ML19308D444

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-302/71-06 on 711220-21.No Noncompliance Noted
ML19308D444
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/07/1971
From: Moseley N
US ATOMIC ENERGY COMMISSION (AEC)
To: Henderson J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19308D439 List:
References
NUDOCS 8002280758
Download: ML19308D444 (1)


Text

.O -

n.

p.

.f q,

y

.O

. )

)

'd

[ - "' '%

UNITED STATES ATOMIC ENERGY COMMISSION

..l 4

DIVISloN OF COMPLIANCE g

]

REGION 11 - 3UIT E 818 i

r, #f rig et p 230 PE AC HT R E E ST R E ET. NCRT H W EST

,g d

AT L A NT A, GEORGI A -30303 January 7, 1971 J. B. Henderson, Chief, Reactor Construction Branch Division of Compliance, Headquarters FLORIDA POWER CORPORATION (CRYSTAL RIVER 3), LICENSE NO. CPPR-51, DOCKET NO. 50-302 The attached report of a special announced inspection at the subject site on December 20-21, 1971, is forwarded for information. The inspection was made in response to a memorandum dated December 7, 1971, from P. A. Morris to L. D. Lov in which we were asked to con-firm that the foundation grouting program was accomplished as described in the application. The findings of this inspection indicate that the grouting was satisfactorily completed as described.

k

'[

N. C. Moseley CO:II:NCM Senior Reactor Inspector

Enclosure:

C0 Rpt. No. 50-302/71-6 (Warnick,Beratan) cc v/ enc 1:

E. G. Case, DRS (3)

R. F.

'c.,1, DRL (2)

R. v. OrToung, DRL (2)

D. J. Skovholt, DRL (3)

H. R. Denten, DBL (2)

A. Giambusso, CO L. Kornblith, Jr., 10 R. H. Engelken, CO J. P. O'Reilly, CO:I B. H. Grier, CO:III J. W. Flora, CO:IV R. W. Smith, CO:V CO Files DR Central Files.

8 002 280 7f M 2an

-