ML19316A578

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Mar 1975 & Corrected Pages to Feb 1975 Monthly Operating Repts for Units 1 & 3, & Jan 1975 Pages for Unit 3
ML19316A578
Person / Time
Site: Oconee  
Issue date: 04/10/1975
From: Thies A
DUKE POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19316A579 List:
References
NUDOCS 8001130084
Download: ML19316A578 (3)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

MOICHIT-EFORTS (FOR GRAY BOOK PREPAR/C

')

NRC DISTRIBUTION FOR PART 50 DOCKET MATERI AL (TEMPORARY FORM)

CONTROL NO: 3994 FILE: MONTHLY REPORT FILE F ROMpuhe Power Co.

DATE OF DOC DATE REC'D LTR TWX RPT OTHER Charlotte, N.C.

A.C. Thics 4-10-75 4-12-75 m

TO:

ORIG CC OTHER SENT AEC PDR xm office of Management Info 1-signec SENT LOCAL PDR

, x:

CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

xm 1

270, and 278 DESCRIPTION:

ENCLOSURES:

Ltr trans the following:

Monthly Report for March, 1975 Plant & Component Operability & Availability This Report to be used in preparing Gray Book by Plans & Operations.

KUdBER OF COPIES REC'D:

1 PLANT NAME:

Oconee 1thru 3 FOR ACTION /INFORMATION 4-14-75 53 DUTLER (L)

SCHWENCER (L) ZIEM ANN (L)

REG AN (E)

W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L)

STOLZ (L)

DICKER (E)

LE AR (L)

"' COpit:

"!/ IOp!:

V!/ IOp;a*

1.A! / T'O"'Ir*?

PAR R (L)

VASSALLO (L)

KNIGHTON (E)

SPELS W/ Copies

/ Copies W/ Copies W/ Copies

'Q KNIEL (L)

PURPLE (L)

YOUNGBLOOD (E)f.aumustulemme N W/ Copies W/[ Copies W/ Copies W4fCopies INTERNAL DISTRIBUTION M6 H t+ J TECH REVIEW DENTON LIC ASST A/T IN D p n riv r u ri SCHROEDER GRIMES R. DIGGS (L)

BRAlTMAN OGC, ROOM P 506A MACCARY GAMMILL H. GE ARIN (L)

SALTZMAN GOSSICK/STAF F KNIGHT KASTNER E. GOULBOURNE (L)

MELTZ CASE PAWLICKl BALLARD P. KREUTZER (E)

GIAMBUSSO SHAO SPANG LER J. LEE (L)

PLANS BOYD STELLO M. M AIG RET (L)

- MCDON A LD MOORE (L)

HOUSTON

_ ENVI RO S. REED (E)

,,,,, CH APM AN DEYOUNG (L)

NOVAK MU LLE R ERVICE (L)

DUBE (Ltr)

SKOVHOLT (L)

ROSS DICKER

. SHEPPARD (L)

E. COUPE GOLLER (L) (Ltr)

IPPOLITO KNIGHTON M. SLATER (E)

PETERSON P. CO LLINS TEDESCO YOUNGBLOOD H. SMITH (L)

HARTFIELD (2)

DENISE LONG REGAN S. TEETS (L)

KLECKER REG OPR LAIN AS PROJECT LDR G. WILLI AMS (E)

EISENHUT FILE & REGION (2)

BENAROYA V. WILSON (L)

WIGGINTON T.R. WI LSON VOLLMER HAR LESS R. INGRAM (L)

STEELE k[

v EXTERNAL DISTRIBUTION fl - LOCAL PDR Walhalla, S.C.

f.1 - TIC (ABERNATHY) (1)(2)(10)- NATIONAL LABS 1 - PDR SAN /LA/NY 1

NSIC (BUCHAN O !)

1 - W. PENNINGTON, Rm E 201 GT 1 - BROOKHAVEN NAT LAB f

ASLB 1 - CONSU LTANTS 1 - G. ULRIKSON, ORN L 1-1 - Newton Andcrson NEWMARK/BLUME/AGBABIAN 1 - AGMED (RUTH GUSSMAN)

- ACRS HOLDING /SENT Rm B-127 GT 1 - J. D. RUNKLE'S, Rm E 201 6001130Ok g

V r

DUKE Powrn COMPANY Powza Bert.onto 4aa Sourn Cauncu Sruzzr, CnAntarrr,N. C. asson A

C. THIES P. o. Box a178

$rmson vict ParssormT 1

PaooucTsom ano Tnansasission 1

i April 10, 1975

/

Director Office of Management Information and Progcam Control U. S. Nuclear Regulatory Commission Washington, D. C.

205SS Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287

Dear Sir:

Please find attached information concerning the performance of the Oconee Nuclear Station for the month of March, 1975.

In the review of data submitted in our operating status reports for 1974, several errors have been identified in the classification of unit shutdowns, i.e., forced or scheduled. These errors are summarized below:

1.

Oconee Unit 1 shutdown #1 which began 740101 is presently shown as a scheduled shutdown. The first 72.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> are, in fact, scheduled; however, the remaining hours were forced outage hours.

2.

Oconee Unit 3 shutdown #1 which began 741223 was shown and is a scheduled shutdown; however, the operating status sheet calculations were performed considering the outage to be forced.

The continued shutdown in January, 1975 is also considered scheduled.

3.

Oconee Unit 1 refueling outage which began 741019 should be considered a scheduled outage until 741227 at which time the refueling was completed. The outage from 741227 ti. 750311 was a forced outage for maintenance of reactor coolant pump seals.

The errors in classification of unit shutdowns resulted in incorrect unit forced outage rates for individual months, year to date, and cumulative to date columns. A tabulation of the correct figures as of December 31, 1974 is provided below:

3?e4

Director Office of Management Information and Program Control Page 2 April 10, 1975 1974 Cumulative Year to Date to Date l

Oconee Unit 1 13.7%

12.0%

Oconee Unit 2 0.0%

0.0%

The revised figures of unit forced outage rate for January and February, 1975 are provided on the attached revised data sheets.

Very truly yours, A. C. Thies ACT:vr Attachments cc:

Mr. Norman C. Moseley