Submits Progress Rept 8.Util Best Estimate for Operational HPCI Sys Addition Will Be 780331
ML19344B380
Person / Time
Site: Dresden 
Issue date: 08/04/1976
From: Abrell G
COMMONWEALTH EDISON CO.
To: Ziemann D
Office of Nuclear Reactor Regulation
Shared Package
ML19344B371 List:
References
NUDOCS 8010080736
Download: ML19344B380 (4)


Text

.

,1.._.

f

-m' Commonwealth Edisor, L

l

.) Ona First Nabonal Plat 2, Chicago. Uhnms

-((p/

~ l ' Tddriess'RepIy to: Post'Offke Box 767 (l

Chicago. filinois 60G90 V

August 4, 1976 Mr.~ Dennis L. Ziemann, Chief

'U Operating Reactors Branch 2 66N E

'J#

Division of Operating Reactors U.S. Nuclear' Regulatory Commission Washington, D.C.

20555

Subject:

3readen Station Unit 1

.High Pressure Coolant Injection (HPCI)

System, NRC. Docket No. 50-10

Dear Mr.'Ziemann:

This letter is in response to the letter from Mr. Goller, dated August 5, 1974, requesting a' progress report every three months' starting November 5,1974.

This is report No. 8.

Although we are. trying to improve the schedule, our best estimate is that the HPCI system addition will'be operational by about the end of March, 1978. This schedule is about the same as that indicated in report No. 7.

_ Several actions were taken to expedite the schedule; however, eeveral situations-developed that delayed the project somewhat. Tne resolution of tech-

^

l nical and quality assurance questions took longer to resolve than anticipated which l

has delayed the award of the diesel generators.

The longer than anticipated reso-lution of quality assurance program deficiencies delayed the award of the structural work contract. The combined requirements for sphere penetrations for all the Dresden i

1 backfit jobs (HPCI,- Decon, -RPS and containment equipment modifications) neces-l sitates that additional penetrations ~be installed. Although the structural contract l

was awarded, many of the items are on hold awaiting necessary details following the award and-subsequent vendor drawing submittals for the remainder of the equipment.

The need to route many of the cables around the north side of-the plant, as dis-cussed in report No. 7, along with the need for new penetrations, has necessitated changes to the originally planned underground duct run resulting in a hold on the construction of duct and cable runs until the new designs are completed.

The HFCI L

building is very crowded because of equipment design changes and actual vendor pro-l.

posed equipment different than anticipated. We have so far avoided increasing the size of the building in order to avoid the three month schedule delay that would result.-

L The status of the various. components of the.HPCI system is given in l

Table No.1 (attached).

. J'y. letter to you dated July 26, 1976 transmitted our answers to many of the questions regarding the Dresden 1 omergency core ecoling systems transmitted by your April 26,.1976 letter to l'r. Bolger. We currently anticipate that we veill 8%oso 7M

g.

....e

r_

s

-f

- t.

. ?> ;

'g

'have1 answers for most 'of'.the; remining questions ready to submit to'you by the week

?.of Augustf23,il976-and the last of the answers will be ready by early September.--

.Very truly yours,-

[

G.A'. Abrell Nuclear Licensing Administrator-Boiling Water. Reactors RCL/tlf-Attachment

~(One :(1). signed original and 39 copies are provided for your use.)

L L

l-1 i

. l t

.l r

.1

)

4 e

s

~

(

t

/

w-

> a

, +

e e

. Table Noo 11 - Dresden Unit l'HPCI' Equipment Status q

Item.

Status 1

Structural-Work Contract awarded..

'Non4 Destructive Testing Specification written.and reviewed. Award imminent.

1,..

' Piping and Installation

New specification written and reviewed.'

Large Valves -

Purchase awarded. l Spe'c. addendum for additional valves written.

i mall / Valves

. Purchase awarded and manufacture completed S

' Oil. Storage 'Trudc.

Purchase. awarded, spec.' addendum written.

1 Pumps' Purchase awarded.

Ebtors Specification written.

. Diesel Generators Bids received and evaluated, purchase requisition written.

Water Storage Tank Bids received and. under. evaluation.

Main Control Room Panels Out for bids.'

' Diesel Gen. Service Water Pumps Out for bids.

011 Day Tanks' Purchase awarded, spec. addendum written.

!btor Control Centers ~

Bids received and under evaluation.

[~T 4160 V Switchgear Bids received and under evaluation.

460 V Transformers

- Bids received and under evaluation.

DC Distribution Panels Out for bids.

Ba tteries Bids received and under evaluation.

Cables (600V)

-Specification vpritten and reviewed.

Cables ( 5KV)

Specification written and reviewed.

B

-~/

. q ';

H s

.h J.

~ '

' j.

0 d

I' iltem >

Status

.t iBattery._ Charger Bids received.and.under evaluation.

7,

' Cibles (Instrumentation)-

Specification written and reviewed.

s

^

JCible' Trays Specification _being written.

+

'f HVAC' riork:

-Specification. written and reviewed.

Event Fans'

' Bids received and under.cvaluation.

^

ij}f