ML19305A090

From kanterella
Jump to navigation Jump to search
Forwards LER 78-017/01T-0
ML19305A090
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/20/1978
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19305A092 List:
References
NUDOCS 7901040115
Download: ML19305A090 (1)


Text

I

%6

~ '

  • ,4 WISCONSIN Electric eowen couesur 231 WEST MICHIGAN, MILWAUKEE, WISCONSIN 53201 December 20, 1978 Mr. James G. Keppler, Regional Director Office of Inspection and Enforcement Region III U. S. NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

DOCKET 50-266 POINT BEACH NUCLEAR PLANT LICENSEE EVENT REPORT 78-017/0lT-0 Enclosed is Licensee Event Report 78-017/0lT-0 (a 14-day follow-up report) with an attachment which provides a description of an event reportable in accordance with Technical Specification 15.6.9.2.A.2, " Operation of the unit or affected systems when any parameter of operation is less conservative than the least conservative aspect of the limiting condition for operation established in the Technical Specifications".

On December 20, Mr. James G. Greenwood spoke to Mr. Ned Choules, and informed him that this Licensee Event Report would be submitted two days late. He trust this slight delay has caused you no inconvenience.

Very truly yours,

/1 / -

M Exec tive Vice President Sol Burstein Attachments 3 7 1978 790104OM

[w