Category:LICENSEE EVENT REPORT (SEE ALSO AO
MONTHYEARML20045F7741993-06-30030 June 1993 LER 93-001-01:on 930305,cooldown Exceeding Limits of TS 3.4.9.1 Experienced After Switching from SG Cooling to Dh Sys Cooling.Caused by Failure of Cv Controller.Valve Repaired & Valve Operation Instructions Revised ML20045D7741993-06-18018 June 1993 LER 93-006-00:on 930520,inadequately Secured Separation Barrier Identified That Could Affect Control Switches for safety-related Equipment on Main Control Board.Caused by Human Error.Placard Posted to Restrict area.W/930618 Ltr ML20044D2101993-05-10010 May 1993 LER 93-004-00:on 930408,inappropriate Personnel Action Resulted in Degraded Class 1E Bus Voltage & Actuation of Edg.Licensee Established Addl Administrative Controls on Switchyard activities.W/930510 Ltr ML20044D1651993-05-10010 May 1993 LER 93-003-00:on 930408,determined That Insufficient Instrument Error Considered When Operating Limits for Core Flood Tank Selected.Caused by Programmatic Deficiency.Alarm Bistables Reset & Allowed Margin expanded.W/930510 Ltr ML20024H1741991-05-17017 May 1991 LER 90-002-02:on 900216,determined That Fire Dampers May Not Be Operable Under Expected Ventilation Flow Conditions Due to Design Error.Design Basis Documents updated.W/910517 Ltr ML20029A6531991-02-25025 February 1991 LER 91-001-00:on 910124,engineered Safeguards Train a HPI Recirculation Isolation Valve MUV-53 Declared Inoperable Due to Undersized Thermal Overload Elements for Motor Operator.Cause Undetermined.Elements replaced.W/910225 Ltr ML20028H7131991-01-21021 January 1991 LER 89-022-01:on 890614,erroneous Indication of Loss of Main Feedwater Pumps Occurred Resulting in Manual ESF Actuation. Temporary Loss of Supervisory Indicating Lights Expected During Bus Realignment.Procedures revised.W/910121 Ltr ML20043H5751990-06-22022 June 1990 LER 90-009-00:on 900523,discovered That Paperwork for Mod to Replace Feedwater Vent Valve Still Open 12 Months After Work Completed.Caused by Lost Blanket Work Request Re post-maint Testing.New Work Request initiated.W/900622 Ltr ML20043G6511990-06-14014 June 1990 LER 90-008-00:on 900514,determined That Fault Current Could Develop Across Engineered Safeguards 480-volt Bus Output Breakers.Caused by Failure to Perform Adequate Short Circuit Analysis.Deficient Trip Devices replaced.W/900614 Ltr ML20042F9781990-05-0707 May 1990 LER 89-031-01:on 890828,480-volt Engineered Safeguards Stepdown Transformer a Faulted Causing Decay Heat Train Closed Cycle Cooling Pump a to Deenergize.Caused by Degraded Insulation.Transformer replaced.W/900507 Ltr ML20011F1731990-02-21021 February 1990 LER 90-001-00:on 900221,RCS Leakage Calculations Indicated That Unidentified Leakage Exceeded Tech Spec Limits.Caused by Failed Packing on Block Valve.Valve Repacked During Feb 1990 Maint outage.W/900221 Ltr ML20005F1601990-01-0808 January 1990 LER 89-040-00:on 891208,emergency Diesel Generators a & B Actuated Due to Degraded Voltage When Condensate Pump Started.Operator Guidelines & Procedures for Starting Condensate Pumps Being revised.W/900108 Ltr ML20011D2281989-12-15015 December 1989 LER 89-026-01:on 890629,emergency Diesel Generator 1B Failed post-maint Test & Could Not Be Returned to Svc within Time Allowed by Tech Specs.Caused by Rotor Not Turning.Crankcase Vapor Ejector cleaned.W/891215 Ltr ML19332E7691989-12-0707 December 1989 LER 89-039-00:on 891107,determined That Control Circuits for Two Makeup Valves Did Not Meet Separation Criteria of 10CFR50 App R.Caused by Cognitive Personnel Error.Roving Fire Watch Patrol Confirmed in effect.W/891207 Ltr ML19332F0171989-11-30030 November 1989 LER 89-038-00:on 891029,util Engineers Discovered That Administrative Controls Not in Place for Three Makeup & Purification Sys Valves.Caused by Personnel Error.Plant Procedures revised.W/891130 Ltr ML19332D1391989-11-27027 November 1989 LER 89-037-00:on 891026,determined That Instrumentation Used to Balance HPI Flow Through Four Injection Lines During Small Break LOCA Inadequate.Caused by Inadequate Review of B&W Guidelines.Flow Instrument installed.W/891127 Ltr ML19327C2611989-11-17017 November 1989 LER 89-036-00:on 891018,determined That Plant Operating Outside Design Basis Since Borated Water Storage Tank Level Transmitters Not Seismically Qualified.Caused by Personnel Error.Unqualified Transmitters replaced.W/891117 Ltr ML19325F3341989-11-10010 November 1989 LER 89-035-00:on 