ML19319C892

From kanterella
Jump to navigation Jump to search
Forwards LER 78-021/03L-0
Date released: 11/29/2019 Download: ML19319C892


LER 78-021/03L-0:on 780405,fire Svc Valve 240 Declared Inoperable.Caused by Moisture Buildup in Control Circuit Box Shorting Circuit Board.Control Circuit Board Replaced & Valve Operability Restored
ML19319C897
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/27/1978
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19319C897 (2)
Forwards LER 78-021/03L-0
ML19319C891
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/02/1978
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19319C891 (1)