Similar Documents at Perry |
---|
Category:Letter type:L
MONTHYEARL-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-049, Core Operating Limits Report for Operating Cycle 202023-03-30030 March 2023 Core Operating Limits Report for Operating Cycle 20 L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-085, 1 to Emergency Plan2023-03-10010 March 2023 1 to Emergency Plan L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-23-017, Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 192023-01-31031 January 2023 Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 19 L-22-271, Emergency Plan2022-12-20020 December 2022 Emergency Plan L-22-272, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023)2022-12-16016 December 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023) L-22-263, Spent Fuel Storage Cask Registration2022-12-12012 December 2022 Spent Fuel Storage Cask Registration L-22-254, Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 222022-11-18018 November 2022 Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22 L-22-250, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 192022-11-0808 November 2022 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 19 L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-10-18018 October 2022 Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-201, Submittal of Evacuation Time Estimates2022-09-12012 September 2022 Submittal of Evacuation Time Estimates L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual2022-08-0909 August 2022 Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-08-0505 August 2022 Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-171, Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-0632022-07-14014 July 2022 Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 L-22-099, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis2022-06-0101 June 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis L-22-104, Annual Radiological Environmental Operating Report2022-04-28028 April 2022 Annual Radiological Environmental Operating Report L-22-110, Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement2022-04-28028 April 2022 Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement L-22-105, Annual Radiological Effluent Release Report2022-04-27027 April 2022 Annual Radiological Effluent Release Report L-22-082, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-23023 March 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations L-22-056, Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage2022-03-22022 March 2022 Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage L-22-052, Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines2022-03-16016 March 2022 Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines L-22-073, Submittal of the Decommissioning Funding Status Report for Perry Nuclear Power Plant2022-03-16016 March 2022 Submittal of the Decommissioning Funding Status Report for Perry Nuclear Power Plant L-22-023, Retrospective Premium Guarantee2022-02-17017 February 2022 Retrospective Premium Guarantee L-21-280, 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements2022-01-0505 January 2022 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements L-21-282, Proposed Inservice Inspection Alternative IR-0632022-01-0505 January 2022 Proposed Inservice Inspection Alternative IR-063 L-21-259, 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing2021-12-28028 December 2021 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing L-21-287, Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter)2021-12-20020 December 2021 Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter) 2024-01-24
[Table view] |
Text
FENOC Perry Nuclear Power Plant P.O. Box97 10 Center Road r~ ..r- m , /-.
- rs- Perry, Ohio 44081 FirstEnergy Nuclear Operating Company y Frank Payne 440-280-5382 Vice President November 19, 2019 L-19-269 10 CFR 50.46 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Report of ECCS Model Changes and Errors Pursuant to 10 CFR 50.46 On October 29, 2019, Global Nuclear Fuel - Americas, LLC provided a notification to FirstEnergy Nuclear Operating Company that identified an error in an acceptable evaluation model regarding the emergency core cooling system (ECCS) - loss of coolant accident (LOCA) analyses for the Perry Nuclear Power Plant (PNPP). Pursuant to 10 CFR 50.46, "Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors," FirstEnergy Nuclear Operating Company (FENOC) is notifying the Nuclear Regulatory Commission (NRC) of the error.
The driving differential pressure for forward and backward bypass leakage is limited with an upper and lower limit in the SAFER code. The limits are implemented correctly on all but one of the nine leakage paths. The error occurred with the lower limit for the control rod guide tube to control rod drive housing interface backward leakage path.
A SAFER version correcting the lower limit on differential pressure for bypass leakage issue confirmed the software code error had no impact on the ECCS LOCA event evaluations. Therefore, the effect on peak cladding temperature is reported as 0°F.
The error and the impact of the error was reported for both the GE14 and GNF2 fuel-types. In Operating Cycle 17, PNPP had a mixed core of GE14 and GNF2 fuel. During the refueling outage that ended in April 2019, PNPP went to a complete core of GNF2 fuel.
The attachment contains a summary of the 10 CFR 50.46 changes and errors, including the most recent change, applicable to the GE14 fuel that had been used at PNPP. The summation of the absolute values of these changes and errors results in a value that
Perry Nuclear Power Plant L-19-269 Page 2 meets the definition of a significant change as defined by 10 CFR 50.46(a)(3)(i).
