[pd.
)
-
a
pa "Eco
UNITED STATES
NUCLEAR REGULATORY COMMISSION
j
4
,og
,
l
y
s,(
g
REGloN 11
.s
"
g
230 PEACHTREE STREET NXi SUITE 1217
-
I
o,
ATLANTA, GEORGIA 30303
%, '
/
4 1977
- ...*
In Reply Refer To:
i
RII:ADK
50-269/77-21
50-270/77-21
50-287/77-21
Duke Power Company
Attn:
Mr. William O. Parker, Jr.
Vice President, Steam Production
1
P. O. Box 2178
422 South Church Street
Charlotte, North Carolina
28242
Gentlemen:
This refers to the inspection conducted by Mr. A. D. Kowalczuk of this
office on September 14-16, 1977, of activities authorized by NRC Operating
)
License Nos. DPR-38, DPR-47 and DPR-55 for the Oconee Nuclear Station
Unit 1, 2 and 3 facilities, and to the discussion of our findings held
with Mr. R. M. Koehler at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously
identified inspection findings.
These are discussed in the enclosed
,
inspection report.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements.
This item
and references to pertinent requirements are listed in the Notice of
Violation enclosed herein as Appendix A.
This notice is sent to you
pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Fede
.. Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
19120507/g
.
_
. . _ _ - -
.
_ _ _ _ _ _
_ . . .
.
-_
_
__.
.
i 19
.
-
'
. _ .)
..
. #
Duke Power Company
-2-
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
,
Document Room. If this report contains any information that you (or
1
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
,
such information from public disclosure. Any such application must
j
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
j
Very truly yours,
J. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
1.
Appendix A, Notice
of Violation
2.
RII Inspection Report Nos.
50-269/77-21
50-270/77-21
50-287/77-21
cc:
Mr. J. E. Smith, Station Manager
Oconee Nuclear Plant
P. O. Box 1175
Seneca, S. C.