05000324/LER-1980-029-03, /03L:on 800323,following Reactor Scram,Hpci Discharge Valve E41-F006 Would Not Remain Open Following Low Level Initiation Signal.Caused by HPCI Turbine Stop Valve E41-V8 Opening Too Quickly.Spring Loaded Bypass Adjusted

From kanterella
(Redirected from ML19309F197)
Jump to navigation Jump to search
/03L:on 800323,following Reactor Scram,Hpci Discharge Valve E41-F006 Would Not Remain Open Following Low Level Initiation Signal.Caused by HPCI Turbine Stop Valve E41-V8 Opening Too Quickly.Spring Loaded Bypass Adjusted
ML19309F197
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 04/21/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19309F189 List:
References
LER-80-029-03L-01, LER-80-29-3L-1, NUDOCS 8004280599
Download: ML19309F197 (2)


LER-1980-029, /03L:on 800323,following Reactor Scram,Hpci Discharge Valve E41-F006 Would Not Remain Open Following Low Level Initiation Signal.Caused by HPCI Turbine Stop Valve E41-V8 Opening Too Quickly.Spring Loaded Bypass Adjusted
Event date:
Report date:
3241980029R03 - NRC Website

text

- _ _

tr 7n LICENSEE EVENT REPORT p

CONTROL BLOCK: l l

l l

l l

lh (PLEASE PT. INT OR TYPE ALL REQUIRED INF07.MATION) l 6

\\

lo l 1 l l N l C l B l E l P l 1 l@l 0 l 0 l - l 0 l 0 l 0 l 0 l 0 l - l 0 l 0 l@l 4 l 1 l 1 l 1 l 1 l@l l

l@

7 8 9 LICENSEE CUoE 14 ib LICENSE NuMtsEH lb 26 LICENSE TYPE JO 4/ 4 A f td COYT E

5%RC l L }@l 0 ] 510 ] - l 0 l 3 ] 2 l 5 l@l 0 l 3 l 2 l 3 l 810 l@l 0 l 4 l 2 l

?

8 60 61 DOCKET Nuv9ER h4 63 EVENT DATE 74 7b REPORT DATE 80 EVENT OESCRIPTION AND PROBABLE CONSEQUENCES h l Following a reactgr scram, the HPCI disenarge valve E41-F006 would not remain open l

Iol2l [TJT}l following a low level initiation signal. On April 2, 1980, while attempting to l

the same indications were received. l l o l 4 l l perform PT 45.3.4, HPCI Initiation Response Test, I

Io Isl !

l I o 16 I I l

lo17II Technical Specifications 3.5.1, 6.9.1.9b l

I o 18 I I 80 DE CODE SL80 E COVPONENT CODE SLeCODE SBO E l Sl Fl@ l El@ l B l@ lV l A lL lV l0 lP l@ W@ W @

lol91 7

8 9

to 11 12 13 16 IJ 20 SE QU ENTI AL OCCURRENCE REPORT REVISloN LER EVENT YE AR REPORT No.

CODE TYPE No.

@ s g'Ro l 810l l-l 101219J l/l 10l3l l 1,l l-l 10l at

_,21 22 23 24 26 27 28 29 30 31 32 K N ACT ON ON PLANT E

HOURS S9 iT F

i n B.

SLPPLIE VAN FACTURER l_Ej@l Gl@

(_Z_j@

l Z l@

l 010l 0] 0l l Y l@,

l Y l@

lAl@

lSl0l715l@

J4 3b 36 31 40 41 42 43 44 47 33 CAUSE OESCRIPTION.tND CORRECTIVE ACTIONS h l11oll The HPCI turbine stop valve E41-V8 was found'to be openine too cuickiv. 6 seco n l

vice 12, thus not allowing the flow controller to gain speed control before an l

,,,,,l overspeed condition was reached. The spring loaded bypass oil flow orifice was l

l adjusted for a proper valve stroke time, and the HPCI system was tested and re-l g g turned to service satisfactorily.

l 80 3

e 9

$A S

% POWER OTHER STATUS 015 O RY DISCOVERY DESCRIPTION W d@ l 0 l 0 l 0 l@l N/A l

lAl@l Operator Surveillance l

A flVITY CO TENT aftEASEO OPRELEASE AMOUNT oF ACTIVITY LOCATION OF RELEASE j,_Zj @ Q gl N/A l

l N/A l

I 1 6 7

8 9 10 11 44 45 S0 PERSONNEL EXPOSURES l

NUMBER TYPE DESCRIPTION 39 l i l 7 l l 0 l 0 l 0 l@[ Z l@l N/A l

I

' E RSO~ net',N,u'n',ES NUVBE R DE SCRIP TION W 10]O]0l@l

./A l

7 8 9 11 12 80 LOSS OF oH O AVAGE TO F ACILITY TYPE

DESCRIPTION

y @l N/A l

1 9 7

8 9 to 80 ISSUE @ DESCRIPTION l

N/A l

lllllllllllll}

2 n 68 69 80 5 8 9 to A. C. Tollison. Jr.

919-457-9521 E,

PHONE:

NAME Of PREPAHEFt 800428 0

$f-

~

O LER ATTACHMENT - RO NO. 1-80-29 Facility: BSEP Unit No. 1 Event Date: March 23, 1980 The HPCI discharge valve E41-F006 is interlocked with the steam supply valve E41-F001 and the turbine stop valve E41-V8 such that if either of these valves is not fully open, the -F006 valve will shut. When -V8 reached the full open position, -F006 would start to stroke open.

Due to the fast opening of -V8, the HPCI turbine would trip on overspeed, -V8 would shut, and -F006 would shut.

When the turbine slowed down to the overspeed reset speed, -V8 would again open and -F006 likewise. This would continue for several cycles until the speed con-trol unit could finally control the speed. -

Opening time determination will be added to the HPCI response time periodic test which is performed each refueling outage. The concerns of IE Circular 80-07 are also being reviewed with respect to the HPCI stop valves.