| 05000302/LER-1978-001, Forwards LER 78-001/03L-0 | Forwards LER 78-001/03L-0 | |
| 05000302/LER-1978-001-03, /03L-0:on 780103,3B Emergency Diesel Failed to Start During Maint on 3A Emergency Diesel Generator.Caused by Foreign Matter in Servo Booster Preventing Governor to Function Properly.Servo Booster Cleaned & Tested | /03L-0:on 780103,3B Emergency Diesel Failed to Start During Maint on 3A Emergency Diesel Generator.Caused by Foreign Matter in Servo Booster Preventing Governor to Function Properly.Servo Booster Cleaned & Tested | |
| 05000302/LER-1978-001-04, /04X-0:on 780112-13,biomass of Fish & Shellfish Impinged on Intake Screens Exceeding 50 kg/24-h ETS Levels. Partially Caused by Coal Barges Entering & Maneuvering in Intake Canal During Sampling | /04X-0:on 780112-13,biomass of Fish & Shellfish Impinged on Intake Screens Exceeding 50 kg/24-h ETS Levels. Partially Caused by Coal Barges Entering & Maneuvering in Intake Canal During Sampling | |
| 05000302/LER-1978-002-03, /03L-0:on 780104,one Cable Tunnel Sump Pump Failed to Start During Operability Verification.Caused by Packaged Sump Pump Electric Motor Portion Failure.Pump Replaced | /03L-0:on 780104,one Cable Tunnel Sump Pump Failed to Start During Operability Verification.Caused by Packaged Sump Pump Electric Motor Portion Failure.Pump Replaced | |
| 05000302/LER-1978-002, Forwards LER 78-002/03L-0 | Forwards LER 78-002/03L-0 | |
| 05000302/LER-1978-002-04, /04X-0:on 780103-04,biomass of Fish & Shellfish Impinged on Intake Screens Exceeding 50 kg/24-h ETS Levels. Partially Caused by Oil Barge Entering Intake Canal During Sampling | /04X-0:on 780103-04,biomass of Fish & Shellfish Impinged on Intake Screens Exceeding 50 kg/24-h ETS Levels. Partially Caused by Oil Barge Entering Intake Canal During Sampling | |
| 05000302/LER-1978-003-03, /03L-O:on 780104,Unit 2 Battery Failed to Meet Quarterly Battery Test SP-511 Criteria.Caused by Electrolyte Stratification Due to Battery No Lead Condition.Request for Engineering Info Initiated to Evaluate & Recommend Solut | /03L-O:on 780104,Unit 2 Battery Failed to Meet Quarterly Battery Test SP-511 Criteria.Caused by Electrolyte Stratification Due to Battery No Lead Condition.Request for Engineering Info Initiated to Evaluate & Recommend Solution | |
| 05000302/LER-1978-003, Forwards LER 78-003/03L-0 | Forwards LER 78-003/03L-0 | |
| 05000302/LER-1978-003-04, /04X-0:on 780119-20,biomass of Fish & Shellfish Impinged on Intake Screens Exceeding ETS Levels.Cause Undetermined | /04X-0:on 780119-20,biomass of Fish & Shellfish Impinged on Intake Screens Exceeding ETS Levels.Cause Undetermined | |
| 05000302/LER-1978-004-04, /04X-0:on 780201,unplanned Radioactive Gas Release Occurred During Maint on Nitrogen Sys Header.Caused by Leaking MUV-141F & MUV-140 Makeup Tank Valves.Revisions Initiated to Consider Interconnecting Sys Impact | /04X-0:on 780201,unplanned Radioactive Gas Release Occurred During Maint on Nitrogen Sys Header.Caused by Leaking MUV-141F & MUV-140 Makeup Tank Valves.Revisions Initiated to Consider Interconnecting Sys Impact | |
