ML19339K494
ML19339K494 | |
Person / Time | |
---|---|
Site: | 05200001 |
Issue date: | 03/08/1993 |
From: | Barrett R Office of Nuclear Reactor Regulation |
To: | Pierson R Office of Nuclear Reactor Regulation |
Shared Package | |
ML19339K495 | List: |
References | |
NUDOCS 9303300319 | |
Download: ML19339K494 (1) | |
Similar Documents at 05200001 | |
---|---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20129C3241996-10-21021 October 1996
[Table view]Forwards Response to NEI Proposals Re Three Design Certification Issues NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20149E5221994-06-0909 June 1994 Requests Commission Approval to Publish Encl FSER for GE ABWR Design Indicated in 940304 Memo ML20149E5131994-05-31031 May 1994 Informs That NRC in Process of Completing FSERs for Both GE Advanced BWR & ABB-CE Sys 80+ Designs.Safety Conclusions Will Need to Be Reassessed by Both NRC & Design Certification Applicants on Listed Issues ML20029D6381994-05-0202 May 1994 Submits Review of ABWR Ts,Amend 34 ML20059E4941994-01-0707 January 1994 Submits to file,931230 Ltr to J Quirk,Ge Nuclear Energy, W/Copy of FSER on ABWR Design ML20058G9931993-12-0101 December 1993 Notification of 931214 Meeting W/Us Dept of Energy in Rockville,Md to Discuss Status of Advanced Reactor Reviews. Agenda Encl ML20058B0441993-11-15015 November 1993 Forwards Advanced Copy of Draft Paper, Diversity in Method of Measuring RPV Level in ABWR & Sbwr, to Keep Commission Informed About Key Policy & Technical Issues Bearing on Future LWR Designs ML20059K2761993-11-0101 November 1993 Notification of 931110-11 Meeting W/Ge in San Jose,Ca to Discuss Info to Be Included in Nov Submittal of Ssar & Design Certification Material for ABWR Design ML20059J2581993-10-29029 October 1993 Requests Addl Info to Complete Review of Chapter 12 of GE Sbwr SSAR ML20059K3201993-10-26026 October 1993 Advises That Commission Has Agreed W/Staff Recommendation That GE Be Required to Prepare ABWR Design Control Document in SI & Provide Conversion Table from SI to English Units in Lieu of Providing Dual Units ML20057C5411993-09-23023 September 1993 Notification of 930928-30 Meeting W/Ge Nuclear Energy in San Jose,Ca to Discuss Status of Development of TS for Advanced Boiling Water Reactor (ABWR) ML20057B9491993-09-20020 September 1993 Notification of 930921 Meeting W/Ge Nuclear Energy in San Jose,Ca to Discuss ABWR Fire Protection Issues ML20057E9411993-09-16016 September 1993 Revised Notification of 931014 Meeting W/Ge in Rockville,Md to Discuss Remaining Design Related Open Issues for Abwr. Time Changed from 11:30 Pm to 4:30 Pm ML20057B6031993-09-16016 September 1993 Notification of Meeting W/Ge on 931014 in Rockville,Md to Discuss Remaining Design Re Open Issues for ABWR ML20057A8161993-09-0909 September 1993 Notification of 930928 Meeting W/Util in Rockville,Md to Discuss Probabilistic Risk Assessment,Severe Accident,Ts, Unresolved Safety Issues/Generic Safety Issues & Reactor Sys ML20057B4381993-09-0909 September 1993 Informs of Cancellation of 930928 Meeting W/Ge in Rockville,Md ML20056H6471993-09-0707 September 1993 Notification of 930908 & 09 Meetings W/Ge in Rockville,Md to Discuss Resolution of USIs & GSIs for ABWR Design ML20056E0931993-08-17017 August 1993 Notification of 930819 & 20 Meeting W/Ge in Rockville,Md to Discuss Status of Development of TSs for ABWR ML20056E0921993-08-16016 August 1993 Notification of 931005 Mgt Meeting W/Doe in Rockville,Md to Discuss Status of Design Certification Reviews ML20057D1151993-08-16016 August 1993 Notification of 931005 Meeting w/DOE,ABB-CE & GE