ML19312D594
| ML19312D594 | |
| Person / Time | |
|---|---|
| Site: | Cherokee |
| Issue date: | 12/27/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Dail L DUKE POWER CO. |
| Shared Package | |
| ML19312D585 | List: |
| References | |
| NUDOCS 8003250048 | |
| Download: ML19312D594 (2) | |
See also: IR 05000491/1979020
Text
- - _ .
__
.
.
,
.
.
)/
'o
UNITED STATES
g
!
NUCLEAR REGULATORY COMMISSION
o
d
E
REGION il
'
k
8
101 MARIETTA ST., N.W., SUITE 3100
8
o
ATLANTA. GEORGIA 30303
.....
DEC 2 7 n79
In Reply Refer To:
RIIJJL
50-491/79-20
50-492/79-20
50-493/79-20
Duke Power Company
ATTN:
L. C. Dail, Vice President
Design Engineering
P.
O'. Box 33189
Charlotte, N C 28242
Gentlemen:
This refers to the inspection conducted by J. J. Lenahan of this office on
December 5-7, 1979, of activities authorized by NRC Construction Permit Nos.
CPPR-167, CPPR-168 and CPPR-169 for the Cherokee Nuclear facility, and to the
discussion of our findings held with C. B. Aycock at the conclusion of the
inspuction.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items ie discussed
in the enclosed report.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements.
This item and references
to pertinent requirements are listed in the Notice of Violation enclosed here-
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office, within 20
days of your receipt of this notice, a written statement or explanation in reply
including:
(1) corrective steps which have been taken by you and the results
achieved; (2) corrective steps which will be taken to avoid further noncom-
pliance; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
,
report, contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within- 20 days
to this office to withhold such information from public disclosure. Any such
)
8 o 032 50 ()lfid'
.
,
.
.
.
Duke Power Company
-2-
DEC 2 7 B79
application must include a full sticement of the reasons on the basis of which
it is , claimed that the information is proprletary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
,/
7
fY h
C.
. Murphy, Ch'ef
(VI'
Reactor Construction and Engineering
~$
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-491/79-20,
50-492/79-20 and 50-493/79-20
cc w/ enc 1:
J. T. Moore, Project Manager
P. O. Box 422
Gaffney, S C 29340
i
O
e
-