ML19308D179

From kanterella
Jump to navigation Jump to search
Forwards LER 78-005/03L-0
Date released: 11/18/2019 Download: ML19308D179


LER 78-005/03L-0:on 780109,one Sump Pump Failed to Start During Cable Tunnel Sump Pump Operability Test SP-322 Performance.Caused by Failure of Start Control Bulb Switch Due to Inadequate Current Capacity
ML19308D183
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/02/1978
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19308D183 (2)
Forwards LER 78-005/03L-0
ML19308D178
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/06/1978
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19308D178 (1)