ML19296C087

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-416/79-26 & 50-417/79-26 on 791016-19 & Notice of Violation
ML19296C087
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 10/31/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML19296C067 List:
References
NUDOCS 8002250196
Download: ML19296C087 (2)


See also: IR 05000416/1979026

Text

s

/ R M0g%

Q

UNITED STATES

'

l ' 3 .,y El

NUCLEAR REGULATORY COMMISSION

$

$

$

REGION ll

"

,

o,

[

101 MARIETTA ST

N.W., SUITE 310o

[

ATLANTA, GEORGI A 30303

.....

OCT 311979

In Reply Refer To:

RII:JRH

50-416/79-26

50-417/79-26

Mississippi Power and Light Company

ATTN:

N. L. Stampley

Vice President of Production

P. O. Box 1640

Jackson, MS 39205

Gentlemen:

This refers to the inspection conducted by J. R. Harris of this office on

October 16-19, 1979, of activities authorized by NRC Construction Permit

Nos. CPPR-118 and CPPR-119 for the Grand Gulf facility, and to the discussion of

our findings held with J. C. Fuller at the conclusion of the inspection.

Areas examined during the inspection and our findings are dircussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Section 2.201 requires you to submit to this office, within 20

days of your receipt of this notice, a written statement or explanation in reply

including:

(1) corrective steps which have been taken by you and the results

achieved; (2) corrective steps which will be taken to avoid further noncom-

pliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

8002250l%

.

,

OCT 311979

{

Mississippi Power and Light

-2-

Company

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

['f-h'..' y f=m

is

-

L

f

/

'

,

C. E. Murphpitef'

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-416/79-26

and 50-417/79-26

cc w/ encl:

C. K. McCoy, Plant Manager

P. O. Box 756

Por*. Gibson, MS 39150