| Site: | Arkansas Nuclear |
| Issue date: | 10/04/1977 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Cavanuagh W ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML19317H096 | List: |
| References | |
| NUDOCS 8004140610 | |
| Download: ML19317H119 (2) | |
See also: IR 05000313/1977014
Text
_
_
. _ _
e
.
.
_.
,
+
0
NUCLEAR REGU T RY COMMIS$10N
$
f ,,o
REGION IV
611 RYAN Pt.AZA DRIVE. SUITE 1000
l
,[ f
,
r[ t
..
g
q CM,f
October 4, 1977
....
Docket Nos. 50-313
50-368
Arkansas Power and Light Company
ATTN: Mr. William Cavanaugh III
Executive Director of Generation
and Construction
P. O. Box 551
'
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Ms. J. M. Dawson, Mr. M. W.
Dickerson and J. E. Gagliardo of this office on September 12-15, 1977,
of activities authorized by NRC Operating License No. OPR-51 and
NRC Construction Pennit No. CPPR-89 for the Arkansas Nuclear One,
Units 1 and 2, and to the discussion of the findings by the inspectors
with members of your staff at the conclusion of the inspection.
Areas examined during the inspection include:
(1) review of test
program status; (2). fuel receipt and storage; (3) verification and
evaluation of test results; (4) review of Unit 2 jumper and bypass
log; (5) Unit 2 startup test program; (6) ventilation system power
'
supplies; and (7) training and qualifications of crane and fuel
handling machine operators. Within these areas, the inspection consisted
of selective examination of procadures and representative records, inter-
views with personnel, and observations by the inspectors.
We have also examined actions you have taken with regard to previously
identified enforcement matters and unresolved items.
The status of
these items is identified in paragraph 3 of the enclosed report.
Two
new unresolved items are identified in paragraph 8 of the enclosed
report.
During this inspection it was found that certain of your activities
were not conducted in full compliance with NRC requirements, as set forth
in the Notice of Violation, enclo:ed herewith as Enclosure (1).
This
notice is sent to you pursuant to the provisions of Section 2.201 of
!
,
80041406(O
'
.
_.
- .
-
.
.
.
-
V
Arkansas Power & Light Co.
-2-
October 4, 1977
the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office,
within 20 days of your receipt of this notice, a written statement
or explanation in reply including:
(1) corrective steps which have
been taken by you, and the results achieved; (2) corrective steps
which will be taken to avoid further noncompliance; and (3) the date
when full compliance will be achieved.
In accordance with Section 2.790 cf the flRC's " Rules of practice," Part
2 Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the flRC's Public Document
Room.
If the report contains any information that you believe to be
proprietary, it is necessary that you submit a written application to
this office within 20 days of the date of this letter, requesting that
such information be withheld from public disclosure. The application
must include a full statement of the reasons why it is claimed that the
information is proprietary. The application should be prepared so that
any proprietary information identified is contained in an enclosure to
the application, since the application without the enclosure will also
be placed in the Public Document Room.
If we do not hear from you in
w
this regard within the specified period, the renort will be placed in
the Public Document Roon.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
,
Sincerely,
hb Wkt$a
G. L. Madsen, Chief,
Reactor Operations and
Huclear Support Branch
Enclosures:
1.
2.
.IE Inspection Report Nos. 50-313/77-14 &
50-368/77-20
-
,
l