ML19308D460

From kanterella
Jump to navigation Jump to search
Notifies That Insp Rept 50-302/71-06 Performed on 711220-21. Grouting Program Per CP Acceptable.Ld Low Draft Response to PA Morris 711207 Memo Encl
ML19308D460
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/29/1971
From: Jennifer Davis
US ATOMIC ENERGY COMMISSION (AEC)
To: Engelken R
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19308D439 List:
References
NUDOCS 8002280772
Download: ML19308D460 (2)


Text

4 a--

~'

,/

i e"' '4 UNITED STATES F

U

$ N

t, ATOMIC ENERGY COMMISSION

'3

.l Xe (

l DIVISION OF COMPLIANCC i

e RE3 f 0 N 11 - $UIT E 918 230 PE AC HT R E E ST R E ET. NORT HwEET 7

  1. 1Jrgs ti AT L A NT A. GEORGI A % 30 3 December 29, 1971 R. H. Engelken, Assistant Director for Inspection and Enforcement

' Division of Compliance, Headquarters REQUEST FOR CONFIRMATORY INFORMATION REGARDING CRYSTAL RIVER UNI'i 3 OPERATING LICENSE-FLORIDA POWER CORPORATION-DOCKET NO. 50-302 Reference the memorandum dated December 7,1971, from P. A. Morris, Director, DRL, to L. D. Low, Director, CO, of above subject.

On December 20-21, 1971, an on-site inspection was made by L. L. Beratan, Senior Structural Engineer, Technical Support Branch, and R. F. Warnick, Reactor Inspector, Region II.

The inspection consisted of an in-depth review of the Foundation Engineering Report by Gilbert Associates, Inc.

]

From a review of the data, it was confirmed tha,t the grouting program as proposed and accepted for the issuance of the construction permit has been fully carried out in a satisfactory manner.

This inspection will be reported in CO Inspection Report No. 50-302/71-6.

Beratan's input to this report was sent to Region II on December 28, 1971, with a copy to you.

Attached is a draft copy of a suggested memorandum from Low to Morris j

in response to Morris' December 7, 1971, memorandum.

g

\\

},.^

John G. Davis CO:II:JGD Director

Attachment:

Draft Memo-Low to Morris cc:

J. B. Henderson, Chief Reactor Construction Branch L. L. Beratan, Senior Structural Engineer Dp Technical Support Branch G

TRANSMITTED VIA FACSIMILE

~

12/29/71 - 1:45 P.M. - KSK A;-

8002 280 7hN 1

_s am.

}

e

-l 1

. i h g

e I

I*. ih

$ [b L e.# I w eft g g l

$$ hhb$$ 0IN Y$$/bN f.lYY4. I

'N$5 b

  • ASIOS NbY nczc7 rdo, So-s o n.,

ECU N C AT; HJ ITAcILl:A T10/J Et/ SPu7-SPA 4CO 6744c. 4/20 2 7/64 1o retpante ?s yaie meme or.cernia; esbje. i, an..sl onenau 7;

& speClot \\ M utchijn Wu: CondJcltd en D:e nt.h tr %) CI,$d ver s l:j th> l 9.tso'clec$

y> qrum has uM c.1m);l.* f.:),

.a ;~.j ; n.).s e :,: deba and r: cords, :nSIrm Lhal bht grovitn3 progrs m

. s pnpued 3rd sceep.4d 0:W iht Iswance DC % contfruc4/sn ytr,n) b hn Unn Avit accomai :iled in a :ns.:0:4 wf asi.nne,,

L&W t'tt Icl. Do Lok!,

DId&)r s

t

~2

?

Ad-@D.1}l

~

e a,

I

(

,.._,.-,