ML19316A592
| ML19316A592 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 04/09/1975 |
| From: | DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML19316A579 | List: |
| References | |
| NUDOCS 8001130100 | |
| Download: ML19316A592 (1) | |
Text
.o l*.
.~
Oconte Unit 1 t, NIT U
4/9/75 DATE
~
DOCKET NO.
I OPERATING STATUS 1.
REPORTING PERIOD:
February 1, 1975 TilROUGa February 28, 1975 HOURS IN REPORTING PERIOD:
671.0 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWtn. 2568 MA A. Dt.PE.NL)AHLE cal'ACITY (M%e NET, 871 3.
LOWEST POWER LEVEL TO WHICH SPLCle'ICALL) RESTRICTED (11 ANY)1MWc NET):
Nnno 1
4.
REASONS FOR RESTRICTION (IF ANY).
i i
THIS CUMULATIVE j
REPORTING P1 RIOD YR TO DATE TO DATE 74.8 74.8 9875.4 S.
IlOURS REACTOR WAS CRITICAL....
6.
REACTOR RESERVE SilUTDOWN HOURS 0
0 0
7.
HOURS GENER ATOR ON LINE.
0 0
8254.3 8.
UNIT RESERVE SHUTDOWN HOURS.
0 0
0 9.
GROSS THERM AL ENERGY GENERATED (MWH) 0
>" 0 18237510 10.
GROSS ELECTRICAL ENERGY GENER ATED IMWH) 0 0'
6318700 11.
NET ELECTRICAL ENERGY GENER ATED
(-7603)
(-13642) 5939377 (MWH; 11.5 5.3 69.4 12.
REACTOR AVAILABILITY F ACTOR (1).
0 0
58.0 13.
UNIT AVAILABILITY t ACTOR (2) 0 0
47.9 14.
UNIT CAPACITY F ACTOR O) 100 100 23.7 15.
UNIT l'ORCED OUTAGE RATE (4) 16.
SHUTDOWNS SCllEDULED TO BEGIN IN NEXT 6 MONTHS (STATE 1YPE.DATE. AND DURATION OF EACH):
17.
IF SHUT DOWN AT END OF REPORT PERIOD. ESTIM ATED DATE Ol ST ARTUP:
March 10, 1975 i
18.
UNITS IN TEST STATUS (PRIOR TO COMMLRCI AL OPERATION) Rt PORT TIIE T OLLOWING:
DATE LAST D4TE FORECAST' ACH'IEVED INITI AL CRITICALITY l
INITIAL ELEGRICAL POWER GENERATION COMMERCI AL OPER ATION
~
^
^'
0)
REACTOR AVAILABILITY FACTOR
- X 100 HOURS Gr.NER ATOR ON LINr X 100 (2)
UNIT AVAILABILITY F ACTOR
=
p p
NFT Ell:CTRICAL POWFR alt Nt RATED (3)
UNIT CAPACITY FACTOR
=-
FORCED OUTAGE HOURS (4)
UNIT FORCED OUTACT. R ATE HOURS Gr.NERA TOR ON LINE + 1'ORCt D OCTAGE HOURS I
/O O 4001130 M