Forwards IE Insp Repts 50-413/80-14 & 50-414/80-14 on 800602-27 & Notice of Violation
ML19338G522
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/01/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19338G520 List:
References
NUDOCS 8010310029
Download: ML19338G522 (2)


See also: IR 05000413/1980014

Text

'

.

s (/ 3) p* ** hq

c

4

UNITED STATES

8'

-

t

NUCLEAR REGULATORY COMMISSION

'

$

E

REGION ll

3

%

/[

Q

101 MARIETTA sT., N.W., SUITE 3100

ATLANTA, GEORGIA 303o3

AUG ~ 1 1990

In Reply Refer To:

RII:GFM

50-413/80-14

50-414/80-14

-

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by G. F. Maxwell of this office on June 2

through 27, 1980 of activities authorized by NRC Construction Permit Nos. CPPR-

116 and CPPR-117 for the Catawba Nuclear Station facility, and to the discussion

of our findings held with D. G. Beam at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During this inspection it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved. With regard to items B and C,

corrective actions to prevent recurrence were completed prior to conclusion of

this inspection; therefore, a reply is not requested for these items.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it. is

necessary that you make a written application within 20 days to this , office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, ud should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

B910810 075)

.

O

Duke Power Company

-2-

AUG _ ,

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

[

"

C. E. Murphy, 'Chie

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-413/80-14

and 50-414/80-14

cc w/ encl:

J. W. Hampton, Station Manager

D. G. Beam, Project Manager