LER 81-005/01T-0:on 810324,determined That Time Stipulated in FSAR Section 9.2.1.3 for Operator Action in Accident Involving Svc Water Pond Dam Break & Limiting Active Failure Is Not Accurate.Caused by Design Error
ML19343D165
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/06/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19343D164 List:
References
LER-81-005-01T, LER-81-5-1T, NUDOCS 8104090652
Download: ML19343D165 (2)


Text

-.. . _. _... .._. ...

cot.TR O'. CloC K: l 1

l l l l 1 ih 6

(PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATIONI 7

o i 8 9 iAlL l J l M l F l141 l@l LICENSEE CODE 15 0 l0 l- l 0 LICENSE1010NUMBER l0 l0 l - l 010 l@l 25 4 l 1LICENSE 28 l 1 l 1TvPE l 1JGl@l57 CATSa l 1@

con'T o i 2,',$

f 1 L l@l 015 lb I010131418 l@l Ol 3 l 214] 811 l@l 01410161811 73 PEPORT OATE 80 l@

7 8 60 61 COCKET NUMBER 68 69 EVENT OATg 74 EVENT DESCRIPTION ANo PROBABLE CONSEQUENCES h E I Based on a 3-24-81 evaluation of river water system flow tests, it was determined that i F5Til i under a certain postulated accident condition involving a service water pond dam break.J h l coupled with the single most limiting active failure (i.e. loss of one train of river i O s I water), the time stipulated in FSAR section 9.2.1.3 for operator action is not availablel F6Td l i FSAR section 9.2.1.3 states that there will be at least 30 minutes following a loss of l O 7 l pond dam and loss of one train of river water for the operator to take action to balancel g i service water requirements with river water supply. The test results evaluation ..... l

' CO S'E YOTE SusCSEE COMPONENT CODE SUSC dE S OE O 9 l WI El @ [Bj @ l Al @ l Zl Zl Z lZ lZ lZ l @ LZ_j @ d_j 23 7 8 9 to 13 12 13 18 I9 SEQUENTIAL OCCURRENCE REPORT l'IEVISTON LER EVENT YEAR REPORT NO. CODE TYPE NO.

@ ayg/RO 18 11 l 28 22 1.--J 23 l 0101 si 24 26 Ld 27 In l1 1 28 29 ITI 33 L_I al LaJ 32 K AC 0 ONP NT - M HOURS 22 58 IT FO S. 5 PPL MAP P RER C

lFIglFI@ [Z_J@ l36Zl@ l01010l 31 l W@

41

[tLj@ l43 Zl@ l44-Z l 9191947l@

33 34 35 40 42 cAuSE DESCRIPTION AND CORRECTIVE ACTIONS h l1 :O l l This occurrence was caused by a design error. In order to increase the tire available I g l for operator action, a design change to provide an additional source of water 'to the I m I service water pumps under the postulated accident condition is being imolemented. Thisl g g design change will add a service water supply line with necessary valves, control logic,1 ii g , ; etc. from the service water / pond recirculation line to the service water wet' pit. I

7 9 Continued so A$  % POWER OTHER STATUS Ol$ 0 RY OiSCOVERY OESCRIPTION liisi LnJ@ l ni ni ol@l" "A

I Lc_l @loerror-nra nr ~ c m ~ 'a l

A!TivlTY CarENT RELEASED OP RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE nA I I nA I li is 8l LIJ 7 9

@ LI_l@l 10 11 44 45 80 PERSONNEL EXPOSURES NUYSER TYPE DESCRIPTION l i l 71 101 0 l O l@[Z_j@l NA l PERSONN E L INJURIES NuvaER DESCRIPTION NA ~ _j l1 la8l 9l Ol 0 l 0 l@l12 7 11 80 LOSS 08 OR O AMAC TO PACILITY flA l li l 918 9 l Z l@lto 80 7

PUSL' CITY NRC USE oNLY

  • t*.StJ E D QLOJ j_tjj@OESCRIPTION l flA I 68 63 l_ l l I I I I I I I I I l 5 80 ;ll 7 s 9 to NAME oF PREPARER
  • * "* PHONE:

810 4 0 9 0bSJfL ~

...i LER NO. 81-005/0lT-0 EVENTDESCRIPTIONANDPROBABLECONSEQUENCES(Continued)

~

indicates that the operator would have approximately 20 minutes available to take action to balance service water flow with river water flow if both units were-operating and.the postulated accident condition occurred.

This report is being submitted in accordance with Unit 1 Technical Specifi-cation 6.9.1.8.1 and Unit 2 Technical Specification 6.9.1.12.1.

The health and safety. of the public have not been affected by this occurrence.

4 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS (Continued)

The design change will be implemented by mid-May, 1981.