ML19316A610
| ML19316A610 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 03/07/1975 |
| From: | DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML19316A599 | List: |
| References | |
| NUDOCS 8001130122 | |
| Download: ML19316A610 (2) | |
Text
-.
Ocon n 1 UNIT 3/7/73 DATE 50-269 DOCKET NO.
OPERATING STATUS 1.
REPORTING PERIOD:
Decemier 1, 1974 THROUGH December 31. 1974 HOURS IN REPORTING PERIOD:
744 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWthe 2568 MAX. DEPENDABLE CAI ACITY (MWe. NET, A71 None 3.
LOWEST POWER LEVEL TO WHICH SPECIFICALL) RESTRICTED (lb ANY> tMWe. NET).
4 REASONS FOR RESTRICTION (IF ANYl:
THIS CUMULATIVE REPORTING Pl RIOD YR TO DATE TO DATE 0
5446.7 9800.5 5.
HOURS REACTOR WAS CRITICAL.
0 0
0 6.
REACTOR RESERVE SHUTDOWN HOLRS 0
5265.2 8254.3 7.
HOURS GENERATOR Oh OlNE.
0 0
0 8
UNIT RESERVE SHUTDOWN HOURS,
5 GRGSS THERMAL ENERGY 0
12226629 18237510 GENERATED (MWH) 10.
GROSS ELECTRICAL ENERGY 0
4230112 6318700 GENERATED (MWil) 11.
NET ELECTRICAL ENERGY GENER ATED
-4547 3993941 5953019 (MWH) 0 62.2 76.5 12.
REACTOR AVAILABILITY F ACTOR (1) 13.
UNIT AVAILABILITY F ACTOR (2) 60 I 64.4 O
0 52.4 53.3 14.
UNIT CAPACITY F ACTOR (3 p 100 10.1 9.7 15.
UNIT FORCED OUTAGE RATE (4).
16.
SHUTDOWNS SCilEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE.DATE. AND DUR ATION OF EACH):
17.
IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE Oi STARTCP.
18.
UNITS IN TEST STATLS (PRIOR TO COMMERCIAL OPERATION) Rt PORT Tile FOLLOWING:
DATE LAST DkTE FORECAST AClilEVED INITIAL CRITICALITY INITIAL ELECTRIC AL POWER GENER ATION COM MERCIAL OPL RATION (1)
REACTOR AVAILABILITY FACTOR =
X l00 0
(2)
UNIT AVAILABILITY F ACTOR
=
RS PORTING Pi. D NFT Elf ( TRIC \\L POwFR <;F NER ATFD (3)
UNITCAPACITY FACTOR p
=
FORCED OUTAGE liOURS (4)
UNIT FORCED OUTAGl: RATE HOURS GLNERATOR ON LINE + FORCFD OUTAGE HOURS i.8001130/7 @
/
D CKET NO.
50-269 UNIT SHUTDOWNS UNI l' NAMli Oconee Unit-1 I)ATl; 3/7/75 REPORT MONTil _ December,1974 TYPE METHOD OT F FORCED DURATION SHUTTING DOWN NO DATE S-SCtIEDULED (HOURS)
REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS / COMMENTS 16 741019 S
552.0 C
1 17 741224 F
192 A
1 Reactor coolant pump neal repairs (1) REASON (2) METIIOD A -EQUIPMFNT I AILURF (EXPLAIN) 1-M ANilA L B-MAINT. OR TEST.
2-MANUAL C-RLl'ULLING SCRAM
}
D-REGULA10RY RESTRICilON 3-AUTOM ATIC L-OPFRA10R TRAINING AND SCRAM LICI NSE EXAMINATION F-A DMINIST R A1!VE G-OPER AllONAL ERROR (LXPLAIN)
II-OlllLR (EXPl.AIN)
SUMMARY
m
-.