890906,discrepancy Noted in dc-powered Component Rated Voltages & Actual Voltages Seen by Components.Caused by Inadequate Control of Design Process. All Components Replaced Prior to startup.W/891110 Ltr ML19325F3371989-11-10010 November 1989 LER 89-033-00:on 890908,second Level Undervoltage Relay Sys Setpoint for Engineered Safeguards Buses Not Conservative & Led to Operation Outside Plant Design Basis.Caused by Personnel Error.Setpoint changed.W/891110 Ltr ML19325E7371989-10-27027 October 1989 LER 85-034-01:on 850310,valve Alarm Function for Core Flood Tank Isolation Valves Failed to Meet Acceptance Criteria.On 850809,unit Entered Mode 3 & Then Raised RCS Pressure Above 750 Psig W/O Meeting Operability surveillances.W/891027 Ltr ML19324B3871989-10-26026 October 1989 LER 89-034-00:on 890926,two Conditions Determined to Be Outside Plant Design Basis Re Solenoid Control Valves.Caused by Cognitive Personnel Error.Test Solenoid Valve Circuits Provided W/Isolation fuses.W/891026 Ltr ML19324B3921989-10-26026 October 1989 LER 88-002-02:on 880107,emergency Feedwater Actuation Occurred on Loss of Both Main Feedwater Pumps.Caused by Instrumentation & Control Technician Error.Idle Feedwater Pump Started & Actuation reset.W/891026 Ltr ML19327B2301989-10-23023 October 1989 LER 89-016-02:from 890227-0601,deficiencies Re Environ Qualification of Plant Equipment Discovered.Caused by Deficiencies in Detailed Development & Implementation of Environ Qualification Program.Program reviewed.W/891023 Ltr ML20023B4091983-04-27027 April 1983 LER 83-018/01T-0:on 830413,preliminary Repts Received from B&W Indicating That 51 of 120 Upper Core Barrel Bolts Ultrasonically Tested May Be Defective.Cause Unknown. Investigation Underway.Supplemental Rept Will Be Written ML20028E0561983-01-13013 January 1983 LER 82-075/03L-0:on 821215,during Cold Shutdown,Circuit Breaker on Control Complex Ventilation Radiation Monitor RMA-5 Tripped.Caused by Broken Pump Vane Binding Pump. Pump Replaced ML20027B1201982-09-10010 September 1982 LER 82-054/03L-0:on 820812,remote Reactor Coolant Temp Indicator RC-4A-T12 Discovered Inoperable.Caused by Dirty Terminals.Instrument Lugs & Terminals Cleaned ML20052H6841982-05-0505 May 1982 LER 82-031/03L-0:on 820405,175-ft Wind Direction Channel Found Not Functioning Properly.Caused by Lost Vane & Instrument Drift.Vane Replaced & Instrument Recalibr ML20052C9391982-04-30030 April 1982 LER 82-028/03L-0:on 820330,following Reactor Trip,Discovered Source Range Instrument Indicating Below Tech Spec Limits.Caused by Failed High Voltage Power Supply.Power Supply for Instrument Replaced ML20052G5901982-04-28028 April 1982 LER 82-029/03L-0:on 820331,hydraulic Snubber MSH-168 Found Leaking Hydraulic Fluid.Caused by Leaking Shaft Seal.Snubber Shaft Seal Replaced ML20052H7661982-03-29029 March 1982 LER 82-013/03L-0:on 820228,during Routine Insp,Leak Discovered on Pressure Side of MUV-292 in Heat Affected Area of Weld.Caused by Vibration.Weld Replaced & Addl Support Added to MUV-292 to Reduce Vibration ML20050C2291982-03-17017 March 1982 LER 82-010/03L-0:on 820217,connector RMG-14 Failed & Declared Inoperable.Caused by Leak or Leaks in Roof Allowing Water to Enter Electrical Connector.Connector Cleaned & Repaired & Will Be Waterproofed ML20050C1371982-03-16016 March 1982 LER 82-009/03L-0:on 820204,containment Isolation Valves MUV-259 & MUV-260 Failed to Close During Cold Shutdown Testing.Caused by Insufficient Torque Switch Settings.Torque Switch Setting increased.MP-402 Will Be Revised ML20041A6211982-02-0202 February 1982 LER 82-001/03L-0:on 820106,core Flood Tank B Was Discovered W/Level Below Tech Spec Requirements.Caused by Loss of Water in Ref Legs of Level Transmitters.Legs Filled. Transmitters to Be Replaced ML20041A6351982-02-0202 February 1982 LER 82-002/03L-0:on 820106,casing for Pump MUP-1B Found to Be Seismic Anchor Following Removal Per MP-126.Caused by Failure of Procedure to Identify Required Seismic Analysis Prior to Removal.Discharge Restraints Added to Procedure ML20040C5831982-01-19019 January 1982 LER 81-082/03L-0:on 821221,discovered Containment Isolation Valve CFV-27 Inoperative.On 811223 Five Other Valves Were Inoperative.Caused by Failure of Control Relays.Relay Coils & Plungers Replaced ML20040B7881982-01-15015 January 1982 LER 81-081/03L-0:on 811222,while Maintaining Steam Header Pressure for Turbine testing,MSV-35 Code Relief Was Continuously Relieving