| 05000302/LER-1978-004, Forwards Supplemental Info to LER 78-004/04X-0 Re Unplanned Radioactive Gas Release During Maint.Personnel Associated W/Incident & Gaseous Pipe Contents List Encl.List Withheld Per Privacy Act | Forwards Supplemental Info to LER 78-004/04X-0 Re Unplanned Radioactive Gas Release During Maint.Personnel Associated W/Incident & Gaseous Pipe Contents List Encl.List Withheld Per Privacy Act | |
| 05000302/LER-1978-004-03, /03L-0:on 780108,reactor Coolant Dose Equivalent I-131 Found Contrary to Tech Spec Limitations.Caused by Transient Spikes Following Reactor Trip & Known Leaking Fuel Pins.Corrective Action Unnecessary | /03L-0:on 780108,reactor Coolant Dose Equivalent I-131 Found Contrary to Tech Spec Limitations.Caused by Transient Spikes Following Reactor Trip & Known Leaking Fuel Pins.Corrective Action Unnecessary | |
| 05000302/LER-1978-005-04, /04X-0:on 780127-28,biomass of Fish & Shellfish Impinged on Intake Screens Exceeding 51 kg/24-h Tech Spec Level.Partially Caused by Coal Barges Exciting Intake Canal During Sampling Period | /04X-0:on 780127-28,biomass of Fish & Shellfish Impinged on Intake Screens Exceeding 51 kg/24-h Tech Spec Level.Partially Caused by Coal Barges Exciting Intake Canal During Sampling Period | |
| 05000302/LER-1978-005-03, /03L-0:on 780109,one Sump Pump Failed to Start During Cable Tunnel Sump Pump Operability Test SP-322 Performance.Caused by Failure of Start Control Bulb Switch Due to Inadequate Current Capacity | /03L-0:on 780109,one Sump Pump Failed to Start During Cable Tunnel Sump Pump Operability Test SP-322 Performance.Caused by Failure of Start Control Bulb Switch Due to Inadequate Current Capacity | |
| 05000302/LER-1978-005, Forwards LER 78-005/03L-0 | Forwards LER 78-005/03L-0 | |
| 05000302/LER-1978-006, Responds to NRC Re Violation Noted in IE Insp Rept 50-302/78-02.Corrective Actions:Problems Re Clearances Not Being Issued,Placed on Equipment or Released Per CP-115 Corrected.One Case Reported in LER 78-006/03L-0 | Responds to NRC Re Violation Noted in IE Insp Rept 50-302/78-02.Corrective Actions:Problems Re Clearances Not Being Issued,Placed on Equipment or Released Per CP-115 Corrected.One Case Reported in LER 78-006/03L-0 | |
| 05000302/LER-1978-006-03, /03L-0:on 780111,HPI Isolation Valve MUV-25 Breaker Inadvertantly Opened & Red Tagged Out of Svc During Normal Mode 1 Operations.Clearance Procedure Reviewed W/Personnel | /03L-0:on 780111,HPI Isolation Valve MUV-25 Breaker Inadvertantly Opened & Red Tagged Out of Svc During Normal Mode 1 Operations.Clearance Procedure Reviewed W/Personnel | |
| 05000302/LER-1978-006-04, /04X-0:on 780206-07,biomass of Fish & Shellfish Impinged on Intake Screens of Units 1,2 & 3 Exceeded 50 Kg Per 24-h Reporting Level.Cause Unknown | /04X-0:on 780206-07,biomass of Fish & Shellfish Impinged on Intake Screens of Units 1,2 & 3 Exceeded 50 Kg Per 24-h Reporting Level.Cause Unknown | |
| 05000302/LER-1978-007-01, /01T-2:on 780204,valve Operator FWV-15 Not Changed as Required by Upgrading of Steam Line Rupture Matrix.Caused by Lack of Appropriate Engineering Change Notice.Mod Package Completed.(Supplementary Info Sheet Only.) | /01T-2:on 780204,valve Operator FWV-15 Not Changed as Required by Upgrading of Steam Line Rupture Matrix.Caused by Lack of Appropriate Engineering Change Notice.Mod Package Completed.(Supplementary Info Sheet Only.) | |
