Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl 9 to LAR Re Amend of CWS Emergency Intake Design Bases ML20141F4851997-05-15015 May 1997 Application for Amends to Licenses DPR-42 & DPR-60, Requesting Proposes Changes to Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0751997-05-0707 May 1997 Application for Amends to Licenses DPR-42 & DPR-60,amending Spent Fuel Pool Special Ventilation Sys ML20138G4161997-04-29029 April 1997 Application for Amends to Licenses DPR-42 & DPR-60, Supplementing 970129 Application Re Rev to Cooling Water Sys Emergency Intake Design Bases ML20137T2031997-04-10010 April 1997 Application for Amends to Licenses DPR-42 & DPR-60, Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20137D9041997-03-20020 March 1997 Application for Amends to Licenses DPR-42 & DPR-60,providing Supplemental Info to Amend Re Cooling Water Sys Emergency Intake Design Bases ML20136H0041997-03-11011 March 1997 Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl Info to Support Amend Re CWS Emergency Intake Design Bases ML20136F5131997-03-10010 March 1997 Application for Amends to Licenses DPR-42 & DPR-60,revising CWS Emergency Intake Design Bases ML20135F7441997-03-0707 March 1997 Suppl 3 to Application for Amends to Licenses DPR-42 & DPR-60 Re Cooling Water Sys Emergency Intake Design Bases ML20135A9371997-02-21021 February 1997 Application for Amends to Licenses DPR-42 & DPR-60,allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134J6211997-02-0606 February 1997 Application for Amends to Licenses DPR-42 & DPR-60,revising Restrictions on Safety Injection Sys Operations When Reactor Coolant Sys Is at Low Temperatures ML20134E9341997-01-29029 January 1997 Application for Amend to Licenses DPR-42 & DPR-60,revising TS Re Cooling Water Sys Emergency Intake Design Bases. Subj Amends Base on Response to Notice of Violations Noted Noted in Insp Repts 50-282/96-15 & 50-306/96-15 ML20135A8191996-11-27027 November 1996 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 4.12, SG Tube Surveillance & TS Section B-4-12 ML20134H3641996-11-0606 November 1996 Application for Amends to Licenses DPR-42 & DPR-60, Requesting Rev to Appendix a Re Cooling Water Sys ML20134E4451996-10-25025 October 1996 Application for Amends to Licenses DPR-42 & DPR-60,changing TS 4.4.A, Containment Leakage Tests, Bases to TS Section B.4.4, Containment Sys Tests & Adding TS.6.5.J, Containment Leakage Rate Testing Program ML20129E2451996-09-24024 September 1996 Application for Amends to Licenses DPR-42 & DPR-60, Respectively,Changing TS 4.12, SG Tube Surveillance, to Incorporate Revised Acceptance Criteria for SG Tubes W/ Degradation in Tubesheet Region ML20117P4291996-09-11011 September 1996 Application for Amends to Licenses DPR-42 & DPR-60,revising Plant TS Governing Cw Sys ML20117B2341996-08-15015 August 1996 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 3.3.B.2 Re Containment Cooling Sys & Bases to Conform to Supporting Analyses 1999-05-13
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20211K6101999-08-31031 August 1999 Application for Amend to License SNM-2506,proposing Change to License Conditions 6,7 & 8 & TSs to App a of License by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20206R0531999-05-13013 May 1999 Application for Amends to Licenses DPR-42 & DPR-60,removing Plant Organization Structure Requirement ML20205S3291999-04-20020 April 1999 Application for Amends to Licenses DPR-42 & DPR-60,changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0261999-04-12012 April 1999 Application for Amends to Licenses DPR-42 & DPR-60, Relocating Shutdown Margin Requirements from TS to COLR ML20204H3491999-03-19019 March 1999 Application for Amends to Licenses DPR-42 & DPR-60,removing Dates of Two NRC SERs & Correcting Date of One SER Listed in Section 2.C.4, Fire Protection ML20207F2771999-03-0101 March 1999 Revised Application for Amends to Licenses DPR-42 & DPR-60, Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A1051999-02-0505 February 1999 Application for Amends to Licenses DPR-42 & DPR-60, Incorporating Changes to ABB-CE Sleeve Design Assumptions & Installation Techniques ML20196B9571998-11-25025 November 