Approx 50 Lb Below Tech Spec Setpoint.Caused by Setpoint Drift.Valve Lift Setpoint Reset ML20040B7891982-01-15015 January 1982 LER 81-079/03L-0:on 811218,while Increasing Reactor Power, Operator Noted a once-through Steam Generator Operating Level Not Trending Up W/Reactor Power.Caused by Failure of Level Transmitter Amplifier LT-2.Amplifier Replaced ML20040C6641982-01-0606 January 1982 LER 81-078/03L-0:on 811208,during Normal Operation,Emergency Feedwater Ultrasonic Flow indicator,FW-313-FI Exceeded Zero Check Low Limit.Caused by Inability of Instrument to Consistently Indicate Zero Flow.Instrument re-zeroed ML20039C5511981-12-23023 December 1981 LER 81-077/03L-0:on 811204,B Emergency Diesel Generator Control Circuit Discovered Grounded During Surveillance Procedure SP-354,rendering Generator Inoperable.Caused by Electrical Conduit Separation,Rubbing Insulation Off Wiring ML20039C5281981-12-23023 December 1981 LER 81-066/03L-1:on 811010,11,13,17,20,26,27,1130,1201 & 02, Fifteen Reactor Protection Instruments Found Out of Tolerance.Caused by Instrument Drift,Bellow Failure,Loose Test Point Output Terminal & Defective Photo Cell ML20005C0271981-11-0606 November 1981 LER 81-066/03L-0:on 811010,various Reactor Protection Instruments Found Out of Tolerance.Caused by Bellows Failure,Instrument Drift & Loose Test Point Output Terminal. Bellows Replaced,Terminal Tightened & Instruments Recalibr ML20005A3021981-06-23023 June 1981 LER 81-029/03L-0:on 810522,emergency Feedwater Ultrasonic Flowrate Indicator FW-313-FT Was Discovered in Fault Condition & Would Not Reset.Caused by Failed Power Supply Board in Transmitter.Board Replaced ML20004E4941981-06-0505 June 1981 LER 81-028/03L-0:on 810509,emergency Feed Pump EFP-1 Found Inoperable.Caused by Overheating of Packing Due to Routine Wear.Pump Repacked & Functionally Tested ML19347F5071981-05-12012 May 1981 LER 81-025/03L-0:on 810417,EFP-2 Control Switch Discovered in Off Position.Caused by Procedural Deficiencies.Procedures Modified to Require Assurance That EFP-2 Is Selected to Auto ML19347F5141981-05-11011 May 1981 LER 81-024/03L-0:on 810414,emergency Diesel Generator 1A Found Inoperable During Monthly Test SP-354.Caused by Plugged Oil Separator in Air Ejector Train.Procedure Being Revised to Increase Cleaning & Insp Frequency ML19350D7711981-05-11011 May 1981 LER 81-022/03L-0:on 810412,following Reactor Trip,Main Steam Isolation Valve Msv Found Inoperable.Cause Undetermined.Mods Performed to Improve Valve Operation & Reliability. Functional Test Results Satisfactory.Operability Restored ML19345G8571981-04-14014 April 1981 LER 80-059/04L-0:on 810316,deviations from Fall 1980 Environ Rept Noted.Cause Not Determined Conclusively.Study Will Continue.No Corrective Action Can Be Accomplished Until Cause Clearly Established ML20004C6191981-04-10010 April 1981 LER 81-019/03L-0:on 810313,during Normal operation,RC3,RC6 & RB3 Relays Tripped in Emergency Safeguards Actuation Channel B.Cause Attributed to Failed Hamlin Relay.Maint Revealed Addl Faulty Relays.Hamlin Replaced W/Cryden Relays ML20003E4361981-03-31031 March 1981 LER 81-016/03L-0:on 810304,breaker for DHV-110,decay Heat Pump a Discharge Throttle Valve Tripped.Cause Unknown. DHV-110 Repetitively Cycled W/No Failures ML19350C7121981-03-31031 March 1981 LER 81-014/03L-0:on 810301,Clark Relay Model 5UK6-3 in Reactor Bldg Isolation Channel B,Group 2,failed to Actuate When Coil Was de-energized During SP-130.Caused by Burr on Relay Shaft.Relay Replaced 1993-06-30
[Table view] Category:RO)
MONTHYEARML20045F7741993-06-30030 June 1993 LER 93-001-01:on 930305,cooldown Exceeding Limits of TS 3.4.9.1 Experienced After Switching from SG Cooling to Dh Sys Cooling.Caused by Failure of Cv Controller.Valve Repaired & Valve Operation Instructions Revised ML20045D7741993-06-18018 June 1993 LER 93-006-00:on 930520,inadequately Secured Separation Barrier Identified That Could Affect Control Switches for safety-related Equipment on Main Control Board.Caused by Human Error.Placard Posted to Restrict area.W/930618 Ltr ML20044D2101993-05-10010 May 1993 LER 93-004-00:on 930408,inappropriate Personnel Action Resulted in Degraded Class 1E Bus Voltage & Actuation of Edg.Licensee Established Addl Administrative Controls on Switchyard activities.W/930510 Ltr ML20044D1651993-05-10010 May 1993 LER 93-003-00:on 930408,determined That Insufficient Instrument Error Considered When Operating