ML19305A092

From kanterella
Jump to navigation Jump to search
Forwards LER 78-017/01T-0
Date released: 11/15/2019 Download: ML19305A092


LER 78-017/01T-0 on 781206:control Rod K-7 Control Bank D Became Misaligned More than 15 in & Caused Quadrant Flux Tilt of More than 2%.Caused by Personnel Error
ML19305A093
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/19/1978
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To:
References
Download: ML19305A093 (4)
Forwards LER 78-017/01T-0
ML19305A090
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/20/1978
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19305A090 (1)