Text
,.
Jul 0 8 IWO
/
Docket No. 50-293 EA-80-38 B'oston Edison Company M/C Nuclear ATTN:
Mr. G. Carl Andognini, Manager Nuclear Operations Department 800 Boylston Street Boston, Massachusetts 02199 Gentlemen:
On March 8, 1980, irradiated fuel was moved at the Pilgrim Nuclear Power Station without secondary containment intaqrity, an event which exceeded a Limiting Condition for Operation (LCO).
t-urthermore, this activity was conducted in a manner that apparently violated station fuel handling procedures.
In addition, the auxiliary electrical system, including emergency power, was aligned in a condition not prescribed by plant procedures.
These matters were brought to our attention by your telephone notification and report (LER 80-008/01X-0) of March 8, 1980.
Your commitment to halt further fuel handling operations until immediate corrective actions were completed and to obtain our concurrence to resume those operations is documented in our letter to you dated March 11, 1980.
Based on our inspector's verification of the return of the auxiliary electrical alignment to a normal standby condition and establishment of secondary containment intergrity on March 21, 1900, our concurrence with fuel handling resumption was communicated to you by our inspector onsite on March 21, 1980.
We are concerned about the implemeritation of your control of licensed activities that allowed these' events to occur.
These events resulted in a violation of a refueling LCO prescribed in the facility Technical Specifica-tions and a noncompliance with operating procedures for fuel handling and for equipment alignment required by.the Technical Specifications.
The personnel errors represent a matter of serious safety significance and indicate weaknesses in your controls which should ensure safe operation of the Pilgrin: Nuclear Power Station.
As indicated _in Appendix B, we intend to impose civil penalties in the aucunt of $13,000 for the three items of noncompliance described in Appendix A.
In addition to the Civil Penalties, we are issuing a letter of reprimand
- .o one of the licensed Senior Reactor Operators involved in the apparent violation related to the refueling event and a Notice of Violation to tne other licensed Senior Reactor Operator." Copies of these letters are enclosed as Appendices C and D.
CERTIFIED MAIL RETURN RECEIPT REQUESTED
-8007220/7Y g
.f' Boston Edison Company M/C Nuclear JUL 0 819b0 In your reply to this letter please give particular attention to describing those actions you have taken or will take to improve both your controls for the. timely development of required safety related procedures, where foreseeable changes in plant conditions invalidate current procedural coverage, and your controls for personnel actions related to procedure adherence.
Also, you should address your planned improvements in the areas of procedural development, personnel training, and safety related activity supervision, inspection and audit.
Our review of your en u rcement history at the Pilgrim Nuclear Power Station indicates a chronic problem with procedure establishment and implementation.
Your written reply to this letter, combined with our findings from our continuing inspection program, will be considered in determining whether any further enforcement action, such as modification, suspension or revocation of the license, is appropriate.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosures
-will be placed in the NRC's Public Document Room.
Sincerely, J.7.%T 'ga%
Victor Stello, Jr.
Director Office of Inspection and Enforcement
Enclosures:
1.
Appendix A, Notice of Violation 2.
Appendix B, Notice of Proposed Imposition of Civil Penalties 3.
Appendix C, Letter to Mr. E. O'Rork 4.
Appendix D, Letter to Mr. J. Alukonis cc w/encls:
P. J. McGuire, Pilgrim Station Manager
.f a.l
(
a y'
r t,g
- g. m 1
l WPU:$M R0k[
S ROI R0IVJA X009 ELD D.
v l
6/24/80 JRiesland pockett SEBryan NCMoseley DThompson RHoefling RCDe VStello JOB F(3) 6/W/80 6p80 6/1-l/80 6rd'/80 6/
/80 6/ /80 y/f/80ng%/A/80
^-
. Boston Edison Company M/C Nuclear jgt g g 1980
. Distribution:
PDR 3
ACRS SECY CA VStello, IE RDeYoung, IE NMoseley, IE' SBryan, IE JRiesland, IE TBrockett, IE FIngram, PA JMurray, ELD RHoefling, ELD JCrooks, MPA JCummings, OIA Enforcement Coordinators, RI, RII, RIII, RIV, kV IE Files Central Files CP Book CON X005 Reading File EDO Reading File JHannon, NRR TIppolito, NRR RJones, M/S 042 (4)
Massachusetts Department of Public Health ATTN: Robert M. Hallisey, Acting Direc*->
Radiation Control Program 600 Washington Street Boston, MA 0211]
Office of the Attorney General ATTN: Hon. Francis X. Bellotti Attorney General One Ashburton Place Boston, MA 02108 Executive Office of Consumer Affairs ATTN: Doris Pote, Chairman r partment of Public Utilities e
100 Combridge Street Boston, MA' 02202
&-