Limits for Core Flood Tank Selected.Caused by Programmatic Deficiency.Alarm Bistables Reset & Allowed Margin expanded.W/930510 Ltr ML20024H1741991-05-17017 May 1991 LER 90-002-02:on 900216,determined That Fire Dampers May Not Be Operable Under Expected Ventilation Flow Conditions Due to Design Error.Design Basis Documents updated.W/910517 Ltr ML20029A6531991-02-25025 February 1991 LER 91-001-00:on 910124,engineered Safeguards Train a HPI Recirculation Isolation Valve MUV-53 Declared Inoperable Due to Undersized Thermal Overload Elements for Motor Operator.Cause Undetermined.Elements replaced.W/910225 Ltr ML20028H7131991-01-21021 January 1991 LER 89-022-01:on 890614,erroneous Indication of Loss of Main Feedwater Pumps Occurred Resulting in Manual ESF Actuation. Temporary Loss of Supervisory Indicating Lights Expected During Bus Realignment.Procedures revised.W/910121 Ltr ML20043H5751990-06-22022 June 1990 LER 90-009-00:on 900523,discovered That Paperwork for Mod to Replace Feedwater Vent Valve Still Open 12 Months After Work Completed.Caused by Lost Blanket Work Request Re post-maint Testing.New Work Request initiated.W/900622 Ltr ML20043G6511990-06-14014 June 1990 LER 90-008-00:on 900514,determined That Fault Current Could Develop Across Engineered Safeguards 480-volt Bus Output Breakers.Caused by Failure to Perform Adequate Short Circuit Analysis.Deficient Trip Devices replaced.W/900614 Ltr ML20042F9781990-05-0707 May 1990 LER 89-031-01:on 890828,480-volt Engineered Safeguards Stepdown Transformer a Faulted Causing Decay Heat Train Closed Cycle Cooling Pump a to Deenergize.Caused by Degraded Insulation.Transformer replaced.W/900507 Ltr ML20011F1731990-02-21021 February 1990 LER 90-001-00:on 900221,RCS Leakage Calculations Indicated That Unidentified Leakage Exceeded Tech Spec Limits.Caused by Failed Packing on Block Valve.Valve Repacked During Feb 1990 Maint outage.W/900221 Ltr ML20005F1601990-01-0808 January 1990 LER 89-040-00:on 891208,emergency Diesel Generators a & B Actuated Due to Degraded Voltage When Condensate Pump Started.Operator Guidelines & Procedures for Starting Condensate Pumps Being revised.W/900108 Ltr ML20011D2281989-12-15015 December 1989 LER 89-026-01:on 890629,emergency Diesel Generator 1B Failed post-maint Test & Could Not Be Returned to Svc within Time Allowed by Tech Specs.Caused by Rotor Not Turning.Crankcase Vapor Ejector cleaned.W/891215 Ltr ML19332E7691989-12-0707 December 1989 LER 89-039-00:on 891107,determined That Control Circuits for Two Makeup Valves Did Not Meet Separation Criteria of 10CFR50 App R.Caused by Cognitive Personnel Error.Roving Fire Watch Patrol Confirmed in effect.W/891207 Ltr ML19332F0171989-11-30030 November 1989 LER 89-038-00:on 891029,util Engineers Discovered That Administrative Controls Not in Place for Three Makeup & Purification Sys Valves.Caused by Personnel Error.Plant Procedures revised.W/891130 Ltr ML19332D1391989-11-27027 November 1989 LER 89-037-00:on 891026,determined That Instrumentation Used to Balance HPI Flow Through Four Injection Lines During Small Break LOCA Inadequate.Caused by Inadequate Review of B&W Guidelines.Flow Instrument installed.W/891127 Ltr ML19327C2611989-11-17017 November 1989 LER 89-036-00:on 891018,determined That Plant Operating Outside Design Basis Since Borated Water Storage Tank Level Transmitters Not Seismically Qualified.Caused by Personnel Error.Unqualified Transmitters replaced.W/891117 Ltr ML19325F3341989-11-10010 November 1989 LER 89-035-00:on 890906,discrepancy Noted in dc-powered Component Rated Voltages & Actual Voltages Seen by Components.Caused by Inadequate Control of Design Process. All Components Replaced Prior to startup.W/891110 Ltr ML19325F3371989-11-10010 November 1989 LER 89-033-00:on 890908,second Level Undervoltage Relay Sys Setpoint for Engineered Safeguards Buses Not Conservative & Led to Operation Outside Plant Design Basis.Caused by Personnel Error.Setpoint changed.W/891110 Ltr ML19325E7371989-10-27027 October 1989 LER 85-034-01:on 850310,valve Alarm Function for Core Flood Tank Isolation Valves Failed to Meet Acceptance Criteria.On 850809,unit Entered Mode 3 & Then Raised RCS Pressure Above 750 Psig W/O Meeting Operability surveillances.W/891027 Ltr ML19324B3871989-10-26026 October 1989 LER 89-034-00:on 890926,two Conditions Determined to Be Outside Plant Design Basis Re Solenoid Control Valves.Caused by Cognitive Personnel Error.Test Solenoid