4/9/75 DATE DOCKET NO. 50-287 I
OPERATING STATUS 1.
REPORTING PERIOD:
February 1, 1975 Tl! ROUGH _ Februarv 28. 1975 HOURS IN REPORTING PERIOD:
671.0 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWthe 2568 M A X. DLPENDAllLE cal'ACITY (MWe. NETS R71 3.
LOWEST POWER LEVEL TO WHICH SPECll'ICALL*' RESTRICTED (11' ANY)IMWe NET):. None 4.
REASONS FOR RESTRICTION (IF ANY):
THIS CL'MULATIVE REPORTING PI RIOD YR TO DATE TO DATE 5.
HOURS REACTOR WAS CRITICAL.
572.4 1061.7 1245.6 6.
REACTOR RESERVE SHUTDOWN HOURS O_
0 0
7.
140URS C"NERATOR ON LINE.
564.1 1025.2 1207.9 8.
UNIT RESERVE SHUTDOWN HOURS...
0 0
0 9.
GROSS THERMAL ENERGY GENERATED (MWH) 1139692 2222642 2667292 10.
GROSS ELECTRICAL ENERGY
~
395310^
774870-923784 GENER ATED (MWH) 11.
NET ELECTRICAL ENERGY GENER ATED 376752 737007 878143 (MWH) 12.
REACTOR AVAILABILITY F ACTOR (1) 85.3 75.0
_69.2 13.
UNIT AVAILABILITY F ACTOR (2) 84.1 72.5 67.1 14.
UNIT CAPACITY F ACTOR (b 64.5 59.8 56.0 15.
UNIT FORCED OUTAGE RATE (4)...
15.9
~~
'.9 % -
8.1 16.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE 1YPE.DATE. AND DUR ATION OF EACH):
17.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATLD DATE 01 STARTUP:
18.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) Rt PORT Tile FOLLOWING:
DATE LAST DkTE FORECAST ACII!EVED INITIALCRIT* ALITY INITIAL ELECTRICAL POWER GENEllATION COMMERCIAL OPERATION
^
(1)
REALTOR AVAILABILITY FACTOR *
^
X 100 HOURS lh REPORTING PI f(IOD (2)
UNIT AVAILABILITY l ACTOR X 100
=
NFT EllTTRICAL POWFR i*FNERATFD
('3)
UNITCAPACITY FACTOR
=
MAX. DLPENDAULL CAPArlIY IMWe.hET) X HOURS IN RLFORflNG PERIOD FORCED OUTAC.E llOl'RS (4) UNIT FORCED OUTAGE R ATE 5
HOURS GENERATOR ON LINE + l'ORLED OUTAGE HOURS
-+