ML19341C477

From kanterella
Jump to navigation Jump to search
Updated LER 80-035/03L-1:on 810126,drywell Equipment Drain Sump Outboard Isolation Valve AO-2-2001-16 Exhibited Erratic Closure Time.Caused by Sediment in Valve Restricting Movement.Valve Cleaned
ML19341C477
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 02/13/1981
From: Wunderlich J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19341C476 List:
References
LER-80-035-03L, LER-80-35-3L, NUDOCS 8103030598
Download: ML19341C477 (2)


Text

' I V)

~ (7 77 ,

UPDATE REPORT: PREVIOUS REPORT l-16-81 LICENSEE EVENT REPORT j

3 CONTROL BLOCK: l 1

l l l l l 6

lh (PLEASE PRINT oR TYPE ALL REQUIRED INFoRMAT'ON) lo l1l8 ll 7 3 l t lLICENSEE Q l ACOOE l0 l 2l@l150 l 0 l 0 l - lLaCENSE 14 0 l 0NoveERl 0 l - l 0 l 0 l 0 l@l2S 26 4lLICENSE 1l Il TYPE 1l 1l@l 40 l

67 GAT bd l@

CON'T lojil 7 8 "E] l L60l@l061l 5 l0 l0 l0 l2 16 l5 l@led 0 l691 l 2EV lENT6DlATE8 l 1 l@l 0 12 REPORT OOCK ET NUMBER 14 75 l 1 l 3DATE l 8 l 180l@

EVENT DESCalPTION AND PROBABLE CONSEOUENCES h

[a!;;! On December 28, 1980, Drywell Equipment Drain Sump outboard isolation valve A0-  !

[o;,, ; 2-2001-16 was repaired because of slow closure time. Again, On January 26, 1981, .

[g l4 g j the valve had erratic closure time ranging f rom a few minutes to satisfactory l operation. The redundant isolation valve A0-2-2001-15 was kept in the closed i 7m j .g 1 position. Isolation capat,ility of the Equipment Drain Sump was always intact. i li.LJ L  !

isin I 1 e> _

P U E *.1 C LSE C%.! CO"* w. ,

  • uf xx u x.x - .T : . E saCE 3useCCE F5TTI i St D!@ l El@ l B l@ lV l A IL JV jE lX l@ l E l@ l D l @

7 8 11 12 13 18 li

__ SEOVE NTI AL OCCU92E*:: N.;- REVIS!GN o a .- CE%TTEba REaCHT%O. CCOE 's c. %C

@ .ff.g I8101 1-1 101315l l-l l 0l 3 l lLl l-l l.I

_ 21 22 23 24 2ti 27 28 23 JJ Ji 32 TAK A YC O PLA T T e400RS 22 S 8 if o FOR1 Is. S PPLIE MANL A T R l B lgl4Z ig l Z lg J

lMZ lg l0l0l0l 32 l

40 gg 41 l Y Jg 42 l N lg 43 l C j 6 l 6 lER5lg 44 47 CAUSE CESCRIPTION AND CCRRECTivE ACTIONS h l i l o j 1 Upon investigation, sediment was found inside the valve. This restricted valve l i,,,jl movement which caused erratic closure times. The valve was dismantled and cleaned. ,

,,,,,l On February 6,1981, the valve was stroked three times satisfactorily and found to  ;

, ;,; j be within Technical Specifications Table 3.7-1. l 11 141 l l 7 8 9 90 ST '6 POWER OTHER STATUS ISCO RY DISCOVERY CESCRIPTiGN NA Operational Event l1 is l l E l@ l 0l 8 l 6l@l _ l l A l@l l ACTivlTY CO TENT RELEASED OF RELE ASE AMOUNT OF ACTIVITY LOCATION OF RELEASE I1 l 6 l l Z l @ l Zlgl NA l l NA , ~l 7 8 3 10 11 44 45 %0 PERSONNEL EXPCSURES NU P/8 E R TYPE C E SCRIPTiCN l i 171 l 0 l 0 l 0 l@l Z j@l 4A l

' ' ' ' 2 *

,ERSONNE L%c' Ries NUP/9 E R DESCRlPTION li j a l l 0 l 0 l 0 l@j NA l 7 8 9 11 12 80 LCSS OF 09 OAMAGE TO FAC&LITY TvaE C E 3C R t P TIO*4 fit'llZl@l J $ 9 10 NA 80 l

ISSUE NA 12101 I N fhlCESCRIPTION l llll lllll1ll l]

6163 03 0fi[ J R Wunderlich 3$9-U54-2241, ext. 196 l NAME OF PREPARER PHONE: j

.e ~'

1. LER NUMBER: LER/RC 80-35/03L-1
11. LICENSEE NAME: Commonwealth Edison Company Quad-Cities Nuclear Power Station lil. FACILITY NAME: Unit Two IV. DOCKET NUMBER: 050-265 V. EVENT DESCRIPTION:

On December 28, 1980, the Drywell Equipmert Drain Sump outboard isolation valve A0-2-2001-16 had an excessive closure time of approximately 15 minutes. The stroke of the valve was lengthened, the packing was adjusted and both the open and shut limit switches were reset. On the same day the valve was cycled three times satisfactorily with a closure time of 4.2.

seconds. On January 26, 1981, valve A0-2-2001-16 again showed erratic closure times. Time for the valve to close ranged ' rom a few minutes to satisfactory operation. A work request was initiated to further investigate the erratic closure times.

VI. PROBABLE CONSEQUENCES OF THE OCCURRENCE:

Per Technical Specification 3.7.D.2., continued reactor operation is allowed, provided that at least one valve in that llae is closed. The redundant outboard isolation valve, A0-2-2001-15, was closed. At all times the reactor was operated withir, the requirements of the Technical Specification.

Impact upon the system was also minimal. The recirculation through the Drywell Equipment Drain Sump coolers was in no way impaired, and the sump had been pumped down immediately prior to the occurrence. Coolant leakages were within the Technical Specification limits.

Vll. CAUSE:

Upon investigation it was found that an accumulaticn of sediment from the Drywell Equipment Drain Sump had collected in the valve body around the stem and valve disc areas, which was preventing obstruction-free travel of the valve internals.

Vill. CORRECTIVE ACTION:

The Drywell Equipment Drain Sumps were out cf service during the repair and the following items were performed: the A0-2-2001-16 valve was dismantled and the internals thoroughly cleaned of all residue and sediment. i t was then re-assembled with a new bcdy to bonnet gasket. On February 6, 1981, it was stroked three times satisfactorily and found to be within Technical Speci fication Table 3.7-1.