in Rockville,Md to Discuss Design Certification Reviews. Meeting Cancelled ML20046C0051993-08-0303 August 1993 Notification of 930819-20 Meeting W/Ge in Rockville,Md to Discuss Section 3.8, Electrical Power Sys, of Draft Proof & Review TSs for ABWR ML20046B9921993-08-0303 August 1993 Notification of 930812 Meeting W/Nsss Owners Groups on New TS Improvements ML20056D9391993-07-30030 July 1993 Notification of 930823-26 Meeting W/Ge to Discuss Instrumentation & Control TS for ABWR ML20056D0671993-07-19019 July 1993 Submits Daily Highlights Re Meeting W/Ge in San Jose,Ca to Discuss ITAAC for ABWR ML20045C6711993-06-17017 June 1993 Notification of 930621-24 Meeting W/Util in Livermore,Ca to Discuss Resolution of Differences Between ABWR & Previous Designs on I&C TS ML20044H4911993-06-0404 June 1993 Notification of 930621-24 Meeting W/Ge in San Jose,Ca to Discuss Issues Re Structural Design Review for ABWR ML20044H1291993-05-27027 May 1993 Notification of 930602-03 Meeting W/Licensee in Germantown, MD to Formulate Definitions for TSs on I&C for Design Certification of Abwr.Rev 2 (Location Change) ML20044H0021993-05-27027 May 1993 Notification of Location Change for 930602 & 03 Meeting W/Ge in Bethesda,Md to Discuss Advanced BWR TS on Instrumentation & Control.Location Changed from Rockville to Bethesda ML20036B4781993-05-20020 May 1993 Notification of 930615-16 Meeting W/Ge Nuclear Energy in San Jose,Ca to Provide ACRS sub-committee Opportunity to Gather Info About Concerns & Issues Associated W/Review of GE ABWR SAR & Final SER ML20045D6131993-04-29029 April 1993 Provides GE Submittal of Structures,Sys & Components to Be Included in ABWR Drap & Orap Programs Based on PSA Insights ML20035F6891993-04-19019 April 1993 Forwards Fax Sent to J Duncan,Ge Discussing Thoughts Author & Contractor Had on Shutdown Analysis for Advanced BWR ML20035F1151993-04-13013 April 1993 Notification of 930519 & 20 Meetings W/Ge in San Jose,Ca to Provide ACRS Subcommittee Opportunity to Tour GE Facility & Resolve Concerns & Issues Associated W/Review of GE Abwr,Sar & Fser.Meeting Canceled ML20035D4401993-04-0707 April 1993 Informs That Staff Has Been Developing Commission Paper Which Will Include Revised Schedule for ABWR Review & Has Scheduled Std 3-month ACRS Review Period in Proposed Review Schedules for Other Advanced Reactor Reviews,Per ML20035B8911993-03-25025 March 1993 Notification of 930331 Meeting W/Util in Rockville,Md to Discuss Operating Experience, Min Inventory of Alarms, Controls,Indications & Scope of HFE Design for ABWR ML20035A6741993-03-24024 March 1993 Forwards Fax Sent to J Duncan Re Comments on GE Response to Questions on Advanced BWR Probabilistic Flooding Analysis ML20035A1931993-03-22022 March 1993 Notification of 930401 Meeting W/Ge Nuclear Energy in Rockville,Md to Discuss Issues Re Approval of Future Fuel Designs for ABWR ML20035A1951993-03-22022 March 1993 Notification of 930331 Meeting W/Ge in Rockville,Md to Discuss Issues Re Staff Review of SSAR for Abwr,Including PRA & Severe Accident Closure for ABWR ML19339K4941993-03-0808 March 1993 Forwards Energy Research,Inc Final Rept Entitled, Assessment of Ex-Vessel Fuel-Coolant-Interaction Energetics for GE ABWR, for Transmittal to GE ML20128K2761993-02-12012 February 1993 Notification of 930203-25 Meeting W/Ge in San Jose,Ca to Discuss Open Items Identified by Staff Review of Chapter 8 (Electrical Sys) of SSAR for ABWR ML20128H0421993-02-0909 February 1993 Forwards Proprietary Rev 0 to PED-18-0389, PECO Peach Bottom 2 & 3 Nuclear Power Plants...Mg Set Missile Generation Study, for Use in Review