Forwards IE Insp Repts 50-313/77-16 & 50-368/77-21 on 770926-29 & 1007-08 & Notice of Violation
ML19326B745
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 10/20/1977
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cavanuagh W
ARKANSAS POWER & LIGHT CO.
Shared Package
ML19326B724 List:
References
NUDOCS 8004170574
Download: ML19326B745 (2)


See also: IR 05000313/1977016

Text

..--

. . .

.

--

_

___ ._ _ -

4

- .

s

.g

utmeo

UNITED STATES

i

/

^o

NUCLEAR REGULATORY COMMISSION

'

.

['

REGION IV

,

3.

.y

611 RYAN PLAZA DRIVE, SUITE 1000

$;

2'

ARLINGTON, TEXAS 76011

,/

%

~v

  • ""

October 20, 1977

Docket Mos. b

50-368

,

,

F

i

Arkansas Power and Light Company

.ATTH: Mr. William Cavanaugh III

4

~

Executive Director of Generation

and Construction

P. '0. Box 551

'

Little Rock, Arkansas 72203

Gentlemen :

,

This rafers to the inspection conducted by Messrs. R. G. Spangler and

i

J.-E. Gagliardo of this office on September 26-29 and October 7-8, 1977,

of activities authorized by NRC Operating License No. DPR-51 and NRC.

Construction Permit No. CPPR-89 for the Arkansas Nuclear One, Units 1

and 2, and to the discussion of the findings by the inspectors with

4

]

members of your staff at the conclusion of the inspection.

,

"

Areas examined during the inspection include: (1) review of test

program status; (2) fuel receipt inspections; (3) witness of secondary

hydrostatic testing activities; (4) review of Unit jumper and bypass log;

(5) review of Test Working Group activities; (6) review of startup

punchlist; (7) review of overpressure protection commitments; (8) review

of Unit 2 operations orders; (9) review of tiesting of spent fuel pool

wall deficiency; and. (10) review of conformance to posting requirements.

,

~

'

Within .these areas, the inspection consisted of selective examination of

,

procedures and representative records, interviews with personnel, and

observations by-the inspectors.

We have also examined actions you have taken with regard to previously

. identified enforcement matters and unresolved items. The status of these

.

items is> identified in paragraph 3 of the enclosed report.

Two new

unresolved items.are identified in paragraphs 6 and 11 of the enclosed

-

report.

.

l

'

l

s?v

na

-

.

- - - . - . . .

- -

_

. -

J

.

,

'*

.

,

A

.

,

.

.

o

Arkansas Power & Light Company

-2-

October 20, 1977

.

During this inspection it was found that certain of your activities were

'

not conducted in full compliance with NRC requirements, as set forth in

the Notice of Violation, enclosed herewith as Enclosure (1). This

4

notice is sent to you pursuant to the provisions of Section 2.201 of the

NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you.to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply

including:

(1) corrective steps which have been taken by you, and the

results achieved; (2) corrective steps which will be taken to avoid

i

further noncompliance; and (3) the date when full compliance will be

achieved.

It was also found that certain of your activities were in deviation with

your comitments to the Commission as set forth in paragraph 3 of the

enclosed inspection report. You are requested to submit to this office

within 20-days of your receipt of this letter, a written statement in reply

which includes:

(1) actions that you plan to take to meet your comitments;

and (2) the date when the above actions will be completed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10 Code of Federal Regulations, a copy of this letter and the

s

)

enclosed inspection report will be placed in the NRC's Public Document

"'

Room.

If the report contains any information that you believe to be

proprietary, it is necessary that you submit a written application to

,

this office within 20 days of the date of this letter, requesting that

such information be withheld from public disclosure. The application

must include a full statement of the reasons why it is claimed that the

information. is proprietary. The application should be prepared so that

any proprietary information identified is contained in an enclosure to

the application, since the application without the enclosure will also

t

,

be placed in the Public Document Room.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

'

Should you have any questions concerning this inspection, we will be

pleased to d.iscuss them with you.

Sincerely,

"h.$ '/7?c $&

r

G. L. Madsen, Chief,

l

Reactor Operations and

Nuclear Support Branch

O

Enclosures:

(/

1. -Notice of Violation

2.

IE Inspection Report Nos. 50-313/77-16 &