. _ . +
W
f LE:
'o
UNITED STATES
f,~g
NUCLEAR REGULATORY COMMICSION
-
r
REGION ll
(~
k
f
101 MARIETTA ST
N.W., sulTE 3100
o[
ATLANTA, GEORGIA 3o303
JAN 2 91gg;
>,,..
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
SUBJECT: Report Nos. 50-321/80-46 and 50-366/80-46
This refers to the routine inspection conducted by B. R. Crowley of this office
on December 3-5,
1980, of activities authorized by NRC Operating license Nos.
DPR-57 and NPF-5 for the Hatch facility. Our preliminary findings were discussed
with T. V. Green at the conclusion of the inOection.
Areas examined during the inspection and out findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appendix A.
Elements to be included in your response are delineated in Appendix A.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed report.
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC Public Document Room. If this report contains
any information that you believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold such infor-
mation from public disclosure. Any such application must include the basis for
. claiming that the information is proprietary and the proprietary information
should be contained in a separate part of the document. If we do not hear from
you in this regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
,
Charles E.
urphy,
ief
Reactor Construction & Engineering
Support Branch
Enclosures:
(See Page 2)
810325 0 h-
.- ._
c.
.
-
.-
Georgia-Power Company
-2-
JAN 2 91981
Enclosures:
1.
Appendix A, Notice of Violation
2.
_ Inspection Report Nos. 50-321/80-46
and 50-366/80-46
cc.w'/ encl:
M. Manry, Plant Manager
C.' E. Belflower, Site QA Supervisor
-
W. A. Widner, Vice President and
General. Manager-Nuclear Generation
s
Ip
i. '
I
.i
?
!
'
'
4
>