of ABWR Ssar.Encl Withheld ML20128G2601993-02-0909 February 1993 Discusses Ways to Expedite Review of Design Certification Application for ABWR & Lists Scenarios for ACRS Review within One Month Review Period ML20128C2081993-01-29029 January 1993 Notification of 930203-04 Meeting W/Ge in Rockville,Md to Discuss Guidelines for ITAAC for ABWR ML20034H7931993-01-28028 January 1993 Forwards Fax Sent to J Duncan,Ge,Containing Questions Previously Sent to J Duncan on ABWR Pra.Other Thoughts on PRA-based ITAAC Also Included ML20127P4701993-01-26026 January 1993 Notification of 930222 & 23-25 Meeting W/Ge in San Francisco,Ca to Conduct Design Calculation Audit & to Close Out Open Items Identified in Dser ML20127H0531993-01-15015 January 1993 Notification of 930125 Meeting W/Ge in San Jose,Ca to Discuss & Resolve Outstanding Open,Confirmatory & Insps, Tests,Analyses & Acceptance Criteria Items in Draft Final Ser,Chapters 2,6, & 15 ML20127F6441993-01-11011 January 1993 Notification of 930120 Meeting W/Ge in San Jose,Ca to Discuss ABWR Draft Final SER Open Items Re PRA ML20127C0401993-01-0808 January 1993 Notification of 930121 Meeting W/Ge in San Jose,Ca to Discuss ABWR Open Items & Staff Review Schedule ML20127B5401993-01-0707 January 1993 Notification of 930108 Meeting W/Ge in Rockville,Md to Discuss ABWR Open Issues ML20127D6651992-12-29029 December 1992 Forwards Fax Sent to J Duncan of GE Providing Updated Punch List for Advanced BWR PRA Issues 1996-10-21 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20129C3241996-10-21021 October 1996
[Table view]Forwards Response to NEI Proposals Re Three Design Certification Issues NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20149E5221994-06-0909 June 1994 Requests Commission Approval to Publish Encl FSER for GE ABWR Design Indicated in 940304 Memo ML20149E5131994-05-31031 May 1994 Informs That NRC in Process of Completing FSERs for Both GE Advanced BWR & ABB-CE Sys 80+ Designs.Safety Conclusions Will Need to Be Reassessed by Both NRC & Design Certification Applicants on Listed Issues ML20029D6381994-05-0202 May 1994 Submits Review of ABWR Ts,Amend 34 ML20059E4941994-01-0707 January 1994 Submits to file,931230 Ltr to J Quirk,Ge Nuclear Energy, W/Copy of FSER on ABWR Design ML20058G9931993-12-0101 December 1993 Notification of 931214 Meeting W/Us Dept of Energy in Rockville,Md to Discuss Status of Advanced Reactor Reviews. Agenda Encl ML20058B0441993-11-15015 November 1993 Forwards Advanced Copy of Draft Paper, Diversity in Method of Measuring RPV Level in ABWR & Sbwr, to Keep Commission Informed About Key Policy & Technical Issues Bearing on Future LWR Designs ML20059K2761993-11-0101 November 1993 Notification of 931110-11 Meeting W/Ge in San Jose,Ca to Discuss Info to Be Included in Nov Submittal of Ssar & Design Certification Material for ABWR Design ML20059J2581993-10-29029 October 1993 Requests Addl Info to Complete Review of Chapter 12 of GE Sbwr SSAR ML20059K3201993-10-26026 October 1993 Advises That Commission Has Agreed W/Staff Recommendation That GE Be Required to Prepare ABWR Design Control Document in SI & Provide Conversion Table from SI to English Units in Lieu of Providing Dual Units ML20057C5411993-09-23023 September 1993 Notification of 930928-30 Meeting W/Ge Nuclear Energy in San Jose,Ca to Discuss Status of Development of TS for Advanced Boiling Water Reactor (ABWR) ML20057B9491993-09-20020 September 1993 Notification of 930921 Meeting W/Ge Nuclear Energy in San Jose,Ca to Discuss ABWR Fire Protection Issues ML20057E9411993-09-16016 September 1993 Revised Notification of 931014 