Valve Circuits Provided W/Isolation fuses.W/891026 Ltr ML19324B3921989-10-26026 October 1989 LER 88-002-02:on 880107,emergency Feedwater Actuation Occurred on Loss of Both Main Feedwater Pumps.Caused by Instrumentation & Control Technician Error.Idle Feedwater Pump Started & Actuation reset.W/891026 Ltr ML19327B2301989-10-23023 October 1989 LER 89-016-02:from 890227-0601,deficiencies Re Environ Qualification of Plant Equipment Discovered.Caused by Deficiencies in Detailed Development & Implementation of Environ Qualification Program.Program reviewed.W/891023 Ltr ML20023B4091983-04-27027 April 1983 LER 83-018/01T-0:on 830413,preliminary Repts Received from B&W Indicating That 51 of 120 Upper Core Barrel Bolts Ultrasonically Tested May Be Defective.Cause Unknown. Investigation Underway.Supplemental Rept Will Be Written ML20028E0561983-01-13013 January 1983 LER 82-075/03L-0:on 821215,during Cold Shutdown,Circuit Breaker on Control Complex Ventilation Radiation Monitor RMA-5 Tripped.Caused by Broken Pump Vane Binding Pump. Pump Replaced ML20027B1201982-09-10010 September 1982 LER 82-054/03L-0:on 820812,remote Reactor Coolant Temp Indicator RC-4A-T12 Discovered Inoperable.Caused by Dirty Terminals.Instrument Lugs & Terminals Cleaned ML20052H6841982-05-0505 May 1982 LER 82-031/03L-0:on 820405,175-ft Wind Direction Channel Found Not Functioning Properly.Caused by Lost Vane & Instrument Drift.Vane Replaced & Instrument Recalibr ML20052C9391982-04-30030 April 1982 LER 82-028/03L-0:on 820330,following Reactor Trip,Discovered Source Range Instrument Indicating Below Tech Spec Limits.Caused by Failed High Voltage Power Supply.Power Supply for Instrument Replaced ML20052G5901982-04-28028 April 1982 LER 82-029/03L-0:on 820331,hydraulic Snubber MSH-168 Found Leaking Hydraulic Fluid.Caused by Leaking Shaft Seal.Snubber Shaft Seal Replaced ML20052H7661982-03-29029 March 1982 LER 82-013/03L-0:on 820228,during Routine Insp,Leak Discovered on Pressure Side of MUV-292 in Heat Affected Area of Weld.Caused by Vibration.Weld Replaced & Addl Support Added to MUV-292 to Reduce Vibration ML20050C2291982-03-17017 March 1982 LER 82-010/03L-0:on 820217,connector RMG-14 Failed & Declared Inoperable.Caused by Leak or Leaks in Roof Allowing Water to Enter Electrical Connector.Connector Cleaned & Repaired & Will Be Waterproofed ML20050C1371982-03-16016 March 1982 LER 82-009/03L-0:on 820204,containment Isolation Valves MUV-259 & MUV-260 Failed to Close During Cold Shutdown Testing.Caused by Insufficient Torque Switch Settings.Torque Switch Setting increased.MP-402 Will Be Revised ML20041A6211982-02-0202 February 1982 LER 82-001/03L-0:on 820106,core Flood Tank B Was Discovered W/Level Below Tech Spec Requirements.Caused by Loss of Water in Ref Legs of Level Transmitters.Legs Filled. Transmitters to Be Replaced ML20041A6351982-02-0202 February 1982 LER 82-002/03L-0:on 820106,casing for Pump MUP-1B Found to Be Seismic Anchor Following Removal Per MP-126.Caused by Failure of Procedure to Identify Required Seismic Analysis Prior to Removal.Discharge Restraints Added to Procedure ML20040C5831982-01-19019 January 1982 LER 81-082/03L-0:on 821221,discovered Containment Isolation Valve CFV-27 Inoperative.On 811223 Five Other Valves Were Inoperative.Caused by Failure of Control Relays.Relay Coils & Plungers Replaced ML20040B7881982-01-15015 January 1982 LER 81-081/03L-0:on 811222,while Maintaining Steam Header Pressure for Turbine testing,MSV-35 Code Relief Was Continuously Relieving Approx 50 Lb Below Tech Spec Setpoint.Caused by Setpoint Drift.Valve Lift Setpoint Reset ML20040B7891982-01-15015 January 1982 LER 81-079/03L-0:on 811218,while Increasing Reactor Power, Operator Noted a once-through Steam Generator Operating Level Not Trending Up W/Reactor Power.Caused by Failure of Level Transmitter Amplifier LT-2.Amplifier Replaced ML20040C6641982-01-0606 January 1982 LER 81-078/03L-0:on 811208,during Normal Operation,Emergency Feedwater Ultrasonic Flow indicator,FW-313-FI Exceeded Zero Check Low Limit.Caused by Inability of Instrument to Consistently Indicate Zero Flow.Instrument re-zeroed ML20039C5511981-12-23023 December 1981 LER 81-077/03L-0:on 811204,B Emergency Diesel Generator Control Circuit Discovered Grounded During Surveillance Procedure SP-354,rendering Generator Inoperable.Caused by Electrical Conduit Separation,Rubbing Insulation Off Wiring ML20039C5281981-12-23023 December 1981 LER 