UNITED STATES
pm Rf g
E
No
NUCLEAR REGULATORY COMMISSION
5
REGION l
,(
$
.%
..g
631 PARK AVENUE
- '
C
KING OF PRUSSI A PENNSYLVANIA 19406
%d
- * ~ ~
OCT 3 31979
Docket Nos. 50-317
50-318
Baltimore Gas and Electric Company
ATTN: Mr. A. E. Lundvall, Jr.
Vice President - Supply
P.O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject: Combined Inspections 50-317/79-14 and 50-318/79-11
This refers to the inspection conducted by Mr. G. Kalman of this office on
August 27-30 and September 10-13, 1979, at Calvert Cliffs, Units 1 and 2, Lusby,
Maryland, of activities authorized by NRC License Nos. DPR-53 and DPR-69 and to
the discussions of our findings held by Mr. Kalman with Mr. L. Russell and
others of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Our inspector also verified the steps you have taken to correct the item of
noncompliance brought to your attention in a letter dated January 17, 1979.
We
have no further questions regarding your action at this time.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompli-
ance has been categorized into the levels as described in our correspondence to
you dated December 31, 1974.
This notice is sent to you pursuant to the pro-
visions of Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10,
Code of Federal Regulations.
Section 2.201 requires you to submit to this
office, within twenty (20) days of your receipt of this notice, a written
statement or explanation in reply including:
(1) corrective steps which have
been taken by you and the results achieved; (2) corrective steps which will be
taken to avoid further items of noncompliance; and (3) the date when full com-
pliance will be achieved.
80022g0 g
i
}
. f,9
' ' *
-
.
.
Baltimore Gas and Electric Company
2
GCT 3 01979
We are concerned regarding the repetitious occurrence of the event which led to
the item of noncompliance as set forth in the Notice of Violation, enclosed
herewith as Appendix A.
Consequently, in your reply, you should describe in
particular, those actions taken or planned to improve the effectiveness of your
management control systems.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any infor-
mation that you (or your contractor) '-lieve to be proprietary, it is necessary
that you make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must be accom-
panied by an affidavit executed by the owner of the information, which identi-
fies the document or part sought to be withheld, and which contains a statement
of reasons which addresses with specificity the items which will be considered
by the Commission as listed in subparagraph (b)(4) of Section 2.790.
The
information sought to be withheld shall be incorporated as far as possible into
a separate part of the affidavit.
If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
a gi
Boyce H. Grier
Director
Enclosures:
1.
Appendix A, Notice of Violation
2.
Combined Office of Inspection and Enforcement Inspection Report
Numbers 50-317/79-14 and 50-318/79-11
cc w/encls:
R. M. Douglass,fianager, Quality Assurance
L. B. Russell, Chief Engineer
W. Gibson, General Supervisor, Operations QA
R. C. L. Olson, Senior Engineer
K. H. Sebra, Principal Engineer