1998 Application for Amends to Licenses DPR-42 & DPR-60,allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155D9581998-10-30030 October 1998 Application for Amends to Licenses DPR-42 & DPR-60,to Revise License Condition 7 to Include Extended Implementation Date of 990901 ML20154S2061998-10-23023 October 1998 Application for Amends to Licenses DPR-42 & DPR-60, Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20154F7731998-10-0101 October 1998 Suppl 16 to License Amend Request to Licenses DPR-42 & DPR-60,replacing Paragraph for USAR Page 10.4-7 & Page 10.4-7 Annotated Showing Which Paragraph Replaced ML20151Z8891998-09-15015 September 1998 Suppl 15 to 970129 Application for Amend to Licenses DPR-42 & DPR-60,revising Cooling Water Sys Emergency Intake Design Bases ML20151U3471998-09-0404 September 1998 Application for Amends to Licenses DPR-42 & DPR-60, Clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5001998-08-12012 August 1998 Suppl 8 to 951214 LAR for Licenses DPR-42 & DPR-60,providing Addl Info to Support Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20236T9801998-07-24024 July 1998 Supplemental Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl Info in Support of 980129 Amend Request Re Cooling Water Sys Emergency Intake Design Bases ML20249A7601998-06-11011 June 1998 Suppl 7 to 951214 LAR for Amends to Licenses DPR-42 & DPR-60,showing Tech Specs Pages Annotated to Incorporate Changes Proposed in Suppl ML20248M1911998-05-29029 May 1998 Supplemental Application for Amend to License DPR-42, Providing Updated Flux Mapping Results for Cycle 19 ML20216G0331998-04-13013 April 1998 Application for Amends to Licenses DPR-42 & DPR-60, Supplementing LAR ML20216D0221998-03-0606 March 1998 Application for Amends to Licenses DPR-42 & DPR-60,updating Heatup & Cooldown Rate Curves,Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217N9941998-03-0404 March 1998 Supplemental LAR to Licenses DPR-42 & DPR-60,providing Status of Relocated Tech Specs Requirements ML20217P9811998-03-0202 March 1998 Suppl to LAR to Licenses DPR-42 & DPR-60,supporting License Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20217N9671998-03-0202 March 1998 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20203J9531998-02-27027 February 1998 Application for Amends to Licenses DPR-42 & DPR-60,modifying AMSAC W/Addition of Diverse Scram Feature as Described in Exhibit A.Nrc Approval Is Requested by 980907 ML20202E5571998-02-10010 February 1998 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8241998-01-15015 January 1998 Application for Amends to Licenses DPR-42 & DPR-60, Respectively.Amends Proposes one-time Only Changes Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1 Cycle 19 ML20198P0741998-01-0808 January 1998 Suppl 5 to 951214 LAR to Licenses DPR-42 & DPR-60 Re Proposed Changes to TS Section 6 ML20198B1401997-12-29029 December 1997 Application for Amends to Licenses DPR-42 & DPR-60, Respectively.Amends Provide Changes to TS Pages Associated w/951214 LAR ML20212F9711997-10-28028 October 1997 Supplemental Application for Amend to Licenses DPR-42 & DPR-60 Re Cooling Water Sys Emergency Intake Design Bases ML20217F4711997-10-0303 October 1997 Suppl Application for Amend to Licenses DPR-42 & DPR-60, Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7431997-10-0101 October 1997 Suppl Application for Amends to Licenses DPR-42 & DPR-60, Allowing Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5801997-09-26026 September 1997 Application for Amends to Licenses DPR-42 & DPR-60.Amend Proposes Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves ML20216E4461997-09-0404 September 1997 Application for Amends to Licenses DPR-42 & DPR-90,providing Supplemental Info Which Supports Conformance of TS Overtime to NRC Guidance Issued 950409 ML20217M5961997-08-15015 August 1997 Suppl to LAR Dtd 961127,incorporating C-E SG Welded Tube Sleeve Topical Rept CEN-629-P,Rev 1.Proprietary & non-proprietary TRs CEN-629-P,encl.Proprietary Rept Withheld Per 10CFR2.790.Affidavit,encl ML20148Q9491997-06-30030 June 1997 Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl 9 to LAR Re Amend of CWS Emergency Intake Design Bases