Forwards IE Insp Repts 50-277/80-03 & 50-278/80-03 on 800201-29 & Notice of Violation,Apps a & B.App B Withheld (Ref 10CFR2.790)
ML19343B685
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/19/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML19343B680 List:
References
NUDOCS 8012300058
Download: ML19343B685 (3)


See also: IR 05000277/1980003

Text

..

.

UNITED STATES

NUCLEAR REGULATORY COMMis5 ION

o,

[

'n

REGION I

$

,j

631 PARK AVENUE

f

KING OF PRUSSI A PENN5Yt.VANIA 19406

%, + . . . + /

SEP 191980

Docket Nos.

50-277

50-278

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

.

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject:

Combined Inspection 50-277/80-03 and 50-278/80-03

This refers to the inspection conoucted by Mr. E. G. Greenman of this

office on February 1 - February 29, 1980 at Peach Bottom Atomic Power

Station, Units 2 and 3, Delta, Pennsylvania and at the corporate offices

in Philadelphia, Pennsylvania of activities authorized by NRC License

Nos. DPR-44 and DPR-56 and to the discussions of our findings held by

Mr. Greenman with Mr. W. T. Ullrich of your staff at the conclusion of

the inspection.

~

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with

this letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Based on the results of this inspection, i~t appears that certain of

your activities were not conducted in full compliance with NRC require-

'

ments, as set forth in the Notices of Violation, enclosed herewith as

Appendices A and B.

These items of noncompliance have been categorized

into the levels as described in our' correspondence to you dated December

31, 1974. This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code

of Federal Regulations.

Section 2.201 requires you to submit to this

office, within twenty (20) days of your receipt of this notice, a

written statement or explanation in reply including:

(1) corrective

steps which have been taken by you and the results achieved; (2) corrective

steps which will be taken to avoid further items of noncompliance; and

(3) the date when full compliance will be achieved.

8012300DR

.-

--

-

-

-

,

.

Philadelphia Electric Company

2

SEP 191930

The item shown in the Notice of Violation (Appendix B) enclosed with this

letter is a recurrent or uncorrected item.

In your response to this letter

please give this matter your particular attention.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosures will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to

be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such information from public

disclosure. Any such application must be accompanied by an affidavit

executed by:the owner of the information, which identifies the document

or part sought to be withheld, and'which contains a statement of reasons

which addresses with specificity the items which will be considered by

the Commission as listed in subparagraph (b) (4) of Section 2.790.

The

information sought to be withheld shall be incorporated as far as possible

into a separate part s - the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Additionally, and in accordance with Section 2.790(d) of the NRC's

" Rules of Practice," Part 2, Title 10, Code of Federal Regulations,

documentation of findings of your control and accounting procedures for

safeguarding special nuclear materials and your facility security pro-

i

cedures are exempt from disclosure; therefore, the pertinent section of

the inspection report and Appendix B, will not be placed in the Public

Document Room and will receive limited distribution.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

-,

!

d.

. Brunner, Chief

Reac' or Operations and fluclear

t

Support Branch

Enclosures:

1.

Appendix A, flotice of Violation

2.

Appendix B,tiotice of Violation *

3,

Office of Inspection and Enforcement Combined Inspection Report

tiurters 50-277/80-03 and 50-278/80-03

-.

..

-

.

. .

_.

_ _ _ -

,

.

SEP 191980

Philadelphia Electric Company

3

-

cc:

W. T. Ullrich, Station Superintendent (w/o Appendix B and Pg.10 of Report)*

Troy B. Conner, Jr., Esquire (w/o Report) (w/o Appendix B)*

'

Eugene J. Bradley, Esquire (w/o Report) (w/o Appendix B)*

Raymond L. Hovis, Esquire (w/o Report) (w/o Appendix B)*

fiichael J. Scibinico, II, Assistant Attorney General (w/o Report) (w/o Appendix B)*

!

  • Contains 2.790 Information

,