Therefore, pursuant to 10 CFR 50.46(a)(3)(ii), NRC notification of the recent error is required within 30 days, relative to the GE14 fuel. Although there is the same effect on the PCT for GNF2 fuel, NRC notification is not required, since the summation of absolute values of the changes and errors applicable to GNF2 fuel does not meet the definition of a significant change.
As a result of this error, along with previously reported changes and errors, the PNPP PCT for GE14 fuel remains 1555°F and continues to satisfy the 10 CFR 50.46(b)(1) criteria of PCT not to exceed 2200°F. Since PNPP no longer uses GEM fuel, a reanalysis is not warranted, and no other action is required.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Acting Manager - Nuclear Licensing and Regulatory Affairs, at (330) 315-6808.
Si Fra
Attachment:
Perry Nuclear Power Plant 10 CFR 50.46 Changes and Errors cc: NRC Region III Administrator NRC Resident Inspector NRC Project Manager
Attachment L-19-269 Perry Nuclear Power Plant 10 CFR 50.46 Changes and Errors Page 1 of 2 Vendor Summary of Change/Error Licensing Basis Peak Licensee Report of Notification Cladding Temperature Notification Number (PCT) Impact (Accession No.)
2001-02 Impact of SAFER1 pressure PCT impact for GE14 ML020710641 rate inconsistency error. fuel is +5°F.
2002-01 Impact of SAFER core spray PCT impact for GE14 ML030710170 injection elevation error. fuelis+15°F.
2002-02 Impact of SAFER bulk water PCT impact for GE 14 ML030710170 level error. fuel is 0°F.
2002-04 Impact of SAFER04 PCT impact for GE14 ML030710170 computer platform change. fuel is 0°F 2002-05 Impact of error in WEVOL2 PCT impact for GE 14 ML030710170 calculation of downcomer free fuel is 0°F.
volume.
2003-01 Impact of SAFER level/ PCT impact for GE 14 ML040710502 volume table error. fuel is +5°F.
2003-03 Impact of SAFER initial steam PCT impact for GE14 ML040710502 separator pressure drop fuel is 0°F.
error.
2003-05 Impact of postulated PCT impact for GE14 ML040710502 post-LOCA3 hydrogen-oxygen fuel is 0°F.
recombination.
2006-01 Impact of top peaked power PCT impact for GE 14 ML062490520 shape for small break LOCA fuel is 0°F. ML070390113 analysis.
2011-02 Impact of database error for PCT impact for GE 14 ML112290919 heat deposition for fuel is +25°F.
10X10 fuel bundles.
2011-03 Impact of updated formulation PCT impact for GE14 ML112290919 gamma heat deposition to fuel is -40°F.
channel wall for 10X10 fuel bundles.
2012-01 Impact of change in fuel PCT impact for GE 14 ML12353A320 properties from GESTR fuel is +20°F.
to PRIME
Attachment L-19-269 Page 2 of 2 Perry Nuclear Power Plant 10 CFR 50.46 Changes and Errors (Continued)
Vendor Summary of Change/Error Licensing Basis Peak Licensee Report of Notification Cladding Temperature Notification Number (PCT) Impact (Accession No.)
2014-01 Impact of use of a new PCT impact for GE14 ML14170A178 version of SAFER04A. fuel is 0°F 2014-02 Impact of system mass PCT impact for GE14 ML14170A178 divergence error. fuel is 0°F 2014-03 Impact of minimum delta PCT impact for GE14 ML14170A178 pressure error. fuelis-15°F.
2014-04 Impact of counter current flow PCT impact for GE14 ML14170A178 limitation (CCFL) error. fuel is 0°F 2017-02 Impact of fuel rod plenum PCT impact for GE14 ML17233A279 temperature update. fuel is 0°F 2019-05 Impact of lower control rod PCT impact for GE14 This submittal drive housing interface fuel is 0°F backward leakage path TOTAL Summation of the absolute 125°F values of the changes/errors.
Notes: 1. SAFER - Name of the code developed by General Electric Company that calculates long term reactor vessel inventory and peak cladding temperature for LOCA and loss of inventory events.
- 2. WEVOL - Name of a code that is used to calculate the weight and volume inputs for jet pump plant SAFER analyses.
- 3. LOCA - Loss of coolant accident.