| 05000302/LER-1978-007, Forwards Revision 2 to LER 78-007/01T-0,consisting of Supplementary Info | Forwards Revision 2 to LER 78-007/01T-0,consisting of Supplementary Info | |
| 05000302/LER-1978-007-04, /04X-0:on 780216 & 17,biomass of Fish & Shellfish Impinged on Intake Screens of Units 1,2 & 3 Exceeded 50 Kg Per 24-h Reporting Level.Coal Barge Exiting Intake Canal During Sampling May Have Been Partial Cause | /04X-0:on 780216 & 17,biomass of Fish & Shellfish Impinged on Intake Screens of Units 1,2 & 3 Exceeded 50 Kg Per 24-h Reporting Level.Coal Barge Exiting Intake Canal During Sampling May Have Been Partial Cause | |
| 05000302/LER-1978-008, Forwards LER 78-008/03L-0 | Forwards LER 78-008/03L-0 | |
| 05000302/LER-1978-008-04, /04T-0:on 780305,waste Gas Header Overpressurized & Blew Auxiliary Bldg Loop Seals During RCS Degassing. Caused by Personnel Error.Personnel & Supervisors Instructed | /04T-0:on 780305,waste Gas Header Overpressurized & Blew Auxiliary Bldg Loop Seals During RCS Degassing. Caused by Personnel Error.Personnel & Supervisors Instructed | |
| 05000302/LER-1978-008-03, /03L-0:on 780122 During Sampling,Reactor Coolant Dose Equivalent I-131 Found to Be 1.42 Uci Per Gram.Caused by Transient Spikes Following Trip & Leaking Fuel Pins.No Action Needed | /03L-0:on 780122 During Sampling,Reactor Coolant Dose Equivalent I-131 Found to Be 1.42 Uci Per Gram.Caused by Transient Spikes Following Trip & Leaking Fuel Pins.No Action Needed | |
| 05000302/LER-1978-009-03, /03L-0:on 780122 Control Rod Driveline Breaker a Failed to Trip During Reactor Protection Sys Functional Test SP-110.Caused by Undercurrent Relay Failure.Breaker Replaced | /03L-0:on 780122 Control Rod Driveline Breaker a Failed to Trip During Reactor Protection Sys Functional Test SP-110.Caused by Undercurrent Relay Failure.Breaker Replaced | |
| 05000302/LER-1978-009-04, /04X-0:on 780223-24,biomass of Fish & Shellfish Impinged on Intake Screens Exceeding 50 kg/24-h Reporting Level of Ets.Caused by Two Coal Barges Exiting & Coal Barge Entering Intake Canal During Sampling | /04X-0:on 780223-24,biomass of Fish & Shellfish Impinged on Intake Screens Exceeding 50 kg/24-h Reporting Level of Ets.Caused by Two Coal Barges Exiting & Coal Barge Entering Intake Canal During Sampling | |
| 05000302/LER-1978-009, Forwards LER 78-009/04x-0 | Forwards LER 78-009/04x-0 | |
| 05000302/LER-1978-010-03, /03L-0:on 780123,security Alarm Sounded an Unauthorized Entry Into Vital Area Through Unlocked Door. Locking Devices on Vital Area Doors Altered.Key Now Needed for Outside Opening.Doors Cannot Be Left Unlocked | /03L-0:on 780123,security Alarm Sounded an Unauthorized Entry Into Vital Area Through Unlocked Door. Locking Devices on Vital Area Doors Altered.Key Now Needed for Outside Opening.Doors Cannot Be Left Unlocked | |
| 05000302/LER-1978-010-04, /04X-0:on 780307-08,biomass of Fish & Shellfish Impinged on Intake Screens of Units 1,2 & 3 Exceeded 50 Kg Per 24-h Reporting Level.Oil Barge Entering Intake Canal During Sampling Period May Have Been Cause | /04X-0:on 780307-08,biomass of Fish & Shellfish Impinged on Intake Screens of Units 1,2 & 3 Exceeded 50 Kg Per 24-h Reporting Level.Oil Barge Entering Intake Canal During Sampling Period May Have Been Cause | |
