I MISSISSIPPI POWER & LIGHT COMPANY r$
Helping Build Mississippi y
I
- - a M P. O. B O X 16 4 0, J A C K S O N, MISSISSIPPI 39205 November 26,'1p79 lu
- 1. O b eaooucno~ ot e nmi e Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W., Suite 3100 Atlanta, GA 30303 Attention:
Mr. J. P. O'Reilly, Director
Dear Mr. O'Reilly:
SUBJECT:
Grand Gulf Nuclear Station File 0272/0490/15521/0493/
C-191.0 RII: JRH 50-416/417/79-26 Response to NRC Site Inspection Report 79/26 AECM-79/140 MP&L is requesting an extension to respond to the infraction stated in Inspection Report 50-416/79-26. Pittsburg Testing Laboratory, the subcontractor responsibic for testing and control of selves at Grand Gulf, has rec uested concurrence from the NRC that calibration of selves by the user is not required. An unsigned copy of the inquiry is attached.
(Only the original was signed by PTL.)
Our response to the item which you stated " appears to be in noncompliance with NRC requirements" will be dependent upon the interpretation rendered in response to the above letter. Due to the time required to obtain the requested interpretation, our response relative to this matter is scheduled for April 4, 1980 or within 30 days of the NRC response to the Pittsburg Testing Laboratory position.
Yours truly, J. P. McGaughy, Jr.
Director of Power Production TER:dp cc:
Mr. N. L. Stampley 8002250l $L Mr. R. B. McGehec Mr. T. B. Conner Mr. Victor Stello, Director Division of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 Nd878
?
' L COPh:
Member Middle South Utilities System