ML19316A587

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1975
ML19316A587
Person / Time
Site: Oconee  
Issue date: 04/09/1975
From:
DUKE POWER CO.
To:
Shared Package
ML19316A579 List:
References
NUDOCS 8001130092
Download: ML19316A587 (2)


Text

_

Oconee Unit 2 gg,7 DATE 4/9/75 DOCKET NO. 50-270 OPERATING STATUS March 31, 1975 March 1, 1975 7,igocca 1.

REPORTING PERIOD:

HOURS IN REPORTING PERIOD:

744.0 2.

CURRENTLY AUTHORIZED POWER LEVEi(MWthe MAX. DEPENDABLE cal ACITY (MWe-NET, 871 3.

LOWEST POWER LEVEL TO WHICH SPECIIICALL) RESTRICTED (IF ANY)(M%c NET). jane 4.

REASONS FOR RESTRICTION (IF ANY):

THIS CL MULATIVE REPORTING P1 RIOD YR TO DATE TO DATE S.

HOURS REACTOR WAS CRITICAL.

602.0 1039.4 2985.5 6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 0

7.

HOURS GENERATOR ON LINE.

542.8 972.1 2847.6 0

0 0

8.

UNIT RESERVE SHUTDOWN HOURS.

9.

GROSS THERMAL ENERGY 1188453 2243730 6550628 GENERATED (MWH) 10.

GROSS ELECTRICAL ENERGY GENERATED (M%1li 413190 770680 2239656 11.

NET ELECTRICAL ENERGY GENERATED (MWil) 389670 724348 9111R76 12.

REACTOR AVAILABILITY F ACTOR (1, 80.9 48.1 61.0 73 0 45 O 9R 7 13.

UNIT AVAILABILITY F ACTOR (2) 60.1 1R s 44.s 14.

UNIT CAPACITY F ACTOR (36 15.

UNIT FORCED OUTAGE RATE (4).

25.3 54.6 41.5 16.

SHtTTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE,DATE. AND *)UR ATION OF EACH):

17.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE 01 S~. ARTUP:

18.

UNITS iN TEST STATUS (PRIOR TO COMMERCI AL OPERATION) RE PORT THE FOLLOWING:

DATE LAST DkTE FORECAST ACH'IEVED INITIAL CRITICALITY INITIAL E LECTRIC AL POWER GENERATICN COMMERCIAL OPERATION

^

(1)

REACTOR AVAILABILITY FACTOR X 100 S

O X100 (2) UNIT AVAILABILITY FACTOR

=

NET Eli CTRIC AL POWE R GF NE R ATF D (3) UNIT CAPACITY FACTOR p

=

(4)

UNIT FORCED OUTAGE RATE

+ FORCF D OUT AGE HOURS

=

$.$ 0 0 &

l

l

~

d

]

DOCKET NO. 50 a j

UNIT Oco 4/9,i R

E DATE

?

8 Pn 8

AVERAGE DAILY UNIT POWER LEVEL z -

y +5 u

MONTH March, 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LE9 DAY (MWe-net)

DAY (MWe-net) 833 0

17 1

832 0

18 2

3 0

19 837 3, ^,

4 0

20 E

5 0

21 193 3[

6 0

22 680 l

695 7

0 23 2

793 513 24

[

8 2

g 691 25 817

" 801 26 816 10 11 816 27 487 824 28 263 12 13 844 29 333 14 843 30 499 15 843 31 740 16

'836 DAILY UNTT POWER LEVEL FORNI INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the repor Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by usin dependable capacity for the net electrical rating of the unit. there may be occasions whd average power level exceeds the 100'Tc line (or the restricted power level line). In sup average daily unit power output sheet should be footnoted to explain the apparent anomal l

-