ML19343D164

From kanterella
Jump to navigation Jump to search
Forwards LER 81-005/01T-0
Date released: 12/23/2019 Download: ML19343D164


LER 81-005/01T-0:on 810324,determined That Time Stipulated in FSAR Section 9.2.1.3 for Operator Action in Accident Involving Svc Water Pond Dam Break & Limiting Active Failure Is Not Accurate.Caused by Design Error
ML19343D165
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/06/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19343D165 (2)
Forwards LER 81-005/01T-0
ML19343D163
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/06/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19343D163 (1)