ML19316A592

From kanterella
Jump to navigation Jump to search
Corrected Page to Monthly Operating Rept for Feb 1975
ML19316A592
Person / Time
Site: Oconee 
Issue date: 04/09/1975
From:
DUKE POWER CO.
To:
Shared Package
ML19316A579 List:
References
NUDOCS 8001130100
Download: ML19316A592 (1)


Text

.o l*.

.~

Oconte Unit 1 t, NIT U

4/9/75 DATE

~

DOCKET NO.

I OPERATING STATUS 1.

REPORTING PERIOD:

February 1, 1975 TilROUGa February 28, 1975 HOURS IN REPORTING PERIOD:

671.0 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWtn. 2568 MA A. Dt.PE.NL)AHLE cal'ACITY (M%e NET, 871 3.

LOWEST POWER LEVEL TO WHICH SPLCle'ICALL) RESTRICTED (11 ANY)1MWc NET):

Nnno 1

4.

REASONS FOR RESTRICTION (IF ANY).

i i

THIS CUMULATIVE j

REPORTING P1 RIOD YR TO DATE TO DATE 74.8 74.8 9875.4 S.

IlOURS REACTOR WAS CRITICAL....

6.

REACTOR RESERVE SilUTDOWN HOURS 0

0 0

7.

HOURS GENER ATOR ON LINE.

0 0

8254.3 8.

UNIT RESERVE SHUTDOWN HOURS.

0 0

0 9.

GROSS THERM AL ENERGY GENERATED (MWH) 0

>" 0 18237510 10.

GROSS ELECTRICAL ENERGY GENER ATED IMWH) 0 0'

6318700 11.

NET ELECTRICAL ENERGY GENER ATED

(-7603)

(-13642) 5939377 (MWH; 11.5 5.3 69.4 12.

REACTOR AVAILABILITY F ACTOR (1).

0 0

58.0 13.

UNIT AVAILABILITY t ACTOR (2) 0 0

47.9 14.

UNIT CAPACITY F ACTOR O) 100 100 23.7 15.

UNIT l'ORCED OUTAGE RATE (4) 16.

SHUTDOWNS SCllEDULED TO BEGIN IN NEXT 6 MONTHS (STATE 1YPE.DATE. AND DURATION OF EACH):

17.

IF SHUT DOWN AT END OF REPORT PERIOD. ESTIM ATED DATE Ol ST ARTUP:

March 10, 1975 i

18.

UNITS IN TEST STATUS (PRIOR TO COMMLRCI AL OPERATION) Rt PORT TIIE T OLLOWING:

DATE LAST D4TE FORECAST' ACH'IEVED INITI AL CRITICALITY l

INITIAL ELEGRICAL POWER GENERATION COMMERCI AL OPER ATION

~

^

^'

0)

REACTOR AVAILABILITY FACTOR

  • X 100 HOURS Gr.NER ATOR ON LINr X 100 (2)

UNIT AVAILABILITY F ACTOR

=

p p

NFT Ell:CTRICAL POWFR alt Nt RATED (3)

UNIT CAPACITY FACTOR

=-

FORCED OUTAGE HOURS (4)

UNIT FORCED OUTACT. R ATE HOURS Gr.NERA TOR ON LINE + 1'ORCt D OCTAGE HOURS I

/O O 4001130 M