ML20141F4851997-05-15015 May 1997 Application for Amends to Licenses DPR-42 & DPR-60, Requesting Proposes Changes to Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0751997-05-0707 May 1997 Application for Amends to Licenses DPR-42 & DPR-60,amending Spent Fuel Pool Special Ventilation Sys ML20138G4161997-04-29029 April 1997 Application for Amends to Licenses DPR-42 & DPR-60, Supplementing 970129 Application Re Rev to Cooling Water Sys Emergency Intake Design Bases ML20137T2031997-04-10010 April 1997 Application for Amends to Licenses DPR-42 & DPR-60, Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20137D9041997-03-20020 March 1997 Application for Amends to Licenses DPR-42 & DPR-60,providing Supplemental Info to Amend Re Cooling Water Sys Emergency Intake Design Bases ML20136H0041997-03-11011 March 1997 Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl Info to Support Amend Re CWS Emergency Intake Design Bases ML20136F5131997-03-10010 March 1997 Application for Amends to Licenses DPR-42 & DPR-60,revising CWS Emergency Intake Design Bases ML20135F7441997-03-0707 March 1997 Suppl 3 to Application for Amends to Licenses DPR-42 & DPR-60 Re Cooling Water Sys Emergency Intake Design Bases ML20135A9371997-02-21021 February 1997 Application for Amends to Licenses DPR-42 & DPR-60,allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134J6211997-02-0606 February 1997 Application for Amends to Licenses DPR-42 & DPR-60,revising Restrictions on Safety Injection Sys Operations When Reactor Coolant Sys Is at Low Temperatures ML20134E9341997-01-29029 January 1997 Application for Amend to Licenses DPR-42 & DPR-60,revising TS Re Cooling Water Sys Emergency Intake Design Bases. Subj Amends Base on Response to Notice of Violations Noted Noted in Insp Repts 50-282/96-15 & 50-306/96-15 ML20135A8191996-11-27027 November 1996 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 4.12, SG Tube Surveillance & TS Section B-4-12 ML20134H3641996-11-0606 November 1996 Application for Amends to Licenses DPR-42 & DPR-60, Requesting Rev to Appendix a Re Cooling Water Sys ML20134E4451996-10-25025 October 1996 Application for Amends to Licenses DPR-42 & DPR-60,changing TS 4.4.A, Containment Leakage Tests, Bases to TS Section B.4.4, Containment Sys Tests & Adding TS.6.5.J, Containment Leakage Rate Testing Program ML20129E2451996-09-24024 September 1996 Application for Amends to Licenses DPR-42 & DPR-60, Respectively,Changing TS 4.12, SG Tube Surveillance, to Incorporate Revised Acceptance Criteria for SG Tubes W/ Degradation in Tubesheet Region ML20117P4291996-09-11011 September 1996 Application for Amends to Licenses DPR-42 & DPR-60,revising Plant TS Governing Cw Sys 1999-08-31
[Table view] |
Text
- - ._
- , . . .--. . ~ . . . = - - .- __ .__.- --. -- -
l O
UNITED STATES NUCLEA~ AEGULATORY COMMISSION NORTilERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No. 50-282 i
50-306 i
i f 1
i REQUEST FOR AMENDMENT TO
- OPERATING LICENSE NO. DPR-42 & DPR-60 j _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1 (License Amendment Request Dated November 24, 1920) 4 i
Northern States Power Company, a Minnesota corporation, requests authorization for changes to the Technical Specifications as shown on the attachments labeled Exhibit A and Exhibit B. Exhibit A describes i the proposed changes along with reasons for the change. Exhibit B is a set of Technical Specification pages incorporating the proposed changes.
i 'Ihis request contains no restricted or other defense information. ;
I NORTilERN STATES POWER COMPANY t
I By _
L 0 Maye f Manager of Nuclear Support Services '
On this M d day of /pf @py at/ /f[8, before me a notary public in j and for said County, personally' appeared L 0 Mayer, Manager of Nuclear Support Services, and being first duly sworn acknowledged that he is authorized I to execute this document on behalf of Northern States Power Company, that he i
- knows the contents thereof and that to the best of his knowledge, information and belief, the statements made in it are true and that it is not interposed
. for delay.
t 1 dis w l Md
,< JEANNE M. P ' ,KER osotaw evse, amemsota
' : g.t j ',g HENNEPIN COUNTY y c,. 1., r. .. . .