81-066/03L-1:on 811010,11,13,17,20,26,27,1130,1201 & 02, Fifteen Reactor Protection Instruments Found Out of Tolerance.Caused by Instrument Drift,Bellow Failure,Loose Test Point Output Terminal & Defective Photo Cell ML20005C0271981-11-0606 November 1981 LER 81-066/03L-0:on 811010,various Reactor Protection Instruments Found Out of Tolerance.Caused by Bellows Failure,Instrument Drift & Loose Test Point Output Terminal. Bellows Replaced,Terminal Tightened & Instruments Recalibr ML20005A3021981-06-23023 June 1981 LER 81-029/03L-0:on 810522,emergency Feedwater Ultrasonic Flowrate Indicator FW-313-FT Was Discovered in Fault Condition & Would Not Reset.Caused by Failed Power Supply Board in Transmitter.Board Replaced ML20004E4941981-06-0505 June 1981 LER 81-028/03L-0:on 810509,emergency Feed Pump EFP-1 Found Inoperable.Caused by Overheating of Packing Due to Routine Wear.Pump Repacked & Functionally Tested ML19347F5071981-05-12012 May 1981 LER 81-025/03L-0:on 810417,EFP-2 Control Switch Discovered in Off Position.Caused by Procedural Deficiencies.Procedures Modified to Require Assurance That EFP-2 Is Selected to Auto ML19347F5141981-05-11011 May 1981 LER 81-024/03L-0:on 810414,emergency Diesel Generator 1A Found Inoperable During Monthly Test SP-354.Caused by Plugged Oil Separator in Air Ejector Train.Procedure Being Revised to Increase Cleaning & Insp Frequency ML19350D7711981-05-11011 May 1981 LER 81-022/03L-0:on 810412,following Reactor Trip,Main Steam Isolation Valve Msv Found Inoperable.Cause Undetermined.Mods Performed to Improve Valve Operation & Reliability. Functional Test Results Satisfactory.Operability Restored ML19345G8571981-04-14014 April 1981 LER 80-059/04L-0:on 810316,deviations from Fall 1980 Environ Rept Noted.Cause Not Determined Conclusively.Study Will Continue.No Corrective Action Can Be Accomplished Until Cause Clearly Established ML20004C6191981-04-10010 April 1981 LER 81-019/03L-0:on 810313,during Normal operation,RC3,RC6 & RB3 Relays Tripped in Emergency Safeguards Actuation Channel B.Cause Attributed to Failed Hamlin Relay.Maint Revealed Addl Faulty Relays.Hamlin Replaced W/Cryden Relays ML20003E4361981-03-31031 March 1981 LER 81-016/03L-0:on 810304,breaker for DHV-110,decay Heat Pump a Discharge Throttle Valve Tripped.Cause Unknown. DHV-110 Repetitively Cycled W/No Failures ML19350C7121981-03-31031 March 1981 LER 81-014/03L-0:on 810301,Clark Relay Model 5UK6-3 in Reactor Bldg Isolation Channel B,Group 2,failed to Actuate When Coil Was de-energized During SP-130.Caused by Burr on Relay Shaft.Relay Replaced 1993-06-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G0191999-10-15015 October 1999 Safety Evaluation Concluding That Licensee Followed Analytical Methods Provided in GL 90-05.Grants Relief Until Next Refueling Outage,Scheduled to Start on 991001.Temporary non-Code Repair Must Then Be Replaced with Code Repair 3F1099-19, Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated1999-10-13013 October 1999 Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated ML20217B0931999-10-0606 October 1999 Part 21 Rept Re Damaged Safety Grade Electrical Cabling Found in Supply on 990831.Damage Created During Cabling Process While Combining Three Conductors Just Prior to Closing.Vendor Notified of Reporting of Issue ML20212L0881999-10-0404 October 1999 SER Accepting Licensee Requests for Relief 98-012 to 98-018 Related to Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp for Crystal River Unit 3 ML20212J8941999-10-0101 October 1999 Safety Evaluation Supporting Amend 188 to License DPR-72 ML20212J8631999-10-0101 October 1999 Safety Evaluation Supporting Licensee Proposed Alternatives to Provide Reasonable Assurance of Structural Integrity of Subject Welds & Provide Acceptable Level of Quality & Safety.Relief Granted Per 10CFR50.55a(g)(6)(i) 3F1099-02, Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With ML20212E9031999-09-30030 September 1999 FPC Crystal River Unit 3 Plant Reference Simulator Four Year Simulator Certification Rept Sept 1995-Sept 1999 ML20212E6911999-09-21021 September 1999 Safety Evaluation Supporting Proposed EALs Changes for Plant Unit 3.Changes Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 ML20212B6821999-09-13013 September 1999 Safety Evaluation Supporting Amend 187 to License DPR-72 ML20211P0661999-09-0808 September 1999 SER Accepting Proposed Transfer of License to Extent Held by City of Tallahassee to