Unit 3
- t. NIT O
March 7, 1975 DATE 50-287 DOCKET NO.
OPERATING STATUS 1.
REPORTING PERIOD.
Februa ry 1, 1975 TiiROUGH Februarv 28. 1975 HOURS IN REPORTING PERIOD:
671.0 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWthe 2568 MAL DEPENDAHLE CAI ACITY (M%e NET. R71 None 3.
LOWEST POWER LEVEL TO WHICH SPLCIFICALL) RESTRICTED (il ANY (MWe-NET):
4.
REASONS FOR RESTRICTION (IF ANY).
THIS CL MULATIVE REPORTING Pl RIOD YR TO DATE TO D ATE 572.4 1061.7 1245.6 HOURS R EACTOR WAS CRITICAL.
0 0
0 6.
REACTOR RESERVE SHUTDOWN HOLRS 564.1 1025.2 1207.9 7.
HOURS GENERATOR ON LINE.
0 0
0 8.
UNIT RESERVE SHUTDOWN HOURS..
9.
GROSS THERMAL ENERGY 1139692 2222642 2667292 GENER ATED (MWH) 10.
GROSS ELECTRICAL ENERGY 395310 774870 923784 GENE R ATED (MWH, 11.
NET ELECTRICAL ENERGY GENER ATED 376752 737007 878143 (MWH) 85.3 75.0 69.2 12.
REACTOR AVAILABILITY F ACTOR (1) 84.1 72.5 67.1 13.
UNIT AVAILABILITY I ACTOR (2) 64.5 59.8 56.0 14.
UNIT CAPACITY F ACTOR (36 15.9 27.6 32.9 15.
UNIT l'ORCED OUTAGE RATE (4,.
16.
SHUTDOWNS SCilEDULED TO BEGIN IN NEXT 6 MON THS (STATE TYPE. D ATE. AND DUR ATION OF EACHN 17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIM ATED DATE 01 STARTUP:
18.
UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPER ATION) R E PORT THE FOLLO%ING:
DATE L i.ST D4TE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION (1)
REACTOR AVAILABILITY F ACTOR X 100 O
X 100 (2)
UNIT AVAILABILITY F ACTOR
=
p (3)
UNIT CAPACITY FACTOR
=
MAX. DtPENDABLt.CAPACIT) f MWe-NET) X HOURh IN REPOR flNG PERIOD (4)
UNIT FORCED OUTAGl'. R ATE HOURS GL OR N LINE + I ORCED OUT4GE HOURS 8 0 01130 / k q
l
r 50-287 DOCKET NO.
UNIT oconee Unit _3 DATE _3/7/75 AVERAGE DAILY UNIT POWER LEVEL MONTi{
Februarv. 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 616 1
859 17 621 857 18 2
629 3
857 19 626 787 20 4
619 5
21 617 6
22 7
23 595 623 8
24 623 220 9
25 624
' 490 26 10 628 683 27 11 627 818 28 12 13 809 29 697 30 14 611 31 15 617 16 DAILY UNrr POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 100'To line (or the restricted power level hnet in such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
DdCKET NO.
50-287 UNIT SHUTDOWNS UNII MAMli Oconee Unit 3-l' ATE March 7, 1975 REPORT MONTil February, 1975 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.
DATE S-SCHEDULED (HOURS)
REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS / COMMENTS
-3 1
750204 F
106.9 A
1 Feedwater leak in check valve hinge pin cover (1) REASON (2) METilOt>
A EQUIPMENT F AILURE (EXPLAIN) 1-MANUAt B-M AINT. OR TEST.
2-MANUA C-RLI UELING SCR AM D-REGULA10RY RFSTRICTION 3-AUIOM ATIC E-OPE R ATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINIST R AllVE G-OPE RAllONAL FRROR l
(EXPLAIN)
II - 01111.R (EXPl.AIN)
)
SUMMARY
l i
-