| 05000302/LER-1978-010, Forwards LER 78-010/03L-0 | Forwards LER 78-010/03L-0 | |
| 05000302/LER-1978-011-04, /04X:on 780303-04,biomass of Fish & Shellfish Impinged on Intake Screens of Units 1,2, & 3 Exceeded 50 Kg Per 24-h Reporting Level.Cause Undetermined | /04X:on 780303-04,biomass of Fish & Shellfish Impinged on Intake Screens of Units 1,2, & 3 Exceeded 50 Kg Per 24-h Reporting Level.Cause Undetermined | |
| 05000302/LER-1978-011, Forwards LER 78-011/03L-0 | Forwards LER 78-011/03L-0 | |
| 05000302/LER-1978-011-03, /03L-0:on 780201,during Mode 3 Operation,Primary Containment Integrity Not Maintained When Nitrogen Valve NGV-81 Open for 3-h 42 Minutes.Caused by Oversight of Tech Spec 3.6.1 1 Requirements.Personnel Instructed | /03L-0:on 780201,during Mode 3 Operation,Primary Containment Integrity Not Maintained When Nitrogen Valve NGV-81 Open for 3-h 42 Minutes.Caused by Oversight of Tech Spec 3.6.1 1 Requirements.Personnel Instructed | |
| 05000302/LER-1978-012, Forwards LER 78-012/03L-0 | Forwards LER 78-012/03L-0 | |
| 05000302/LER-1978-012-03, /03L-0:on 780203,steamline Rupture Matrix Actuated During Heatup & Before Entry Into Operational Mode 2.Caused by Dead Band Shift of 600 Psig Pressure Switches MS-94,95- PS2.Switches Recalibr & Manual Bypass to Be Installed | /03L-0:on 780203,steamline Rupture Matrix Actuated During Heatup & Before Entry Into Operational Mode 2.Caused by Dead Band Shift of 600 Psig Pressure Switches MS-94,95- PS2.Switches Recalibr & Manual Bypass to Be Installed | |
| 05000302/LER-1978-012-04, /04X-0:on 780101-0331,improper Procedures Used in Environ Sample Analyses.Procedures Revised & More Efficient Counting Configurations & Overnight Count Times Being Tested.(Supplementary Info Sheet Only.) | /04X-0:on 780101-0331,improper Procedures Used in Environ Sample Analyses.Procedures Revised & More Efficient Counting Configurations & Overnight Count Times Being Tested.(Supplementary Info Sheet Only.) | |
| 05000302/LER-1978-013-03, /03L-0:on 780208,A & B Boric Acid Storage Tanks Found Inoperable While Performing Operability Check of Boron Injection Sources.Caused by Failure to Follow Procedures. Operators Instructed | /03L-0:on 780208,A & B Boric Acid Storage Tanks Found Inoperable While Performing Operability Check of Boron Injection Sources.Caused by Failure to Follow Procedures. Operators Instructed | |
| 05000302/LER-1978-013-04, /04X-0:June 1977-Mar 1978 Contractor Environ Sample Analyses Used Incorrect Procedures.Possibly Caused by Insufficient Sample Size & Count Times.Count Times Being Tested.(Supplementary Info Sheet Only.) | /04X-0:June 1977-Mar 1978 Contractor Environ Sample Analyses Used Incorrect Procedures.Possibly Caused by Insufficient Sample Size & Count Times.Count Times Being Tested.(Supplementary Info Sheet Only.) | |
| 05000302/LER-1978-013, Forwards LER 78-013/03L-0 | Forwards LER 78-013/03L-0 | |
| 05000302/LER-1978-014-04, /04X-0:on 780101-0502,environ Samples Not Analyzed W/Procedures Providing LLDs Equal to or Less than ETS Requirements.Caused by Inadequate Techniques &/Or Equipment. Normal Samples Taken.(Supplementary Info Sheet Only.) | /04X-0:on 780101-0502,environ Samples Not Analyzed W/Procedures Providing LLDs Equal to or Less than ETS Requirements.Caused by Inadequate Techniques &/Or Equipment. Normal Samples Taken.(Supplementary Info Sheet Only.) | |