Fpc,Plant,Unit 3 ML20211L3881999-09-0303 September 1999 Safety Evaluation Supporting Amend 186 to License DPR-72 ML20211L1321999-08-31031 August 1999 EAL Basis Document ML20212C1501999-08-31031 August 1999 Non-proprietary Version of Rev 0 to Crystal River Unit 3 Enhanced Spent Fuel Storage Engineering Input to LAR Number 239 3F0999-02, Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With ML20211C2911999-08-23023 August 1999 Safety Evaluation Supporting Amend 185 to License DPR-72 ML20211B7291999-08-16016 August 1999 Rev 2 to Cycle 11 Colr ML20210U8461999-08-16016 August 1999 Safety Evaluation Supporting Amend 184 to License DPR-72 ML20210S6791999-08-12012 August 1999 Safety Evaluation Supporting Amend 183 to License DPR-72 ML20210S9831999-08-11011 August 1999 Safety Evaluation Supporting Amend 182 to License DPR-72 ML20210P1111999-08-0505 August 1999 SER Accepting Evaluation of Third 10-year Interval Inservice Insp Program Requests for Relief for Plant,Unit 3 ML20210U5341999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Crystal River,Unit 3 ML20209F5601999-07-31031 July 1999 EAL Basis Document, for Jul 1999 ML20210G1611999-07-27027 July 1999 Safety Evaluation Supporting Amend 181 to License DPR-72 05000302/LER-1999-003, :on 950902,operation Prohibited by ITS Was Noted.Caused by Inadequate Development of Instrumentation Specification.Issued Short Term Instruction & Clarification of ITS Bases.With1999-07-0101 July 1999
- on 950902,operation Prohibited by ITS Was Noted.Caused by Inadequate Development of Instrumentation Specification.Issued Short Term Instruction & Clarification of ITS Bases.With
3F0799-01, Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With ML20210U5411999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Crystal River,Unit 3 ML20196K6321999-06-28028 June 1999 Safety Evaluation Supporting Amend 180 to License DPR-72 ML20195C6161999-06-0303 June 1999 Safety Evaluation Supporting Amend 177 to License DPR-72 3F0699-07, Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With ML20210U5601999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Crystal River,Unit 3 ML20195C6271999-05-28028 May 1999 Non-proprietary Rev 0 to Addendum to Topical Rept BAW-2346P, CR-3 Plant Specific MSLB Leak Rates ML20196L2031999-05-19019 May 1999 Non-proprietary Rev 0 to BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs ML20206H2781999-05-0505 May 1999 Safety Evaluation Supporting Amend 176 to License DPR-72 ML20210U5631999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Crystal River,Unit 3 3F0599-04, Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With ML20206C9121999-04-27027 April 1999 Safety Evaluation Supporting Amend 175 to License DPR-72 ML20205R9031999-04-20020 April 1999 Safety Evaluation Supporting Amend 174 to License DPR-72 ML20206D1831999-04-13013 April 1999 Safety Evaluation Supporting Amend 173 to License DPR-72 ML20205N6521999-04-0808 April 1999 Safety Evaluation Supporting Amend 172 to License DPR-72 3F0499-04, Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With ML20204D9661999-03-31031 March 1999 Non-proprietary Rev 1,Addendum a to BAW-2342, OTSG Repair Roll Qualification Rept 3F0399-04, Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease1999-03-10010 March 1999 Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease 05000302/LER-1999-002, :on 990212,exceedance of Radiological Dose Rate Limit of 10CFR20.1301(a)(2) Occurred.Caused by Contaminated Clothing Worn by French Contractor.Surveyed Other Plant Areas Visited by Subject Contractor.With1999-03-0909 March 1999
- on 990212,exceedance of Radiological Dose Rate Limit of 10CFR20.1301(a)(2) Occurred.Caused by Contaminated Clothing Worn by French Contractor.Surveyed Other Plant Areas Visited by Subject Contractor.With
3F0399-03, Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With ML20203A4381999-02-0303 February 1999 Safety Evaluation Supporting EAL Changes for License DPR-72, Per 10CFR50.47(b)(4) & App E to 10CFR50 ML20206E9261998-12-31031 December 1998 Gainesville Regional Utilities 1998 Annual Rept ML20206E9891998-12-31031 December 1998 Kissimmee Utility Authority 1998 Annual Rept 3F0199-05, Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With ML20206E9701998-12-31031 December 1998 Ouc 1998 Annual Rept. with Financial Statements from Seminole Electric Cooperative,Inc 1999-09-08
[Table view] |
Text
. _- . . . _ _ _ - - - _ . ______ _ - - - _
1 .
