Submits Revised Response to Re Violation Noted in IE Insp Repts 50-321/80-46 & 50-366/80-46.Uses NRC-desired Format.Corrective Actions:Unit 1 ISI Project Plan Review & Approved
ML19343C731
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/13/1981
From: Widner W
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19343C727 List:
References
NUDOCS 8103250139
Download: ML19343C731 (2)


Text

F-01 Georg:a Power Company 8

230 DeacMree Street

/

Post Othce Box 4545 Attanta Georg:a 30302 Te'epnorte 404 522-6060

'T g

L W. A. Widner

  • ',;7 4 4 GeorgiaPower Nciear GNra[cn March 13, 1981 me sournern erectre system "9 '

U. S. FA; clear Regulatory Commission Office of Inspection and Enforcement

REFERENCE:

Region II - Suite 3100 RII: JPO 101 Marietta Street, NW 50-321/80-46 Atlanta, Georgia 30303 50-366/80-46 ATTENTION: Mr. James P. O'Reilly Gentlenen:

Georgia Power Company submits the following revised response to our submittal of February 23, 1981, regarding the notice of violation for Hatch Unit 1 addressed in FRC Inspection Report 50-321/80-46 and 50-366/80-46, dated January 29, 1981.

The information is being resubmitted in order to properly respond to the notice of violation using the NRC-desired format.

VIOLATION 10 CFR 50, Appendix B, Criteria V, as implenented by paragraph D.9.5 of the FSAR, requires in part, " Activities affecting quality shall be prescribed by documented instruction, procedures, drawings and shall be accomplished in accordance with these instructions, procedures, and drawings".

Paragraph F of plant procedure HtP-904, the applicable procedure for administration of the inservice inspection program, requires that the written document detailing the proposed work to be done be reviewed and approved prior to the outage.

Contrary N

the

above, activities affecting quality were not accomplished in accordance with occumented procedures in that during the " Spring 79 Maintenance Outage", inspections were performed in accordance with a Project Plan which was not approved by the licensee.

This is a Severity Level VI Violation (Supplement I.F.).

RESP 0t6E Admission Or Denial Of The Alleged Violation:

The violation is acknowledged as the Unit 1 1979 Inservice Inspection (ISI) Project Plan was not reviewed and approved by the Plant Review Board (PRB).

B10325 0 \\

m GeorgiaPower d U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Rcgion II - Suite 3100 Page Two March 13, 1981 The Reason (s) For The Violation If Admitted:

A procedural deficiency could be attributed as the cause of the violation as procedure HP-904, " Inservice Inspection Program", did not specifically address who was to approve the plan.

In the case of the 1979 ISI, the Project Plan was reviewed by the ISI engineer prior to the outage and performance of inspections and found acceptable for use.

The actual inspections were performed using PRB-approved NDT procedures.

Corrective Steps Which Have Been Taken. And Results Ach'iNed:

The'1975 ~ Unit 1 ISI Project Plan has recently been reviewed and approved by the PRB, and the vendor has been notified of this action.

Corrective Steps which Will Be Taken To Avoid Further Violations:

In the future, ISI Project Plans are to be reviewed and approved by PRB prior to the inspection.

This requirment has been added to procedure HP-904 so that any question on required approvals will be resolved.

The Date When Full Compliance Will Be Achieved:

1 Plant Hatch is presently in full compliance with the requirements of both revised plant procedure HP-904 and 10 CFR 50, Appendix B,

Criteria V for this item.

If you have any questions or comments in this regard, plmse contact this office.

W. A. Widner states that he is Vice President of Georgia Power Company and is authorized to execute this oath on behalf o' Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.

Georgia Power Company by:

wy' W. A. Widner Swo to and subscribed before me this 13th day of March 1981.

/_f i/

Notary Public, Georgia. State at Large 4/,

M1,U /U, My commission Empires Sept. 20,1983

' ~ '

~

Notary Public Qcti