ML19308D438
| ML19308D438 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/27/1972 |
| From: | Jennifer Davis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Rodgers J FLORIDA POWER CORP. |
| Shared Package | |
| ML19308D439 | List: |
| References | |
| NUDOCS 8002280754 | |
| Download: ML19308D438 (1) | |
See also: IR 05000302/1971006
Text
-
-
-.
_
,_.
..
..
- *
'
. . .
-
..
.
,
p'# '%,,
UNITED STATES
\\
/
$
Ti.
ATOMIC ENERGY COMMISSION
L.
y{ a Q e
DIVISION oF COMPLIANCE
ar
PEGION 81 - S U I T E 818
9S,
230 P E ACHT R EE ST REET. NCPT HWWEST
7
/
t
AT LANT A. GECnGI A 30303
In Reply Refer To:
January 27, 1972
CO:II:RFW
50-302/71-6
Florida Power Corporation
-
Attn:
Mr. J. T. Rodgers
Assistant Vice '.esident and
Nuclear Project Manager
101 Fifth Street South
P. O. Box 14042
St. Petersburg, Florida 33733
Gentlemen:
O
This refers to the inspection conducted by Messrs. Warnick and Beratan
of the Division of Compliance on December 20-21, 1971, of activities
authorized by AEC Construction Perrait No. CPPR-51 for the Crystal River
3 facility, and to the discussion held with Mr. E. E. Froats of your
staff during the inspection.
The area examined during this inspection was the grout ~ing program de-
scribed by you at the time the construction permit was issued.
Within
this area, the inspection consisted of selective examinations of the
Foundation Engineering Report prepared jointly by Gilbert Associates, Inc.,
and Woodward-Clyde and Associates, interviews with plant personnel, and
observations by the inspectors.
Within the scope of this inspection, no items of nonconformance were
identified.
Should you have any questions concerning this letter, we vill be glad to
discuss them with you.
ery truly yours,
,.)
o
\\
/
'
-
..
n
. Davis
(n)
/
'
Director
t
8 0 02 280 ff'/
i
l
L
g 078i p