ML19312D594

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-491/79-20,50-492/79-20 & 50-493/79-20 on 791205-07 & Notice of Violation
ML19312D594
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 12/27/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19312D585 List:
References
NUDOCS 8003250048
Download: ML19312D594 (2)


See also: IR 05000491/1979020

Text

- - _ .

__

.

.

,

.

.

)/

'o

UNITED STATES

g

!

NUCLEAR REGULATORY COMMISSION

o

d

E

REGION il

'

k

8

101 MARIETTA ST., N.W., SUITE 3100

8

o

ATLANTA. GEORGIA 30303

.....

DEC 2 7 n79

In Reply Refer To:

RIIJJL

50-491/79-20

50-492/79-20

50-493/79-20

Duke Power Company

ATTN:

L. C. Dail, Vice President

Design Engineering

P.

O'. Box 33189

Charlotte, N C 28242

Gentlemen:

This refers to the inspection conducted by J. J. Lenahan of this office on

December 5-7, 1979, of activities authorized by NRC Construction Permit Nos.

CPPR-167, CPPR-168 and CPPR-169 for the Cherokee Nuclear facility, and to the

discussion of our findings held with C. B. Aycock at the conclusion of the

inspuction.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items ie discussed

in the enclosed report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

This item and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office, within 20

days of your receipt of this notice, a written statement or explanation in reply

including:

(1) corrective steps which have been taken by you and the results

achieved; (2) corrective steps which will be taken to avoid further noncom-

pliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

,

report, contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within- 20 days

to this office to withhold such information from public disclosure. Any such

)

8 o 032 50 ()lfid'

.

,

.

.

.

Duke Power Company

-2-

DEC 2 7 B79

application must include a full sticement of the reasons on the basis of which

it is , claimed that the information is proprletary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

,/

7

fY h

C.

. Murphy, Ch'ef

(VI'

Reactor Construction and Engineering

~$

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-491/79-20,

50-492/79-20 and 50-493/79-20

cc w/ enc 1:

J. T. Moore, Project Manager

P. O. Box 422

Gaffney, S C 29340

i

O

e

-