ML19308D132

From kanterella
Jump to navigation Jump to search
Forwards LER 78-031/01T-0
Date released: 11/18/2019 Download: ML19308D132


LER 78-031/01T-0:on 780609,while Moving New Fuel Elevator Test Weight in Spent Fuel Pool with Missile Shield Crane FHCR-7,crane Hook Failed & Dropped Weight.Caused by Personnel Error in Selecting Hook.Procedures to Be Changed
ML19308D242
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/21/1978
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19308D242 (3)
Forwards LER 78-031/01T-0
ML19308D131
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/22/1978
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19308D131 (1)