Meeting W/Ge in Rockville,Md to Discuss Remaining Design Related Open Issues for Abwr. Time Changed from 11:30 Pm to 4:30 Pm ML20057B6031993-09-16016 September 1993 Notification of Meeting W/Ge on 931014 in Rockville,Md to Discuss Remaining Design Re Open Issues for ABWR ML20057A8161993-09-0909 September 1993 Notification of 930928 Meeting W/Util in Rockville,Md to Discuss Probabilistic Risk Assessment,Severe Accident,Ts, Unresolved Safety Issues/Generic Safety Issues & Reactor Sys ML20057B4381993-09-0909 September 1993 Informs of Cancellation of 930928 Meeting W/Ge in Rockville,Md ML20056H6471993-09-0707 September 1993 Notification of 930908 & 09 Meetings W/Ge in Rockville,Md to Discuss Resolution of USIs & GSIs for ABWR Design ML20056E0931993-08-17017 August 1993 Notification of 930819 & 20 Meeting W/Ge in Rockville,Md to Discuss Status of Development of TSs for ABWR ML20056E0921993-08-16016 August 1993 Notification of 931005 Mgt Meeting W/Doe in Rockville,Md to Discuss Status of Design Certification Reviews ML20057D1151993-08-16016 August 1993 Notification of 931005 Meeting w/DOE,ABB-CE & GE in Rockville,Md to Discuss Design Certification Reviews. Meeting Cancelled ML20046C0051993-08-0303 August 1993 Notification of 930819-20 Meeting W/Ge in Rockville,Md to Discuss Section 3.8, Electrical Power Sys, of Draft Proof & Review TSs for ABWR ML20046B9921993-08-0303 August 1993 Notification of 930812 Meeting W/Nsss Owners Groups on New TS Improvements ML20056D9391993-07-30030 July 1993 Notification of 930823-26 Meeting W/Ge to Discuss Instrumentation & Control TS for ABWR ML20056D0671993-07-19019 July 1993 Submits Daily Highlights Re Meeting W/Ge in San Jose,Ca to Discuss ITAAC for ABWR ML20045C6711993-06-17017 June 1993 Notification of 930621-24 Meeting W/Util in Livermore,Ca to Discuss Resolution of Differences Between ABWR & Previous Designs on I&C TS ML20044H4911993-06-0404 June 1993 Notification of 930621-24 Meeting W/Ge in San Jose,Ca to Discuss Issues Re Structural Design Review for ABWR ML20044H1291993-05-27027 May 1993 Notification of 930602-03 Meeting W/Licensee in Germantown, MD to Formulate Definitions for TSs on I&C for Design Certification of Abwr.Rev 2 (Location Change) ML20044H0021993-05-27027 May 1993 Notification of Location Change for 930602 & 03 Meeting W/Ge in Bethesda,Md to Discuss Advanced BWR TS on Instrumentation & Control.Location Changed from Rockville to Bethesda ML20036B4781993-05-20020 May 1993 Notification of 930615-16 Meeting W/Ge Nuclear Energy in San Jose,Ca to Provide ACRS sub-committee Opportunity to Gather Info About Concerns & Issues Associated W/Review of GE ABWR SAR & Final SER ML20045D6131993-04-29029 April 1993 Provides GE Submittal of Structures,Sys & Components to Be Included in ABWR Drap & Orap Programs Based on PSA Insights ML20035F6891993-04-19019 April 1993 Forwards Fax Sent to J Duncan,Ge Discussing Thoughts Author & Contractor Had on Shutdown Analysis for Advanced BWR ML20035F1151993-04-13013 April 1993 Notification of 930519 & 20 Meetings W/Ge in San Jose,Ca to Provide ACRS Subcommittee Opportunity to Tour GE Facility & Resolve Concerns & Issues Associated W/Review of GE Abwr,Sar & Fser.Meeting Canceled ML20035D4401993-04-0707 April 1993 Informs That Staff Has Been Developing Commission Paper Which Will Include Revised Schedule for ABWR Review & Has Scheduled Std 3-month ACRS Review Period in Proposed Review Schedules for Other Advanced Reactor Reviews,Per ML20035B8911993-03-25025 March 1993 Notification of 930331 Meeting W/Util in Rockville,Md to Discuss Operating Experience, Min Inventory of