.a . ..- .-
l-.,_ _ _.m._ _ _ - . . ~
8011280066
EXHIBIT A Prairie Island Nuclear Generating Plant License .tmendment Request dated November 24, 1980 Proposed Changes to the Technical Specifications Appendix A of Operating Licenses DPR-42 and DPR-60 Pursuant to 10 CFR 50.59, the holders of Operating Licenses DPR-42 and DPR-60 hereby propose the following changes to Appendix A, Technical Specifica t ions :
- 1. Decay Heat Removal Capability PROPOSED CHANGE Revise the Technical Specifications to require at least two means of decay heat removal to be operable at all times.
1 Above 350 degrees F, revise the Limiting Conditions for Operation to require both reactor coolant loops to be operable at all times.
Below 350 degrees F, require at least two redundant means of decay heat removal to be operable. Either an RHR loop or a reactor coolant loop is an acceptable means of decay heat removal. With the reactor coolant system drained, require both RHR loops to be operable.
Re f e r t o Exh ibit B, pages TS.3.1-1, TS.3.1-1A, and TS.3.1-3.
REASON FOR CHANGE These changes are being submitted at the request of the NRC Staf f. The need for these additional requirements became evident following the Davis-Besse Unit No. I event earlier this year in which decay heat removal capability was not assured.
The proposed changes follow the recommendations contained in a letter dated June 11, 1980, from D G Eisenhut, Director, Division of Licensing, USNRC, with one exception. Credit is taken for natural circulation decay heat removal capability in our submittal.
SAFETY EVALUATION These changes add additional requirements to the Technical Specifications related to decay heat removal systems. The proposed changes are based on guidance provided by the NRC Staff. Existing requirements of the Technical Specifications are not af fected by these changes.
EXHIBIT A
- 2. Water Level Over Top of Irradiated Fuel Assemblies PROPOSED CHANGE Revise the Technical Specifications to require at least 23 feet of water over the reactor vessel flange at all times during movement of fuel assemblies or control rods. Add a surveillance requirement for measur-ing this water level on a daily basis.
Revise the Technical Specifications to require both RHR loops to be operable during refueling operations if there is less than 20 feet of water above the top of the reactor vessel flange.
Refer to Exhibit B, pages TS.3.8-1, TS.3.8-4, and Table TS.4.1-2A.
REASON FOR CRANGE These changes add Limiting Conditions for Operation and Surveillance Requirements related to water level in the reactor cavity during refueling operations. They provide additional assurance that there is sufficient water in the cavity to prevent exposure of irradiated fuel and control rods during movement of these components. In addition, in the event water level f alls below normal, they provide additional assurance that redundant means for removing decay heat are available.
The proposed changes follow the recommendations contained in letters dated June 11, 1980 from D G Eisenhut, Director, Division of Licensing, USNRC, and August 15, 1980 from T M Novak, Assistant Director for Operating Reactors, Division of Licensing, USNRC, with one exception.
A cavity water level of 20 feet has been proposed as the mini ;um required to provide decay heat removal capability. A 23-foot requirement at our facility would be impractical to impose except during actual I
fuel movements. A level of 20 feet provides a sufficiently large water y voluce for decay heat removal purposes.
SAFETY EVALUATION These changes add additional requirements to the Technical Specifications related to preventing exposure of irradiated fuel assemblies and control rods during handling and assurance of redundant means for removing decay heat during refueling operations. The proposed changes are based on guidance provided by the NRC Staff. Existing requirements of the Technical Specifications are not af fected by these changes.
Note: as shown in Exhibit B, Page TS.3.8-1, reference to the minimum boron concentration for cycle 1 in Specification 3.8. A.5 can be conveniently deleted in conjunction with these changes. In addition, minor grammatical errors in Specifications 3.8.A.1 ;
and 3.8.A.3 are corrected. )
1 1