Forwards IE Insp Repts 50-321/80-46 & 50-366/80-46 on 801203-05 & Notice of Violation
ML19343C734
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 01/29/1981
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19343C727 List:
References
NUDOCS 8103250145
Download: ML19343C734 (2)


See also: IR 05000321/1980046

Text

. _ . +

W

f LE:

'o

UNITED STATES

f,~g

NUCLEAR REGULATORY COMMICSION

-

r

REGION ll

(~

k

f

101 MARIETTA ST

N.W., sulTE 3100

o[

ATLANTA, GEORGIA 3o303

JAN 2 91gg;

>,,..

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

SUBJECT: Report Nos. 50-321/80-46 and 50-366/80-46

This refers to the routine inspection conducted by B. R. Crowley of this office

on December 3-5,

1980, of activities authorized by NRC Operating license Nos.

DPR-57 and NPF-5 for the Hatch facility. Our preliminary findings were discussed

with T. V. Green at the conclusion of the inOection.

Areas examined during the inspection and out findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appendix A.

Elements to be included in your response are delineated in Appendix A.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC Public Document Room. If this report contains

any information that you believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold such infor-

mation from public disclosure. Any such application must include the basis for

. claiming that the information is proprietary and the proprietary information

should be contained in a separate part of the document. If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

,

Charles E.

urphy,

ief

Reactor Construction & Engineering

Support Branch

Enclosures:

(See Page 2)

810325 0 h-

.- ._

c.

.

-

.-

Georgia-Power Company

-2-

JAN 2 91981

Enclosures:

1.

Appendix A, Notice of Violation

2.

_ Inspection Report Nos. 50-321/80-46

and 50-366/80-46

cc.w'/ encl:

M. Manry, Plant Manager

C.' E. Belflower, Site QA Supervisor

-

W. A. Widner, Vice President and

General. Manager-Nuclear Generation