ML19316A601

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1975
ML19316A601
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/07/1975
From:
DUKE POWER CO.
To:
Shared Package
ML19316A599 List:
References
NUDOCS 8001130112
Download: ML19316A601 (3)


Text

.

_~

Oconee Unit 1 UNIT DATE March 7, 1975 50-269 DOCKET NO.

OPERATING STATUS 1.

REPORTING PERIOD.

February 1, 1975 TIIROUGH February 28, 1975 HOURS IN REPORTING PERIOD-671.0 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWtni 2568 MAN. DEPENDAliLE CAI ACITY 61%e. NET. 871 3.

LOWEST POWER LEVEL TO WHICH SPI CIFICALL) RESTRICTED (11 ANY) Ol%c. NET)

Nnne 4.

REASONS FOR RESTRICTION (IF ANYt.

THIS CL MULATIVE REPORTING PI RIOD YR IO D ATE TO D ATE 5.

IlOURS RE ACTOR W AS CRITIC AL.

74.8 74.8 9875.4 6.

REACTOR RESERVE SHUTDOWN HOL RS 0

Q n

7.

HOURS GENERATOR ON LINE.

0 0

8254.3 8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

9.

GROSS THERM AL ENERGY GENER ATED (MWH) 0 0

18237510 10.

GROSS ELECTRICAL ENERGY GENER ATED (MWil) 0 0

6318700 NET ELECTRICAL LNERGY GENER ATED

(-7603)

(-13642) 5939377 (wwuj 11.5 5.3 69.4 12.

REACTOR AVAILABILITY F ACTOR (1) 0 0

58.0 13.

UNIT AV AILABILITY I ACTOR (2) 0 0

47.9 14.

UNIT CAPACITY F ACTOR (3, 100 100 21.8 15 UNIT FORCED OUTAGE R ATE (4).

16.

SHUTDOWNS SCHEDULED TO BLGIN IN NEXT 6 MONTHS (STATE TYPE.D ATE. AND DUR ATION OF E ACib.

17.

IF SHUT DOWN AT END OF REPORT PERIOD. ESTIM ATLD DATE 01 STARTUP; March 10, 1975 18.

UNITS IN TEST S TATUS (PRIOR TO COMMERCIAL OPER ATION) R t PORT Tile FOLLOwlNG:

DATE LAST DkTE FORECAST AClf!EVED INITI AL CRITICALITY INITIAL ELECTRIC AL POWER GENEk ATION COMMERCIAL OPERATION (1) REACTOR AVAILABILITY FACTOR =

X 100 X100 (2)

UNIT AVAILABILITY F ACTOR

=

HOURS IN RLPORTING Pi RIOD NFT ELI CTRIC AL POWF R GF NE R ATF D (3)

UNIT CAPACITY FACTOR

=

MAX. DLi'ENDAttLL CAPAt'IT) f MWe NLT) A HOURb IN REPOR flNG PtKIOD (4)

UNIT FORCED OUTAGE R ATE

~

+ i ORCE D OUT AGE HOURS O'S 8oo1 mo //2 gassujEiiiippsp=-

50-269 l

DOCKET NO.

l UNIT oconee tw e i f

DATE 3/7/75 I

I l

AVERAGE DAILY UNIT POWER LEVEL MONTH February, 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 0 37 o

1 0

0 18 2

0 3

0 19 0

4 0

3 0

0 5

21 0

0 22 6

0 0

23 7

0 0

24 8

0 0

25 9

0 0

26 10 0

0 27 11 0

0 28 12 0

29 13 14 0

30 0

31 15 0

16 DAILY UNIT POWER LEVEL FORM INS ~TRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 1007c line (or the restricted power level hne). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

D CKET NO. _50-269 Oconee Unit 1 UNIT SHUTDOWNS UNir NAMii DATli March 7, 1975 RIIPORT MONTil February, 1975 TYPE METHOD OF F. FORCED DURATION SHUTTING DOWN NO.

DATE S SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS 1

17 741224 S

671.0 A

1 Reactor coolant pump seal maintenance (1) REASON (2) METilOD A EQUIPMENT F AILURE IEXPL AIN) 1-M At'tf Al B - M AINT. OR TEST.

2-MANUAL C-RLI ULLING SCR AM N

D-RLGULA10RY RESTRK.7 ION 3 - AUTOM ATIC E-OFFR ATOR TR AINING AND SCRAM Liff NSL EXAMINATION l'- A DMINIST R AllVE G-OPLR A IlON AL I RROR ILXPLAIN) 11-01111 R IEXPLAIN)

SUMMARY

]