05000302/LER-1978-031-01, /01T-0:on 780609,while Moving New Fuel Elevator Test Weight in Spent Fuel Pool with Missile Shield Crane FHCR-7,crane Hook Failed & Dropped Weight.Caused by Personnel Error in Selecting Hook.Procedures to Be Changed

From kanterella
(Redirected from ML19308D242)
Jump to navigation Jump to search
/01T-0:on 780609,while Moving New Fuel Elevator Test Weight in Spent Fuel Pool with Missile Shield Crane FHCR-7,crane Hook Failed & Dropped Weight.Caused by Personnel Error in Selecting Hook.Procedures to Be Changed
ML19308D242
Person / Time
Site: Crystal River 
Issue date: 06/21/1978
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19308D132 List:
References
LER-78-031-01T, LER-78-31-1T, NUDOCS 8002270697
Download: ML19308D242 (3)


LER-1978-031, /01T-0:on 780609,while Moving New Fuel Elevator Test Weight in Spent Fuel Pool with Missile Shield Crane FHCR-7,crane Hook Failed & Dropped Weight.Caused by Personnel Error in Selecting Hook.Procedures to Be Changed
Event date:
Report date:
3021978031R01 - NRC Website

text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _

o.

3 N..C & OHM 'II.si

/~~N f t,19 U $ NUCLEAR H[GUL AlORY (*0A AtIS$aON

(\\ /

LICENSEE EVENT REPORT EXHIBIT A pl__ l l 1 1 1@

<rtEAsE rRiNr on r vre. Riauvie n ia.....,,,ner,'

CoNinot stocx F5T 1 L, F_lk _l 0 i RI P 1 31@l 01 01 - 1 010 l 01 0 0 l -l 0 I Ol@l 4l1 l 111 1 1 l(1)

...o,,,

<,e~s.~,......

,,m,m,,,,,,

,.. m eav s IoLJ.

, ',, " ', " ' [L. j@l015101-101310 I ?l@l nI 610 lo I 7 I RI@l ni6 I 5i 117 I ol@

.....n

...,,,,ou...

EVENT DE5 Cit piton ANu esteHAHi.E i;ONSEQUENCES bo FT] l At 1450, while moving the new ruel elevator test weight in the spent

[,, g g uel ' pool, the missile shield crane (FHCR-7), plant fabricated crane l

i (y_1f)i hook failed d_ropping the test weight.

The uuger.*nd came to rest againsti to is t t an APSR couclino device in fuel assembly A 48.

This event is recorted I

lole>lI in accordance with STS 6.9.1 R.i.

No annar9nt material damage was initiallly note %

io i,i i Redundancy N/A.

No safety hazard.

First occurrence.

i lotal1

,, 2 1

$iYa" Y,',,$t 1

si,I,Nr cow omenter)ut sd 'r$,'us sSNioe' I si n l@ [1]@ L. C lO,l x i.xl xl x l xl x lO L..x_j@ Q @

lo l il s. o.. u.t

_IYINI #I *II

. n.n.a ~,.

....e.n aiv.m~

O,,",,;6,,

8,,,

1 7 I 91 l, -J In I all i M,

10 l 1 1 1TI

(_-j 1,0_j

EPINII No CIII'I ITEI NII

_a, 2

1&E N A,,

,I

,, f,

,,,)Ufl$

U,.

f,1,

..M

. l Ll@

lxI919l9l@

L..LJ@L.Li@ L7.!@

l..ZJ@ 10 101 01 4 l.!._1@ lNl@

v

,p, u

,,,f

,,f e, u

4 CAUSE DESCAIPTION AND COHRECrIVE ACrIONS h o

Cause of this event has been determined to be lack of conservatism in i, n, i i i

ITTr1 i personnel iudaement of liftina hook selection.

Revisions to orocedurp.:

i i, i.,i i will be initiated to assure procer identification and load caoabilities i

i,i ii of all liftina devices.

Disciolinary acti>'n has been recommended.

I ii1>1I 4 1 l

'Ja '.'.7 o,,,,o s,.rus @ ' T,M7,W,?.'

~

s -,,

l A l@l Opera to r Obse.,,,,

n,p.,,,,,,,,,, @

I,I I[j_J @ 10l 010l(31 NA I

rvation

...'n....

..o..

.u......,.,, v., @ l n,,,,...,n.,,,,,,.. _, @

ea

...s o,..,,,, o u, I m LIJ @ L.z1G I NA l

UA I

.... u..., (c 0 r

a 1 010 1 0 l(Q.,,,Z_j@l NA i

l

......... u, @

U_LJ l dT.6'..i.0lq,3; NA

' I::,"' ~;$,::U:,"~"""@

ITI L, Z_J@l NA i

"' ' '.' '......, ( [)

N'a '* i

'+.8-CO ylJ"!

._ _J iiiiiiiiiiril NA J. Coooer D l o. nM 17. a. c:_ a.1 oc s..

o.,,... r a.....

......N, y~

8002 270 bD

SUPPLEMENTARY INFORMATION i

V Report No.:

50-302/78-031/01T-0 Facility:

Crystal River Unit #3 Report Date:

21 June 1978 Occurrence Date:

9 June 1978 Identification of Occurrence:

Drop of new fuel elevator test weight on fuel assembly A-48 and reported in accognce with Technical Specification 6.9.1.8.i.

Conditions Prior to Occurrence:

Mode 6 refueling.

~

Description of Occurrence:

At 1450 hours0.0168 days <br />0.403 hours <br />0.0024 weeks <br />5.51725e-4 months <br />, while lifting the new fuel elevator test weight

~<

(2050 lbs.) from "Y" up-ender to an empty fuel storage rack with the missile shield crane (FHCR-7) a plant fabricated rigging hook failed, dropping the test weight.

The bottom weighted end of the test weight struck an edge of an empty fuel rack and fell over to its side and the top came to rest against an APSR coupling device v

in fuel assembly A-48.

Initial fuel assembly damage assessment failed to reveal any material damage to the struck fuel assembly.

Subsequent inspections of assembly A-48 have revealed that some deformation has occurred.

It has been decided that this assembly will not be utilized in the reactor in its current state and will be replaced.

The test load was removed and stored in the spent fuel area.

Designation of Apparent Cause:

The cause of this occurrence was due to the lack of conserv'atism in personnel judgment of lifting hook selection.

Analysis of Occurrence:

There was no safety hazard to the plant or general public in that immediate sampling of the spent fuel pit water and airborne activity revealed no change from previous condition.

Subsequent periodic sampling affirmed no change in water or airborne ~ activity.

Corrective Action

A review of procedures controlling load testing and identification of all lifting devices has been completed.

Revisions to these procedures will be initiated to assure proper identification and load capabilities of all such lifting devices.

All use of crane hooks, chokers, slings, and shackles performing safety related work will be procedurally controlled.

Disciplinary action has been recommeded.

e

Suppicmentary Information (cont'd) i Failure Data:

This is the first occurrence of an event of this type.