Alarms, Controls,Indications & Scope of HFE Design for ABWR ML20035A6741993-03-24024 March 1993 Forwards Fax Sent to J Duncan Re Comments on GE Response to Questions on Advanced BWR Probabilistic Flooding Analysis ML20035A1931993-03-22022 March 1993 Notification of 930401 Meeting W/Ge Nuclear Energy in Rockville,Md to Discuss Issues Re Approval of Future Fuel Designs for ABWR ML20035A1951993-03-22022 March 1993 Notification of 930331 Meeting W/Ge in Rockville,Md to Discuss Issues Re Staff Review of SSAR for Abwr,Including PRA & Severe Accident Closure for ABWR ML19339K4941993-03-0808 March 1993 Forwards Energy Research,Inc Final Rept Entitled, Assessment of Ex-Vessel Fuel-Coolant-Interaction Energetics for GE ABWR, for Transmittal to GE ML20128K2761993-02-12012 February 1993 Notification of 930203-25 Meeting W/Ge in San Jose,Ca to Discuss Open Items Identified by Staff Review of Chapter 8 (Electrical Sys) of SSAR for ABWR ML20128H0421993-02-0909 February 1993 Forwards Proprietary Rev 0 to PED-18-0389, PECO Peach Bottom 2 & 3 Nuclear Power Plants...Mg Set Missile Generation Study, for Use in Review of ABWR Ssar.Encl Withheld ML20128G2601993-02-0909 February 1993 Discusses Ways to Expedite Review of Design Certification Application for ABWR & Lists Scenarios for ACRS Review within One Month Review Period ML20128C2081993-01-29029 January 1993 Notification of 930203-04 Meeting W/Ge in Rockville,Md to Discuss Guidelines for ITAAC for ABWR ML20034H7931993-01-28028 January 1993 Forwards Fax Sent to J Duncan,Ge,Containing Questions Previously Sent to J Duncan on ABWR Pra.Other Thoughts on PRA-based ITAAC Also Included ML20127P4701993-01-26026 January 1993 Notification of 930222 & 23-25 Meeting W/Ge in San Francisco,Ca to Conduct Design Calculation Audit & to Close Out Open Items Identified in Dser ML20127H0531993-01-15015 January 1993 Notification of 930125 Meeting W/Ge in San Jose,Ca to Discuss & Resolve Outstanding Open,Confirmatory & Insps, Tests,Analyses & Acceptance Criteria Items in Draft Final Ser,Chapters 2,6, & 15 ML20127F6441993-01-11011 January 1993 Notification of 930120 Meeting W/Ge in San Jose,Ca to Discuss ABWR Draft Final SER Open Items Re PRA ML20127C0401993-01-0808 January 1993 Notification of 930121 Meeting W/Ge in San Jose,Ca to Discuss ABWR Open Items & Staff Review Schedule ML20127B5401993-01-0707 January 1993 Notification of 930108 Meeting W/Ge in Rockville,Md to Discuss ABWR Open Issues ML20127D6651992-12-29029 December 1992 Forwards Fax Sent to J Duncan of GE Providing Updated Punch List for Advanced BWR PRA Issues 1996-10-21 |
Text
h%R 0 8 S MEMORANDUM FOR:
Robert C. Pierson, Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation l
FROM:
Richard J. Barrett, Chief Containment Systems and Severe Ateident Branch Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation
SUBJECT:
GE fBWR EX-VESSEL FUEL COOLANT INTERACTIONS The Containment bstems and Severe Accident Branch had a contractor perform an assessment of the potential loads resulting from ex-vessel fuel coolant l
l interactions. A copy of the report is attached. Projects should transmit this report to GE and ensure that a copy is placed on the Docket.
.Orlsinal signed tr -
Richard J. Barrett, Chief Containment Systems and Severe Accident Branch
{
Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation
Enclosure:
l As stated DISTRIBUTION: J##
CentFaliFile K JMonninger JKudrick SCSB R/F RBarr tt
/9Q SCS.DSSA SG SA SC JMonninger:lbk JKu ick RBar t
3/f/93 3/
93 3/J /93 OFFICIAL RECORD COPY DOCUMENT NAME:
P: NOTE rp M 'd 9303300319 93030s CF ADOCK 05200001 CF j
r I
i l
_