| 05000302/LER-1978-014-03, /03L-0:on 780210,chemical Addition Valves CAV 1 & 2 Failed to Close on Completion of Pressurizer Steam Space Sampling.Caused by Incorrect Torque Switch Setting of Valve CAV-1.Operability restored.CAV-2 Corrective Action Pend | /03L-0:on 780210,chemical Addition Valves CAV 1 & 2 Failed to Close on Completion of Pressurizer Steam Space Sampling.Caused by Incorrect Torque Switch Setting of Valve CAV-1.Operability restored.CAV-2 Corrective Action Pending | |
| 05000302/LER-1978-014, Forwards LER 78-014/03L-0 | Forwards LER 78-014/03L-0 | |
| 05000302/LER-1978-015-04, /04T-0:on 780511,20 Uci Radioactive Liquid Released During Spent Resin Transfer to Vendor Vehicle. Caused by Line Rupture.Transfer Terminated & Radioactive Protection Measures Implemented.Corrective Action Pending | /04T-0:on 780511,20 Uci Radioactive Liquid Released During Spent Resin Transfer to Vendor Vehicle. Caused by Line Rupture.Transfer Terminated & Radioactive Protection Measures Implemented.Corrective Action Pending | |
| 05000302/LER-1978-015-03, /03L-0:on 780215,during Reactor Trip Chemical/ Radiation Sampling Revealed Reactor Coolant Dose Equivalent Exceeded Limits.Caused by Expected Transient Spikes Following Trip & Leaking Fuel Pins.No Action Needed | /03L-0:on 780215,during Reactor Trip Chemical/ Radiation Sampling Revealed Reactor Coolant Dose Equivalent Exceeded Limits.Caused by Expected Transient Spikes Following Trip & Leaking Fuel Pins.No Action Needed | |
| 05000302/LER-1978-015, Forwards LER 78-015/04T-1.LER 78-015/04T-0 Encl | Forwards LER 78-015/04T-1.LER 78-015/04T-0 Encl | |
| 05000302/LER-1978-016, Forwards LER 78-016/01T-0 | Forwards LER 78-016/01T-0 | |
| 05000302/LER-1978-016-01, /01T-0:on 780310,in Mode 5 Operation,Unplanned Reactivity Insertion of 4.3% of Delta K/K.Caused by Dilution of RCS Upon Draining.Rcs Boron Sampling Surveillance Increased | /01T-0:on 780310,in Mode 5 Operation,Unplanned Reactivity Insertion of 4.3% of Delta K/K.Caused by Dilution of RCS Upon Draining.Rcs Boron Sampling Surveillance Increased | |
| 05000302/LER-1978-016-04, /04L-0 (Supplementary Info Sheet):On 780404, Sample Not Obtained from Test Well 5 for Months of Apr & May.Caused by Well Being Inadvertently Covered by Const Debris.Well to Be Available for June Sampling | /04L-0 (Supplementary Info Sheet):On 780404, Sample Not Obtained from Test Well 5 for Months of Apr & May.Caused by Well Being Inadvertently Covered by Const Debris.Well to Be Available for June Sampling | |
| 05000302/LER-1978-017-01, /01T-0:on 780306,17 Loose Parts Identified as Coupling & Spider Assembly of BPR- B-47,discovered in B once-through Steam Generator.Caused by Assembly Failure. Corrective Action to Be Determined | /01T-0:on 780306,17 Loose Parts Identified as Coupling & Spider Assembly of BPR- B-47,discovered in B once-through Steam Generator.Caused by Assembly Failure. Corrective Action to Be Determined | |
| 05000302/LER-1978-017, Forwards LER 78-017/01T-0 | Forwards LER 78-017/01T-0 | |