ML19326C499
| ML19326C499 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 06/17/1977 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Phillips J ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML19326C462 | List: |
| References | |
| NUDOCS 8004230618 | |
| Download: ML19326C499 (2) | |
See also: IR 05000313/1977010
Text
~
O.
.
-
.
-
,
a
~
['
f'
o
NUCLEAR RE U
ORY COMMISSION
-
g
$,
3
611 RYAN la
DRIVE, SUITE 1000
,
.,, .
June 17,1977
Docket No40-313J
50-368
.
Arkansas Power and Light Company
ATTN: Mr. J. D. Phillips
Senior Vice President
Sixth and Pine Streets
Pine Bluff, Arkansas 71601
Gentlemen:
This refers to the inspection conducted by Messrs. M. W. Dickerson,
J. E. Gagliardo, E. H. Johnson, W. Johnson, R. G. Spangler and
T. F. Westerman of this office on May 31 - June 3,1977, of activities
authorized by NRC Operating License No. DPR-51 and NRC Construction
O
Permit No. CPPR-89 for the Arkansas Nuclear One, Units 1 and 2, and to
the discussion of the findings by the inspectors with members of your
!
staff at the conclusion of the inspection.
Areas examined during the inspection included:
(1) implementation of
the operational QA Program; (2) quality assurance for the startup test-
ing program for Unit 2; (3 plant operating, emergency and maintenance
procedures for Unit 2; .(4)) verification of Unit 2 precritical. test
procedures; and (5) followup on previously identified open items.
Within these areas, the inspection consisted of selective examination
-
of procedures and representative records, interviews with personnel,
and observations by the inspectors.
During this inspection it was found that certain of your activities were
not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Enclosure (1).
This
notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
~
Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply
including:
(1) corrective steps which have been taken by you, and the
results achieved; (2) corrective steps which will be taken to avoid
further noncompliance; and (3) the date when full compliance will be
.
achieved.
O
8004230{fg
'
_-
-
_
. . . _
. .
- __
.
-
- .
,
m
-
.
O
'
Arkansas Power and L.ight Company
-2-
June 17,1977
.
'
It was also found that, based on the results of this inspection, several
of your activities appear to have been in deviation with your FSAR
comitments and with the guidance of an industry standard, as set forth
in the Notice of Deviation, enclosed herewith as Enclosure (2). You are
requested to submit to this office within 20 days of your receipt of this
notice, a writtea statement in reply to Deviations A and B which includes:
(1) actions that you plan to take to meet your comitments; and (2) the
date when the above actions will be completed.
Corrective action had
been identified for Deviation C while the inspectors were on-site.
No
response is requested for this item.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2 Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If the report contains any information that you believe to be
!
proprietary, it is necessary that you submit a written application to
l
this office within 20 days of the date of this letter, requesting that
such information be withheld from public disclosure.
The application
3
must include a full statement of the reasons why it is claimed that the
information is proprietary. The application should be prepared so that
,
any proprietary information identified is contained in an enclosure to
'
the application, since the application without the enclosure will also
i
be placed in the Public Document Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
<
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
'
k
-
l
G. L. Madsen, Chief,
P
Reactor Operations and
Nuclear Support Branch
i
Enclosures:
-
1.
2.
Notice of Deviation
3.
IE Inspection Reports Nos. 50-313/77-10 &
50-368/77-11
-