ML19316A612

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Jan 1975
ML19316A612
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/07/1975
From:
DUKE POWER CO.
To:
Shared Package
ML19316A599 List:
References
NUDOCS 8001130124
Download: ML19316A612 (2)


Text

-

O oco ee u=1t 1

< Ni1 March 7, 1975 D ATE DOCKET NO.

OPERATING STATUS 1.

REPORTING PERIOD January 1, 1975 Tl! ROUGH Januarv 31. 1975 HOURS IN REPORTING PERIOD:

744 2.

CURRENTLY AUTHORIZED PO%ER LE\\ EL (V%:hi 2368 M AN DEPEND 41sLE CAI ACITY (Mwe. NET. 871 3.

LO%IST POWER LEVEL TO %HICH SPLCIFICALL) RESTRICTED (It ANY> (M%e. NET)

Nw 4.

REASONS FOR RESTRICTION (IF AN) s:

THIS CL MUL ATIVE REPORTING PI RIOD YR TO DATE TO D ATE 0

0 9800.5 5.

IiOURS REACTOR WAS CRITICAL.

0 0

0 6.

RE ACTOR RESERVE SHUTDOWN HOL RS 0

0 8254.3 7.

HOURS GENER ATOR ON LINE.

0 0

0 8.

UNIT RESERVE SHUTDOWN HOURS 9.

GROSS THERMAL ENERGY 0

0 18237510 GENER ATED (MWH) 10.

GROSS ELECTRICAL ENERGY 0

0 6318700 GENER ATED (Muu, 11.

NET ELECTRICAL LNERGY GENER ATED

-6039

-6039 5946980 ggwn3 0

0 72.3 12.

REACTOR AVAILABILITY F ACTOR (1, 0

0 60.9 13.

UNIT AVAILABILITY F ACTOR (2) 0 0

50.4 14.

UNIT CAPACITY F ACTOR (3, 100 100 16.5 15.

UNIT FORCED OUTAGE RATE (4) 16.

SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE.D ATE. AND DUR ATION OF ; ACH):

17.

IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE 01 STARTUP:

18.

UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPERATION) RE PORT THE FOLLO% LNG:

DATE LAST D4TE FORECAST ACH'!EVED INITI AL CRITIC ALITY INITIAL ELECTRIC AL POWER GENER ATION COMMERCIAL OPE R ATION (1)

REACTOR AVAILABILITY FACTOR =

X 100 HOURS IN REPORTING PI RIOD X 100 (2)

UNIT AVAILABILITY F ACTOR

=

HOURS IN REPORTING Pt RIOD NFT ELI CTRIC AL PO%TR G NE R ATE D (3)

UNIT CAPACITY FACTOR

=

(4)

UNIT FORCED OUTAGl: R ATE X 100

=

8 0 01 13 0 /f /.;g" M-e

DOCKET NO.

50-269 UNIT SHUTDOWNS UNil NAMli Oconee Unit 1 DA l~li 3/7/75 REPORT MONTil._. January,1975 TYPE METHOD OF l

F FORCED DURATION SHUTTING DOWN NO.

DATE S SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS 17 741224 F

744.0 A

1 Reactor coolant pump seal repairs (1) REASON (2) METilOD A -EQUIPMENT F AILURE (EXPLAIN) 1-MANI!AL B-MAINT.OR TEST.

2-MANUAL C-RL1 ULLING SCR AM D-REGULAlORY RESTRICTION 3-AUTOM AllC E-OPER AlOR TRAINING AND SCRAM LICI NSE F.XAMtHATION F-ADMINISTR AllVE G-OPL R AllON AL FRROR tt XPI AIN)

II-Oilli R (E XPLAIN)

SUMMARY

- - - - -