if p 3 Commonwealth Edison e
l.-
q gt3 one First Natif
- P:an, Chicap, mim -
[
-(
g.*w/// Address RepsEx Post Ottice Box 767 '
Chicago, III:nois 60690 u
November 4, 1975
- Mr. D.L.'Ziemann, Chief Operating Reactors - Branch 2
- Division of Reactor Licensing U.S. liuclear Regulatory Commission-Washington ~D.C.
20555
Subject:
Dresden Station Unit 1-High Pressure Coolant Injection (HFCI) System NRC Docket No. 50-10
Dear Mr..Ziemann:
This letter is in responso to ihc letter from IIr. Goller, dated August-5, 1974, requesting a progresc report every three months starting Hoveraber 5,.1974.
This is report lio. 5.
' The. HPCI System Design Report was submitted by fir. I.ce's letter to 1ir. Rusche dated October 16, 1975.
This report covered all of the Emergency-Core Cooling Systems (3003) in the proposed configuration with HPCI includin6 modifications to remove the vulnerability to failure of a' single onsite power source and was written in the foricat of'the_HRC Standard' Review Plan (Chapters 6 and 8).
A reduced _ coolant flow. supplement to the Dresden Unit l' 100FR50 Appendix K ECCS analysis "with HiCI" was prepared 'by Genera 1T Electric and we ' expect to submit it to the lidC before the end of Novenber 1975.
The lastJquarterly procress report indicated that the
' core spray systen performance would be inadequate with suction taken froir. the_new HFCI tank as was proposed-in the conceptual Lourf rchitect-Engineer has completed a study of several-A HPCI plan.
possible' solutions, but a.decisien has not yet been reached.
. The status of the :various ceraponents of the HFCI system
.is_given-in Table No. 1 (attached).
Very t ly yours, O.(p.SQf~
/
G.A. Abre11
-Nuclear lLieensing Administrator
- Boiling dater Reactors
-Attachment 3 8l01ooaog3o
1 o-e
! Table'No. 1-Dresden Unit 1 H10I Eouitment~ Status Item-Status Pumps Purchase requisition signed
. Diesel-generators New specification. written and reviewed
~
~
Purchase awarded f:T
,011. storage tanks.,.
Purchase awarded Large~ valves
~
Small valves-Purchase awarded 3t,ructures,
Specification written and reviewed 4
Water storage. tank Specification written and' reviewed' Pipin6_and installation New specification being written
~
Diesel cervice water pumps-Specification written NO Batteries O
4;m Battery charges
' Venti 11ation fans Specification written and reviewed'-
g M,
. Cable. pans i.otor control centers Specification written V4 Transforners y
'h Specification-written and reviewe6 Switch gear e
-m. -
--