05000348/LER-1981-005-01, /01T-0:on 810324,determined That Time Stipulated in FSAR Section 9.2.1.3 for Operator Action in Accident Involving Svc Water Pond Dam Break & Limiting Active Failure Is Not Accurate.Caused by Design Error

From kanterella
(Redirected from ML19343D165)
Jump to navigation Jump to search
/01T-0:on 810324,determined That Time Stipulated in FSAR Section 9.2.1.3 for Operator Action in Accident Involving Svc Water Pond Dam Break & Limiting Active Failure Is Not Accurate.Caused by Design Error
ML19343D165
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/06/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19343D164 List:
References
LER-81-005-01T, LER-81-5-1T, NUDOCS 8104090652
Download: ML19343D165 (2)


LER-1981-005, /01T-0:on 810324,determined That Time Stipulated in FSAR Section 9.2.1.3 for Operator Action in Accident Involving Svc Water Pond Dam Break & Limiting Active Failure Is Not Accurate.Caused by Design Error
Event date:
Report date:
3481981005R01 - NRC Website

text

-..

cot.TR O'. CloC K: l l

l l

l 1

ih (PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATIONI 1

6 i A l L l J l M l F l 1 l@l 0 l0 l-l 0 1010 l0 l0 l - l 010 l@l 4 l 1 l 1 l 1 l 1 l@l l

1@

o i 7

8 9 LICENSEE CODE 14 15 LICENSE NUMBER 25 28 LICENSE TvPE JG 57 CATSa con'T 2,',$ 1 L l@l 015 lb I010131418 l@l Ol 3 l 214] 811 l@l 01410161811 l@

f o i 7

8 60 61 COCKET NUMBER 68 69 EVENT OATg 74 73 PEPORT OATE 80 EVENT DESCRIPTION ANo PROBABLE CONSEQUENCES h E I Based on a 3-24-81 evaluation of river water system flow tests, it was determined that i F5Til i under a certain postulated accident condition involving a service water pond dam break.J h l coupled with the single most limiting active failure (i.e. loss of one train of river i

I water), the time stipulated in FSAR section 9.2.1.3 for operator action is not availablel O s F6Td l i FSAR section 9.2.1.3 states that there will be at least 30 minutes following a loss of l l pond dam and loss of one train of river water for the operator to take action to balancel O 7 g i service water requirements with river water supply. The test results evaluation..... l

' S'E YOTE SusCSEE COMPONENT CODE SUSC dE S

OE CO l WI El @ [Bj @ l Al @ l Zl Zl Z lZ lZ lZ l @ LZ_j @ d_j @

O 9 7

8 9

to 13 12 13 18 I9 23 SEQUENTIAL OCCURRENCE REPORT l'IEVISTON LER EVENT YEAR REPORT NO.

CODE TYPE NO.

@ ayg/RO 18 11 l 1.--J l 0101 si Ld In l1 1 ITI L_I LaJ 28 22 23 24 26 27 28 29 33 al 32 K

AC 0 ONP NT -

M HOURS 22 58 IT FO S.

5 PPL MAP P RER lFIglFI@

[Z_J@

l Zl@

l01010l l

W@

[tLj@

l Zl@

l -Z l 91919 l@

C 33 34 35 36 31 40 41 42 43 44 47 cAuSE DESCRIPTION AND CORRECTIVE ACTIONS h l1 :O l l This occurrence was caused by a design error.

In order to increase the tire available I g l for operator action, a design change to provide an additional source of water 'to the I

m I service water pumps under the postulated accident condition is being imolemented. Thisl g g design change will add a service water supply line with necessary valves, control logic,1 ii g, ; etc. from the service water / pond recirculation line to the service water wet' pit.

I 7

9 Continued so A$

% POWER OTHER STATUS Ol$ 0 RY OiSCOVERY OESCRIPTION liisi LnJ@ l ni ni ol@l "A

I Lc_l @loerror-nra nr ~ c m ~

l

'a A!TivlTY CarENT RELEASED OP RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE nA I

I nA I

li is l LIJ @ LI_l@l 7

8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUYSER TYPE

DESCRIPTION

l i l 71 101 0 l O l@[Z_j@l NA l

PERSONN E L INJURIES NuvaER

DESCRIPTION

l1 la l l Ol 0 l 0 l@l NA

~ _j 7

8 9 11 12 80 LOSS 08 OR O AMAC TO PACILITY li l 91 l Z l@l flA l

7 8 9 to 80 PUSL' CITY NRC USE oNLY QLOJ j_tjj@OESCRIPTION t*.StJ E D l

flA I

l_ l l I I I I I I I I I l 5 68 63 80 ;ll 7

s 9 to NAME oF PREPARER PHONE:

810 4 0 9 0bSJfL ~

... i LER NO. 81-005/0lT-0 EVENTDESCRIPTIONANDPROBABLECONSEQUENCES(Continued)

~

indicates that the operator would have approximately 20 minutes available to take action to balance service water flow with river water flow if both units were-operating and.the postulated accident condition occurred.

This report is being submitted in accordance with Unit 1 Technical Specifi-cation 6.9.1.8.1 and Unit 2 Technical Specification 6.9.1.12.1.

The health and safety. of the public have not been affected by this occurrence.

4 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS (Continued)

The design change will be implemented by mid-May, 1981.