U.S.NUCLEAA REGULAfoeY COase.assacas i N,RC i.n ,7oAas 388
~* LICENSEE EVENT REPORT EXHISIT A l j
ietsui e=Nr oA TYM ALL REQUIRED INFopMafloNa l CoNtRob StoCo i I I i 1 I IQ '
[TTTl lF 1 ,,,,.mu LI Q. R) P 3 Iglu0 l 0 l- i O Oi 0 j Og0 ; ;0 i 0lgg 4: l i1gl ; 1u lgg q _lg . , , * .
'l
, . , .,u. .. n u - ... n .. ven a r...
con v j .
i lalil
, e
[**,"c' M u
)l 0! 51ooc..,
0 -101301 w ...
21gi.o : i to ol9
,. . I 718 l@l n ,o.re a O!2 ! al2a.noI 7 I al@
> ...c. .a 4
avsNr ossCmPTICN AND PACS ASLE CoNSEQbENCES notified Unit 3 that during the performange g i n mode 1 operation, Units 1 &
I
, of the :able Tunnel Sump Pump Operability, SP-322, one of the two sump , f
, , , , , , pumpe fail ed to start contrary to Tech Spec 3.8.1.1.a. No safety hazard , ,
i
,, ,,, , as both emergency diesel generators were available and verified operable. ,
g ,, , , Breaker vr.rification SP-321 was performed satisfactorily. Maintenance 1
,,,,,, restored the sump pump operable within seven hours. Second occurrence. ~ g
,,,,,, Refer to LER 78-002/03L-0. i OE C 6 $69 Q 4 C3980%4%TECD4 3 Si. [
u,,w. it i s I@ t,,sj@ L,,Aj@ IP I Ul Mf H X[,jg@
b4C008[,,,CJ@
u (,,2,J m @
.gviticae CCC:Jte .spo.et S.E.Q.t.;
.4 s t,fi.6 =.t %C3 - ..
o.e,.3
@ ,,a.=;*j"
_u i 'I I L-.-J u
10 I O f Si
.. u y,,
iO!31 i LI a
8u W
u
=w a:n 'ww , x.u : .;:. u *i: = .zie:..
t_ zJ O I o lo 1 0 9= 1 L.L.I@ NJO Iz !@ lM 0 710 f@
g.u@g.u@ u,u@
. . . 2 . .,
CAUSE DESCMif f1 cps AND CORRICflVE ACTIONS
, , , c , g The cause of this event was to failure of the starr control bulb switch g , of the sump pump installed on 4 January 1978. The current capacity of the, t
, start switch supplied with packaged pump was inadequate. The switch was ,
l 7 , renewed with one of a higher current capacity and operability of the pump ,
, , , , , was restored. ,
's,*.'j 7 *.:ws= we= ,t.v.s @ 5'E:NSI* : se: t.* :ss:=*t . a @
I,,+1 W @ lot 615 lgl NA l Q gl Operator obsarration l e g,,,,,, ga.,,,, u .: - n-
n,s.- @i u ... ...m m,. .z,j (
@. .. ..u .Ly,,,1@l i
4% s o.on u i NA i tvw.ge tvet !!S:.T*04 i n t 1 16 10 i Ol@W@l" A l
..,m.
..u ,'s'aiu=u: -.:%@
t i i- 5l 10 ! 0 i Ol@l NA I F P 11 12 33 T' ' *
NA R b., @lu I
- '#c ' 5 C' u
, R g,Q*L..j .e%@
, NA f ri ::::::: : ,
e . . 2 g << o sa
] . Cocoer ,,cy, (904) 7o5 4486'
%Avs cs >=cea,
, l.
. '8002 270 ( W l
,g
. . . , , SUPPLEMENTARI INFORMATION N
- 1. Repor No.: 50-302/78-005/03L-0
- 2. Facility: CrystalRiverdnit #3
- 3. Raport Date: 2 February 1978
- 4. Occurrence Date: 9 January 1978
- 5. Identification of occurrence:
Failure of one cable tunnel pump sump to start creating a condition contrary to Technical Specification 3.8.1.1.a.
- 6. Conditions Prior to Occurrence:
Mode 1 operation.
- 7. Description of Occurrence:
i At 0001, the Units 1 & 2 Shift Supervisor notified Unit 3 that when performing the .
Cable Tunnel Sump Pros Operability Surveillance Procedurs SP-322, one of the two sump pumps failed c: start. The one hour Action Statement of Technical Specification 3.8.1.1. was entered md both emergency diesel generators were verified operable and the Breaker Verificacica, SP-321, was performed. Units 1 & 2 maintenance restored operability of the sump pump at 0640 and SP-322 was complaced satisfactorily.
Designation of Apparent Cause:
The current capacity of the start control bulb switch for the pump installed en 4 January 1978 was inadequate, the switch failed rendering the pump inoperable.
- 9. Analysis of Occurrence:
There was no safety hazard to the plant or general public as both "3A" and "33" emergency diesel generators were available and verified operable.
- 10. Corrective Action: -
No corrective serion necessary as installation of a start control bulb switch of adequate current capacity restored operability of the pump.
l.. Failure Data:
This is the second occurrence of this event as reported by LER 78-002/03L-0.